Co Gen Procedure

This document outlines the process and deliverables for a 15-day feasibility study project. It includes collecting client requirements and process information on steam demands, electrical demands, bagasse quantities and properties. The project will produce design basis documents, P&IDs, equipment lists, general layout drawings, and bagasse conveyor elevation drawings. It provides time estimates of 5-10 days for each deliverable. The project starts with collecting information and ends with a review and modifications phase.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views

Co Gen Procedure

This document outlines the process and deliverables for a 15-day feasibility study project. It includes collecting client requirements and process information on steam demands, electrical demands, bagasse quantities and properties. The project will produce design basis documents, P&IDs, equipment lists, general layout drawings, and bagasse conveyor elevation drawings. It provides time estimates of 5-10 days for each deliverable. The project starts with collecting information and ends with a review and modifications phase.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Owner

PM

Owner

Project Description
Feasibility Study
Deliverables
Client Requirements

Process

Owner

Process
Steam
Demands

Electrical

Owner

Mechanical

Bagasse
Quantities and
Properties

Power
Demands

Duration
Owner

15 Days

PM

Design basis

Project start

EMB Drawing

PFDs

Duration: 5

Duration

Duration: 5

10 Days

Duration
Duration

7 Days

20

EMB Calculations

Owner

Legend

Owner

Mechanical

Owner

PFDs

Calculation (Spreadsheet)

Deliverable

Specifications
Data

Duration

Duration: 5

15 Days

Duration

5 Days
Duration

Duration

5 Days

Mechanical

General
Layout

Main
Equipment List
& Sizing

General Layout

Duration: 5

Review and Modifications

Owner

Bagasse Conveyors
Elevations Drawing

PFDs

Bagasse
Conveyors
Elevations
Drawing

Mechanical

Mechanical

10 Days

Duration: 5