Transient Stability: EEE Department Power System Lab-II M. Tech (PSE)
Transient Stability: EEE Department Power System Lab-II M. Tech (PSE)
M. Tech (PSE)
Transient Stability
Problem: Figure shows a single line diagram of a 5-bus system with three generating units, four lines and
two transformers and two loads. Per-unit transmission line series impedances and shunt susceptances are
given on 100 MVA base, generator's transient impedance and transformer leakage reactances are given in
the accompanying table.
Values given are on 100 MVA Base. Frequency = 60 Hz
If a 3 - phase fault occurs on line 4 - 5 near bus 4
and the fault is cleared by simultaneously
opening the circuit breaker at the ends of the line
4-5 at 0.225 seconds (fault clearing time), plot
the swing curve and comment on stability of
machine 1 and machine 2
Line charging
Y'pq/2
j0.041
j0.049
j0.049
j0.113
Transformer Details:
T1 = 20/230 kV 400 MVA with Leakage reactance = 0.022 pu
T2 = 18/230 kV 250 MVA with Leakage reactance = 0.040 pu
Generator Details:
G1 = 400 MVA, 20 kV, X'd = 0.067 pu, H = 11.2 MJ / MVA
G2 = 250 MVA, 18 kV, X'd = 0.10 pu, H = 8.0 MJ / MVA
G3 = 1000 MVA, 230 kV, X'd = 0.00001 pu, H = 1000 MJ / MVA (Infinite Bus Modelling)
Generation and Load Details
Bus
Generation
Code 'p'
MW
1
350
71.2
2
185
29.8
3
800
0
4
0
0
5
0
0
Mvar
0
0
0
100
50
MW
GEN
Load
MW
0
0
0
44
16
Mvar
Specified
Voltage
1.03
1.02
1.0
Unknown
Unknown
MVAR MW
MVAR MVAR
LOAD LOAD COMP
Bhubaneswar
EEE Department
M. Tech (PSE)
Pgen
Qgen
Pmech Efd/Slip
MW
MVAR
MW
pu/PU
350
71.2
350
1.1
185
29.8
185
1.06
-381
-26.2
-381
1
Pgen
Qgen
Pmech Efd/Slip
MW
MVAR
MW
pu/P.U.
5.93
339
350
1.1
162
129
185
1.06
414 3.02E+03
-381
Bhubaneswar