0% found this document useful (0 votes)
1K views

Soalan Interview Tender

The document contains questions about tendering procedures asked during an interview. It asks about the interviewee's background and experience in the field. It then asks them to describe the tendering process, including the purpose and scope of tendering, why it is important, and the differences between tenders and contracts. Further questions cover how long it takes to prepare a tender, how many people are usually involved, whether different tender types have different procedures, and the criteria for tender selection and rejection. The final questions ask about risk management in the tendering process.

Uploaded by

anggerik
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Soalan Interview Tender

The document contains questions about tendering procedures asked during an interview. It asks about the interviewee's background and experience in the field. It then asks them to describe the tendering process, including the purpose and scope of tendering, why it is important, and the differences between tenders and contracts. Further questions cover how long it takes to prepare a tender, how many people are usually involved, whether different tender types have different procedures, and the criteria for tender selection and rejection. The final questions ask about risk management in the tendering process.

Uploaded by

anggerik
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

1.

Can you tell me a little bit about your educational background and your position
in this company?
( Bolehkah anda berkongsi serba sedikit mengenai latar belakang pendidikan
anda dan kedudukan anda dalam syarikat ini ? )

2. How long have you involved in this field? Can you share about your experience
and project that you have involved until now.

( Berapa lama anda sudah terlibat dalam bidang ini ? Bolehkah anda berkongsi
pengalaman dan projek yang anda telah terlibat sehingga kini )

3. Back to our interview topic, could you describe in as much as possible what is
tendering procedure actually?

( Kembali ke topik temubual, boleh anda menggambarkan apakah prosedur


tender sebenarnya? )

4. When you mentioned about tendering procedure, could you expand that point on
purpose and scope of tendering?

( Apabila anda menyebut tentang prosedur tender. Boleh anda huraikan tujuan
dan skop tender ? )

5. Why is tendering procedure is important?

( Mengapa prosedur tender penting ? )

6. What is the difference between tender and contract?

( Apakah perbezaan diantara tender dan kontrak? )

7. How long does it take to prepare one complete tender?

( Berapa lama masa diperlukan untuk siapkan sebuah tender? )

8. Usually, how many people will involve in tendering procedure?

( Kebiasaannya, berapa pihak yang akan terlibat dalam prosedur tender? )

9. There are many types of tenders, is there any different in their procedure?

( Terdapat banyak jenis tender, adakah terdapat perbezaan dalam prosedur


mereka ? )

10. Which type of tender did you prefer and what is the procedure ?

( Jenis tender yang mana anda lebih suka dan apakah prosedurnya?

11. Based on your experienced, what criteria that should have in a tender for tender
selection?

( Berdasarkan pengalaman anda, kriteria apa yang perlu ada dalam sesebuah
tender bagi pemilihan tender?

12. What will you analyses exactly from the tender documentation that have been
submitted by contractors?

( Apakah yang akan dianalisis dengan tepat daripada dokumentasi tender yang
telah dikemukakan oleh kontraktor ? )

13. In this industry, tender rejection is a normal issue. If you dont mind, can you
share some criteria or aspects that may lead to tender rejection?

( Di dalam industri ini, penolakan tender adalah isu biasa . Jika anda tidak
keberatan, boleh anda berkongsi beberapa kriteria atau aspek yang boleh
membawa kepada penolakan tender ? )

14. Is there any risk management in tendering procedure?

( Adakah terdapat risiko dalam pengurusan prosedur tender ? )

15. If yes, could you explain about risk management in tendering procedure?

( Jika ya, boleh anda jelaskan tentang risiko dalam pengurusan prosedur tender
?)

ECM 317: CIVIL ENGINEERING CONSTRUCTION


PROJECT
TENDERING PROCEDURE

NURUL AIEN BINTI MAHAT


2012813018

REFERENCE LECTURER :

PN. ASMAWATI BINTI CHE HASSAN


FAKULTI KEJURUTERAAN AWAM
UITM CAWANGAN JOHOR
KAMPUS PASIR GUDANG.

You might also like