The daily construction report summarizes work activity on a construction project at Iowa State University. It provides details on weather conditions, the number of workers on site by trade, visitors to the site, safety inspections and activities, progress made, deliveries, meetings and decisions. Unresolved issues and potential delays are also noted.

Uploaded by

Raj Bhushan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
408 views

Daily Construction Report

The daily construction report summarizes work activity on a construction project at Iowa State University. It provides details on weather conditions, the number of workers on site by trade, visitors to the site, safety inspections and activities, progress made, deliveries, meetings and decisions. Unresolved issues and potential delays are also noted.

Uploaded by

Raj Bhushan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

IOWA STATE UNIVERSITY

DAILY CONSTRUCTION REPORT


PROJECT TITLE:

CONTRACTOR:

DATE:

REPORT BY:
DAY:

REPORT NO:

WEATHER
TEMPERATURE

CONDITIONS
Low Temperature:
High Temperature:

NOTES

A.M
Partly Cloudy
Cloudy
Windy
Rain
Snow
Other

P.M
.

WORKMEN/VISITORS
TOTAL
Abatement
Balancing
Carpenters
Caulking
Ceiling
Concrete Finishers
Control
DDC
Electricians
Elevator

TOTAL
Field Staff
Finish Carpenters
Flooring
Insulator
Iron Workers
Laborers
Landscapers
Masons
Operators
Painters

TOTAL
Plasterers
Plumbers
Roofers
Sheet metal
Sheet rockers/Tapers
Sprinkler
Tile Setters
Watchmen
Windows

TOTAL
Others: (list trade)

TOTALS:

VISITORS TO THE SITE

TESTS/INSPECTIONS

SAFETY
HOT WORK ACTIVITIES: (HOT WORK SUPERVISOR)
TIME

ACTIVITY

ACCIDENTS, INJURIES, OR UNUSUAL EVENTS

)
FIRE WATCH PERSONNEL FOR ACTIVITY

PROGRESS OF WORK
KEY ACTIVITIES AND MATERIAL DELIVERIES

ITEMS ACCOMPLISHED

MEETINGS AND SIGNIFICANT DECISIONS

UNRESOLVED ISSUES / FACTORS CONTRIBUTING TO DELAY

OTHER NOTES