Tunnel
Needed when no other means is practical or adequate or needed to accomplish the required
movement more directly, more quickly or less obstructively.
For Highways, railroad, pedestrian passageway, fresh water conveyance, cooling water
supply, waste water collector or transport, hydropower generator, or utility corridor.
Dia. ranging from less than a meter to more than 15 m, length few meters to several
kilometers.
Constructed by:
Using short prefabricated sections pushed into place from jacking pits,
Tunnels in rocks
-By drilling and blasting,
-By mechanized means, such as tunnel boring machines (TBM) or
continuous miners (roadheaders).
Facilities needed: Ventilation, lighting, fire safety, elaborate traffic surveillance and control
system for modern highway tunnels.
Design include : layout, location, ground conditions, theoretical and practical consideration
of how the tunnel hole is kept open, temporarily during construction and permanently during
operation & use.
Think about :
Try to find out details of channel tunnel and study the construction aspects of it.