0% found this document useful (0 votes)
34 views

Cargo Procedure From TO: 2 - Ethyl Hexanol 2 - Ethyl Hexanol

The document lists cargo information including from and to locations and cleaning procedures. It contains 11 entries transporting various chemicals and liquids. The cleaning procedures range from basic flushing and draining to more intensive processes involving water, detergent, steaming, and drying depending on the cargo previously transported.

Uploaded by

kirananne
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Cargo Procedure From TO: 2 - Ethyl Hexanol 2 - Ethyl Hexanol

The document lists cargo information including from and to locations and cleaning procedures. It contains 11 entries transporting various chemicals and liquids. The cleaning procedures range from basic flushing and draining to more intensive processes involving water, detergent, steaming, and drying depending on the cargo previously transported.

Uploaded by

kirananne
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

CARGO

S.NO

FROM
Vervy
no:

TO

1.

32

Butyl Acyrlate

59

Caustic soda

2.

32

Butyl Acrylate

234

Jet fuel

3.

175

234

Jet fuel

4.
5.
6.
7.

175
178
178
08

Mono Ethylene
Glycol - M.E.G.
M.E.G.

59
234
59
234

Caustic soda
Jet fuel
Caustic Soda
Jet fuel

8.
9.

08
402

59

Caustic soda

234

Jet fuel

59

Caustic soda

10.
11.

402

PROCEDURE

Vervy
no:

2 - Ethyl Hexanol
2 - Ethyl Hexanol

Acrylo Nitrile
Acrylo Nitrile
Vinyl Acetate
Monomer V.A.M.
V.A.M.

PROCEDURE {L} - B/W with cold sw fr 2 hrs. B/W with hot


water @ 80 C & 0.05 % liquid detergent {teepol} fr 1 hr. B/W
with warm water fr 1/2 hr. Steaming with Toluene. B/W with
warm fw fr 1/2 hr. Drain pumps,pipes,lines and dry the tk.
PROCEDURE {H} - B/W with warm sw fr 1 hr {50 c},B/W with
hot water fr 1 hr. Steaming,Draining pumps/lines...... & Drying.
PROCEDURE {P} - B/W with warm water fr 1 hr. Flushing with
fw. Steaming , Draining pumps/lines/drains & Drying.
PROCEDURE {P}
PROCEDURE {P}
PROCEDURE {P}
PROCEDURE {D} - B/W cold sw fr 1 hr. Flushing with fw.
Draining pumps/lines/drains & drying.
PROCEDURE {D}
PROCEDURE {J} - B/W with abundant cold sw fr 2 hrs. B/W
with hot water {80 c} & 0.05 % liquid detergent - Teepol fr 1 hr.
B/W with hot water {80 c} fr 1/2 hr. Steaming , Draining
pumps/lines/drains & Drying.
PROCEDURE - {C} - B/W with cold sw fr 1 hr. B/W with warm fw
{50 c} fr 1 hr. Steaming , Draining pumps/lines/drains & Drying.

You might also like