Time Table For The Proposed Coffee Shop: January Activities October November December

This document outlines the proposed timeline for construction of a coffee shop over 4 months from October to January. It details 17 activities needed such as planning, permitting, site preparation, foundation work, structural framing, mechanical and electrical installations, and finishing work. Each activity is assigned to a specific 1-week period to complete that portion of the project on schedule by the end of January.

Uploaded by

Zherrinore Rasay
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
49 views

Time Table For The Proposed Coffee Shop: January Activities October November December

This document outlines the proposed timeline for construction of a coffee shop over 4 months from October to January. It details 17 activities needed such as planning, permitting, site preparation, foundation work, structural framing, mechanical and electrical installations, and finishing work. Each activity is assigned to a specific 1-week period to complete that portion of the project on schedule by the end of January.

Uploaded by

Zherrinore Rasay
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

TIME TABLE FOR THE PROPOSED COFFEE SHOP

ACTIVITIES
Planning, design, drawings
Permits and clearances
Mobilization/demobilization
Site preparation
Excavation
Formworks and rebars
Concrete foundation
Structural steel
Masonry works
Painting works
Carpentry works
Door and windows
Roofing works
Plumbing works
Electrical works
Exterior finishes
Land scapping

OCTOBER
WEEK 1

WEEK 2

WEEK 3

NOVEMBER
WEEK 4

WEEK 1

WEEK 2

WEEK 3

DECEMBER
WEEK 4

WEEK 1

WEEK 2

WEEK 3

JANUARY
WEEK 4

WEEK 1

WEEK 2

JANUARY
WEEK 3

WEEK 4