Hvac System Commissioning: Heat Exchanger Pre Inspection Checklist & Tab Report
Hvac System Commissioning: Heat Exchanger Pre Inspection Checklist & Tab Report
System
Building Name
Building No.
Unit Model
Unit Location
DESCRIPTION
RESULTS SATISFACTORY
REMARKS
1.1
YES NO
1.2
YES NO
1.3
YES NO
1.4
YES NO
1.5
YES NO
1.6
YES NO
1.7
YES NO
1.8
YES NO
1.9
YES NO
1.10
YES NO
1.11
YES NO
Page:1 OF 2
System
Building Name
Building No.
Unit Model
Unit Location
UNIT NO. 1
UNIT DESIGNATION
LOCATION
SERVICE
MANUFACTURER
MODEL
SERIAL NO.
PRIMARY WATER SIDE
TEST DATA
DESIGN
ACTUAL
DESIGN
ACTUAL
DATE
NAME
SIGNATURE
COMMISSIONING TEAM
CONSULTANT (SUHAIMI)
ZAMIL INDUSTRIAL GROUP
OPERATION & MAINTENANCE
Page:2 OF 2