The document outlines a project proposal to analyze Phuentsholing's existing lagoon sewage treatment system and design a compact plant. It involves: 1) Studying the current system and population data to predict maximum sewage volumes; 2) Verifying the lagoon system cannot treat increasing waste from population growth; 3) Designing a new treatment plant considering water quality, discharge quantities, and climate. Key parameters for the new plant design include treatment methods suitable for the city's conditions.

Uploaded by

KusanSanjit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

Proposal Outline

The document outlines a project proposal to analyze Phuentsholing's existing lagoon sewage treatment system and design a compact plant. It involves: 1) Studying the current system and population data to predict maximum sewage volumes; 2) Verifying the lagoon system cannot treat increasing waste from population growth; 3) Designing a new treatment plant considering water quality, discharge quantities, and climate. Key parameters for the new plant design include treatment methods suitable for the city's conditions.

Uploaded by

KusanSanjit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Draft Project Proposal Outline

Project Topic: Analysis of Lagoon Sewage Treatment System and Design for Compact Plant
Action Plan:

Preliminary Action for Project Proposal:


-

Study of the present plan and scheme


Assessment of the present waste water treatment plant
Collect the population data inclusive of the mobile population (basically temporary
migrants)
Collect the rainfall data and using empirical formula formulate the rainfall intensity
equation and then calculate the catchment maximum discharge i.e. storm water
volume/discharge
Predict the maximum volume of sewage water i.e. storm water and waste water
Verify that present form of waste water is not capable of treatment for long term
prospect keeping into consideration the population increment and discharge capacity
of present treatment plant i.e. lagoon system
Thus, proposal for expansion and improved waste water treatment process is required

Design Parameters for expansion and implementation of new waste water treatment

plant:
Water quality parameters and the variation with respect to various months/season
Collection of climatic data like temperature and rainfall data.
Study and revision of sewage master plan for updating the sewer line system
Analysis for various methods for sewage treatment which can most suitable for
Phuentsholing city based upon the parameters of water quality, discharge quantity,
climatic conditions
Design for the treatment plant and verify by developing a working model/prototype