0% found this document useful (0 votes)
66 views

Training Plan For Year 2010: CSL Technologies (M) SDN BHD LRC Tech (M) SDN BHD

The document outlines a training plan for all departments of CSL Technologies (M) Sdn Bhd and LRC Tech (M) Sdn Bhd for the year 2010. It includes 14 training courses or topics to be conducted throughout the year, such as Quality Management System of ISO 9001:2008, Supervising without Supervision, and Job Description, Procedure & Form + Co. Policy. The training plan specifies the month each course will take place and which departmental personnel will attend each session. It was approved by the Director.

Uploaded by

Idrus Ismail
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views

Training Plan For Year 2010: CSL Technologies (M) SDN BHD LRC Tech (M) SDN BHD

The document outlines a training plan for all departments of CSL Technologies (M) Sdn Bhd and LRC Tech (M) Sdn Bhd for the year 2010. It includes 14 training courses or topics to be conducted throughout the year, such as Quality Management System of ISO 9001:2008, Supervising without Supervision, and Job Description, Procedure & Form + Co. Policy. The training plan specifies the month each course will take place and which departmental personnel will attend each session. It was approved by the Director.

Uploaded by

Idrus Ismail
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

CS-F06

REV.0

CSL TECHNOLOGIES (M) SDN BHD


LRC TECH (M) SDN BHD

TRAINING PLAN FOR YEAR 2010


Department: ALL

No.

Training / Course Title

1.
2.
3.
4.
5.
6.

Quality Management System of ISO 9001:2008


Supervising without Supervision
CIDB Safety & Healthy for Worker
Job Description, Procedure & Form + Co. Policy
Job Description, Procedure & Form + Co. Policy
Job Description, Procedure & Form + Co. Policy

7.
8.

Job Description, Procedure & Form + Co. Policy


Job Description, Procedure & Form + Co. Policy

9.
10.
11.
12.

Job Description, Procedure & Form + Co. Policy


Job Description, Procedure & Form + Co. Policy
Job Description, Procedure & Form + Co. Policy
Job Description, Procedure & Form + Co. Policy

13.

CSG Employee Portal, Social Portal & Green


Campaign
Production Flow

14.
Note:

Department /
Personnel
All Dept.
FZ, ND
HT, FZ, KC, JY
R &D / ND, NN
Production / ND, NN
Production / Budha,
Quan
Project / KC, HT
Sales & Marketing /
JY, AC, KC
Admin / ED
Design / FZ, AZ
Store/ Babul
Production / Line
Leader
All Dept.

Month
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

x
x
x
x
x
x
x
x
x
x
x
x
x

Production / DL, NN

Planned
Completed

Approved by:

Date:
(Director)

You might also like