Project Charter: Lean Six Sigma

This project charter outlines a Lean Six Sigma project to improve the process sigma level and reduce defects, rework, and repair for an annual production of 72,000 units. The project lead will work with a team of members advised by a team adviser. If successful, the project could save over 192,000 PHP per year by reducing direct labor, indirect labor hours, rework, repair costs and increasing yield. The project will go through the typical DMAIC phases of Define, Measure, Analyze, Improve, and Control with an expected start and closure date yet to be determined.

Uploaded by

Joshua Japitan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

Project Charter: Lean Six Sigma

This project charter outlines a Lean Six Sigma project to improve the process sigma level and reduce defects, rework, and repair for an annual production of 72,000 units. The project lead will work with a team of members advised by a team adviser. If successful, the project could save over 192,000 PHP per year by reducing direct labor, indirect labor hours, rework, repair costs and increasing yield. The project will go through the typical DMAIC phases of Define, Measure, Analyze, Improve, and Control with an expected start and closure date yet to be determined.

Uploaded by

Joshua Japitan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Project Title:

Project Lead

Lean Six Sigma

PROJECT CHARTER

Project Champion

Project Sponsor

Project Description

Team Adviser

Business Case

Problem Statement

Project Objectives

ProjectScope

CTQ/ CTD/ CTC:


Current Baseline Performane and Goal
Project Y's
DPMO/PPM Process Sigma Other Metics Used
Baseline
Goal
Stretch Goal
Annual (12 mo)
Direct Labor
Indirect Labor (hrs)
Rework
Repair
Inc. Yield

Defect Definition

Units

Financial/ Cost Savings Impact


Php/unit
Total
2
3
72000

12000

Php
10

120000

Team Charter

Phase
Closure Cost Savings
Define
Measure
Analyze
192,000.00
Improve
Cotrol
Closure Date:

Team Members:
Approval:

High Level Project Timeline


Start

Team Adviser

ss Case

tScope

Definition

oject Timeline
Finish

You might also like