Level 2 Building Information Modelling Workflow Overview (Draft)

The document outlines a BIM workflow overview for a construction project. It shows key stages and handovers of the project from design to construction to facilities management. It includes stages for team selection, developing BIM execution plans, regular data drops and reviews, developing as-built and as-maintained models, and ultimately handing over asset data to the client.

Uploaded by

Gavin Bonner
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views

Level 2 Building Information Modelling Workflow Overview (Draft)

The document outlines a BIM workflow overview for a construction project. It shows key stages and handovers of the project from design to construction to facilities management. It includes stages for team selection, developing BIM execution plans, regular data drops and reviews, developing as-built and as-maintained models, and ultimately handing over asset data to the client.

Uploaded by

Gavin Bonner
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Level 2

Building Information Modelling


Workflow Overview (Draft)
FM/
SLi2

Team Selection: BIM Criteria

COBie
UK 2012
Templates
&
Protocols

Facilities Management
Soft Landings
Intervention Points

PAS1192
Parts
2&3

Start / Finish
FM/
SLi1

FM
BEP

Domain
Specific
BIM
Execution
Plans

Design Team
BEPs

Contractor
BEP

Clients
BIM
Project
Implementation
Plan

* Project Brief
* Specification
* FM Strategy
* Usage Strategy
* Success Metrics
* Data requirements

Feedback Loop to Drop 1


(Including social data)

Competency
Assessment &
BEP validation /
approval
(PIX protocol?)

* Model governance
* Standards
Delivery Team
* Collaborative
working
Methodology
* Lean
* Safe by design

Task Group
BIM
Standards,
Protocols &
Guidance

FM/
SLi

Points
Of
Reference

BIM
Use Cases
identified

Question
Sets to be
Answered

Briefing For Better Outcomes


Q4

Q3

Q2

Q1

Level of
Definition
As-Mainatin
Baseline
Models

Post occupancy
validation

As-Built
Models

WIP

WIP

as-is
Data e.g.
point cloud /
site analysis
data

WIP

Aggregated
BIM Execution &
Data Management
Plan

Strategic Data (HMT requirements)

Model Outcomes

FM/
SLi3

Asset & Dept Portfolio Management


Planned Preventative Maintenance /
Whole Life cost

As-Maintained Model Management


Data Bus bar (Data Management)

Data Drops

D2

D1

D4

D3

D5

nD

nD

nD

nD

ique

t Un
Clien

FM

COBie Data Migration


to Client Asset Management
Platform

Feedback loop to drop 4

data

CapEx COBie Data


Gateway
Reviews

Client Unique FM data

Operational COBie Data

Asset - Business case validation


FM/
SLi5

FM/
SLi4
Project Lifecycle

In-use
Asset
Data
Set

Preperation

Design

FM/
SLi6
Preconstruction

FM/
SLi7
Construction

FM Aftercare Gateway Reviews

Operational use

Copyright Bew/Philp Feb2012 (Unrestricted)