100% found this document useful (1 vote)
2K views

Battery Bank Check List

This document is an installation checklist for a battery bank project in Shahdol, Madhya Pradesh, India. The client is Reliance Industries Limited and the contractor is L&T Hydrocarbon Engineering Limited. The checklist contains 18 items to verify regarding the civil works, battery installation, connections, and documentation for a lead-acid or VRLA battery bank. Upon completion, representatives from L&T and RIL will sign off on the checklist to confirm the battery bank installation meets specifications.

Uploaded by

Raj Kiran
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views

Battery Bank Check List

This document is an installation checklist for a battery bank project in Shahdol, Madhya Pradesh, India. The client is Reliance Industries Limited and the contractor is L&T Hydrocarbon Engineering Limited. The checklist contains 18 items to verify regarding the civil works, battery installation, connections, and documentation for a lead-acid or VRLA battery bank. Upon completion, representatives from L&T and RIL will sign off on the checklist to confirm the battery bank installation meets specifications.

Uploaded by

Raj Kiran
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

CBM FIELD DEVELOPMENT PROJECT

SHAHDOL (MP)
CLIENT : Reliance Industries limited
CONTRACTOR: L&T Hydrocarbon Engineering Limited
Area / Location :

INSTALLATION CHECK LIST FOR BATTERY BANK LEAD ACID/VRL

Drw no:
SL.NO.

DESCRIPTION

Observation

General
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Approved drawing for battery rack and cell arrangement is vailable


Civil work and acid resistant floor as per drawing is completed and area is clear from debris
Battery Room is well ventilated
Battery rating and type is verified
Battery racks are installed as per drawing and anchored properly to floor
Check the tightness of battery rack
Check the alignment of battery rack
Polarity of cells are checked
No physical damage observed on batteries
Cell terminals are cleaned
Batteries are arranged in number wise and rack wise according to approved drawing
Inter cell, inter tier links are done
All exposed terminals and links are caped using manufacturer provided caps
Adequate seperation as per approved drawing shall be provided between the cells for cooling purpose (For VRLA)

E
L
P
M
SA

Inter cell, inter row cablings for VRLA cells are done with appproved cable size or manufacturer supplied cable
Terminal connections tightened/torqued properly as per vendor specification.
Inter rack cabling & cable from isolation box to battery bank is complete
A layer of anti oxidant grease recommended by manufacturer is applied on battery terminals

Page 1 of 4

CBM FIELD DEVELOPMENT PROJECT


SHAHDOL (MP)
CLIENT : Reliance Industries limited
CONTRACTOR: L&T Hydrocarbon Engineering Limited
Area / Location :

INSTALLATION CHECK LIST FOR BATTERY BANK LEAD ACID/VRL

Drw no:
SL.NO.

DESCRIPTION

Observation

L&T
Name
Signature
Date

Page 2 of 4

PMENT PROJECT

L (MP)
Report No :

CHECK LIST FOR BATTERY BANK LEAD ACID/VRLA

Observation

Date :

Remarks

Page 3 of 4

PMENT PROJECT

L (MP)
Report No :

CHECK LIST FOR BATTERY BANK LEAD ACID/VRLA

Observation

Date :

Remarks
RIL

Format No :LT/RIL/CBM/ELEC/ITP/007

Page 4 of 4