List of Deliverabls-Aker Proposal
List of Deliverabls-Aker Proposal
DESCRIPTION
PROCESS
PROCESS RFQ*
B-127-RQ-PR-0001 RFQ for Flame Arrestors
MECHANICAL
MECHANICAL RFQ*
MECHANICAL (ROTARY)
B-127-RQ-ME-001 RFQ for IUG System Package
B-127-RQ-ME-002 RFQ for Compressor Module
B-127-RQ-ME-003 RFQ for Gas / Air Driven Pumps
B-127-RQ-ME-004 RFQ for Deck Crane
B-127-RQ-ME-005 RFQ for DCP Skid
B-127-RQ-ME-006 RFQ for HVAC System
B-127-RQ-ME-007 RFQ for Chain Pulley Blocks
B-127-RQ-ME-008 RFQ for for Pumps
MECHANICAL (STATIC)
B-127-RQ-ME-010 RFQ for Vessels
V-440
V-340
KOD
Test Separator
V-450
V-920
V-520
T-700
V-900
V-350
V-490
Pipe Seperator
Instrument Gas Receiver
Package
PIPING
GENERAL
PMS
VMS
MTO
B-127-MT-PP-0001
B-127-MT-PP-0002
B-127-MT-PP-0003
B-127-RQ-PP-0001
B-127-RQ-PP-0002
B-127-RQ-PP-0003
B-127-RQ-PP-0004
B-127-RQ-PP-0005
B-127-RQ-PP-0006
B-127-RQ-PP-0007
B-127-RQ-PP-008
Preliminary
Equipment
- Piping
MTO (incl Bulks)
Layout
- Valve MTO
- Insulation MTO
PIPING RFQ * ,
RFQ for Speciality Items
- CC
- Sample bomb
- Hinged closure
- 5D Bends
- Scrapper Tee
- Hose & Hose Connection
- Drainer & Strainer
- Fire Water Sprinklers
STRUCTURAL
B-127-DR-ST-0001
GENERAL
Single lIne Deck Framing drawings
B-127-DR-ST-0002
B-127-MT-ST-0001
Deck MTO
B-127-MT-ST-0002
B-127-MT-ST-0003
ELECTRICAL
GENERAL
B-127-LI-EL-0001
B-127-MT-EL-0001
B-127-DR-EL-0001
B-127-LI-EL-0002
B-127-RQ-EL-0001
B-127-RQ-EL-0002
B-127-RQ-EL-0003
B-127-RQ-EL-0004
B-127-RQ-EL-0005
B-127-RQ-EL-0006
INSTRUMENTATION
B-127-MT-IN-0001
B-127-RQ-IN-0001
B-127-RQ-IN-0002
B-127-RQ-IN-0003
B-127-RQ-IN-0004
B-127-RQ-IN-0005
B-127-RQ-IN-0006
B-127-RQ-IN-0007
B-127-RQ-IN-0008
pressure
gauge
RFQ for Temperature
gauge
RFQ for Electronic transmitter
B-127-RQ-IN-0009
B-127-RQ-IN-0010
B-127-RQ-IN-0011
B-127-RQ-IN-0012
B-127-RQ-IN-0013
B-127-RQ-IN-0014
B-127-RQ-IN-0015
B-127-RQ-IN-0016
B-127-RQ-IN-0017
B-127-RQ-IN-0018
B-127-RQ-IN-0019
B-127-RQ-IN-0020
B-127-RQ-IN-0021
B-127-RQ-IN-0022
Notes:
1. RFQ will include the EDL and Datasheets only.