The document outlines a schedule of activities for a project investigating the effect of aggregate size on concrete breakout performance using cast-in-place anchor bolts. The schedule spans November to February and includes tasks such as purchasing materials, conducting ASTM tests to determine aggregate properties, designing concrete mixes, casting and curing concrete specimens, performing pullout tests, analyzing data, and preparing and presenting the project defense. The schedule assigns specific weeks for each activity and calculates the project completion percentage achieved at different points in time.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Schedule Thesis

The document outlines a schedule of activities for a project investigating the effect of aggregate size on concrete breakout performance using cast-in-place anchor bolts. The schedule spans November to February and includes tasks such as purchasing materials, conducting ASTM tests to determine aggregate properties, designing concrete mixes, casting and curing concrete specimens, performing pullout tests, analyzing data, and preparing and presenting the project defense. The schedule assigns specific weeks for each activity and calculates the project completion percentage achieved at different points in time.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Title: INVESTIGATION ON THE EFFECT OF AGGREGATE SIZE ON THE CONCRETE BREAKOUT PERFORMANCE USING CAST-IN-PLACE ANCHOR BOLTS

SCHEDULE OF ACTIVITIES

NO.

ACTIVITIES

Inquire on BRS

Contact Hilti & Lafarge


Purchase Materials For
Concrete Mixing
Schedule on BRS

ASTM C 136, C 127, C 128

ASTM Results
Preparation of Formworks

Design Mix Computation


Anchor Bolt Testing
Concrete Mix

NOVEMBER
DECEMBER
JANUARY
FEBRUARY
WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10 WEEK 11 WEEK 12 WEEK 13 WEEK 14 WEEK 15
13
17-22
24-29
1-6.
8-12.
15-19.
22-26.
2
5-9.
12-16.
19-23.
26-30.
2-6.
9-13.
7.14%

14.28%

21.42%
28.56%

35.71%

ASTM C143

Concrete Curing
Testing for Compressive
Strength
Testing for Compressive
Strength
Pullout Test

Data Analysis

10

Paper Works

11

Ready for Defense

12

Defense Week

6
7

Members:
Cristobal, Justine Jeff M.
Decipar, Gellie Ann T.
Dela Cruz, Benjamin Jr. H
Milan, Elfredo T.
Ravago, Arnold I G.
Roy, Jamielee Kaye R.

64.29%
42.86%
64.29%
71.43%
78.57%
85.71%
92.86%
100%