Shop Drawing of Status Summary

This document provides a status control schedule for shop drawings for a construction project at PT. INOAC POLYTECHNO INDONESIA (IPI) Karawang PU Factory. It lists over 70 drawing numbers categorized as Construction Method, Structure, Architecture General, and Architecture Room Detail drawings. It provides the drawing title, original submittal date, actual submittal date, and dates for shop drawing reviews and approvals between IPI and the contractor SMCC UTAMA INDONESIA.

Uploaded by

ANJellHwan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
270 views

Shop Drawing of Status Summary

This document provides a status control schedule for shop drawings for a construction project at PT. INOAC POLYTECHNO INDONESIA (IPI) Karawang PU Factory. It lists over 70 drawing numbers categorized as Construction Method, Structure, Architecture General, and Architecture Room Detail drawings. It provides the drawing title, original submittal date, actual submittal date, and dates for shop drawing reviews and approvals between IPI and the contractor SMCC UTAMA INDONESIA.

Uploaded by

ANJellHwan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PT.

INOAC POLYTECHNO INDONESIA (IPI)


KARAWANG PU FACTORY
STATUS CONTROL OF SHOP DRAWING SCHEDULE

DRAWING NO.
CONSTRUCTION METHODE
INC-CM-001
PILING WORKS METHOD
INC-CM-002
PILING WORKS METHOD
INC-CM-003
PILING WORKS METHOD

BUILDING AREA
TITLE

STRUCTURE DRAWING
INC-S-001
PILING PLAN
INC-S-002
PILING PLAN
INC-S-003
PILING PLAN
INC-S-004
FOUNDATION PLAN
INC-S-005
FOUNDATION PLAN
INC-S-006
FOUNDATION PLAN
INC-S-007
FOUNDATION DETAIL & CONC.MEMBERS SCHEDULE
INC-S-008
FOUNDATION DETAIL & CONC.MEMBERS SCHEDULE
INC-S-009
FOUNDATION DETAIL & CONC.MEMBERS SCHEDULE
INC-S-010
FOUNDATION DETAIL & CONC.MEMBERS SCHEDULE
INC-S-011
FOUNDATION PLAN DETAIL PLANT A&C BUILDING
INC-S-012
FOUNDATION PLAN DETAIL PLANT A&C BUILDING
INC-S-013
FOUNDATION PLAN DETAIL PLANT A&C BUILDING
INC-S-014
FOUNDATION PLAN DETAIL PLANT A&C BUILDING
INC-S-015
FOUNDATION PLAN DETAIL PLANT A&C BUILDING
INC-S-016
FOUNDATION PLAN DETAIL PLANT A&C BUILDING
INC-S-017
FOUNDATION PLAN DETAIL PLANT A&C BUILDING
INC-S-018
FOUNDATION PLAN DETAIL PLANT A&C BUILDING
INC-S-019
FOUNDATION PLAN DETAIL PLANT A&C BUILDING
INC-S-020
FOUNDATION PLAN DETAIL PLANT A&C BUILDING
INC-S-021
FOUNDATION PLAN DETAIL OFFICE BUILDING
INC-S-022
FOUNDATION PLAN DETAIL OFFICE BUILDING
INC-S-023
FOUNDATION PLAN DETAIL MISCELLANEOUS BUILDING
INC-S-024
FOUNDATION PLAN DETAIL PLANT B BUILDING
INC-S-025
FOUNDATION PLAN DETAIL PLANT B BUILDING
INC-S-026
FOUNDATION PLAN DETAIL PLANT B BUILDING
INC-S-027
FOUNDATION PLAN DETAIL PLANT B BUILDING
INC-S-028
FOUNDATION PLAN DETAIL PLANT B BUILDING
INC-S-029
FOUNDATION PLAN DETAIL PLANT B BUILDING
INC-S-030
FOUNDATION PLAN DETAIL PLANT B BUILDING
INC-S-031
FOUNDATION PLAN DETAIL PLANT D BUILDING
INC-S-032
FOUNDATION PLAN DETAIL PLANT D BUILDING
INC-S-033
FOUNDATION PLAN DETAIL PLANT D BUILDING
INC-S-034
FOUNDATION PLAN DETAIL PLANT D BUILDING
INC-S-035
PLAN SLAB ON GRADE PLANT A,C & OFFICE BUILDING (1st Floor)
INC-S-036
PLAN SLAB PLANT-A1 AND OFFICE BUILDING 2nd FLOOR
INC-S-037
PLAN SLAB ON GRADE PLANT B&D BUILDING
INC-S-038
PLAN COLUMN AND PEDESTAL PLANT A,C & OFFICE BUILDING 1st FLOOR
INC-S-039
PLAN COLUMN AND BEAM PLANT-A1 AND OFFICE BUILDING 2nd FLOOR
INC-S-040
PLAN COLUMN AND PEDESTAL PLANT B&D BUILDING
INC-S-041
PLAN ROOF BEAM PLANT A,C & OFFICE BUILDING
INC-S-042
PLAN ROOF BEAM PLANT B&D BUILDING
INC-S-043
COLUMN DETAIL AND BEAM MEMBER SCHEDULE PLANT A,C & OFFICE BUILDING
INC-S-044
COLUMN DETAIL AND BEAM MEMBER SCHEDULE PLANT B&D BUILDING
INC-S-045
PLAN COLUMN AND ROOF BEAM DETAIL PLANT A&C BUILDING
INC-S-046
PLAN COLUMN AND ROOF BEAM DETAIL OFFICE BUILDING
INC-S-047
PLAN COLUMN AND ROOF BEAM DETAIL MISCELLANEOUS BUILDING
INC-S-048
PLAN COLUMN AND ROOF BEAM DETAIL PLANT B BUILDING
INC-S-049
PLAN COLUMN AND ROOF BEAM DETAIL PLANT D BUILDING
INC-S-050
PLAN EXTERNAL ROAD
INC-S-051
PLAN EXTERNAL DRAINAGE
INC-S-052
PLAN FENCE
INC-S-053
DETAIL FENCE
INC-S-054
PLAN AND FRAME OPENING WALL PLANT A,C & OFFICE BUILDING
INC-S-055
PLAN AND FRAME OPENING WALL PLANT B&D BUILDING
INC-S-056
ELEVATION AND DETAIL EMBEDED PLANT A,C & OFFICE BUILDING
INC-S-057
ELEVATION AND DETAIL EMBEDED PLANT B&D BUILDING
INC-S-058
PLAN AND DETAIL ANCHOR PLANT A,C & OFFICE BUILDING
INC-S-059
PLAN AND DETAIL ANCHOR PLANT B&D BUILDING
INC-S-060
PLAN AND SECTION UNDERGROUND WATER TANK
INC-S-061
PLAN AND SECTION PUMP ROOM
INC-S-062
PLAN AND SECTION STAIR
INC-S-063
PLAN AND SECTION GATE ENTRANCE 1
INC-S-064
PLAN AND SECTION GATE ENTRANCE 2
INC-S-065
PLAN AND SECTION GUARD HOUSE
INC-S-066
PLAN AND SECTION FLAG POLE
INC-S-067
DETAIL TYPICAL DOWN PIPE

PT. SMCC UTAMA INDONESIA


DATE
: 26/01/2015
REV
:0
SUBMIT
PLAN

ACTUAL

ORIGINAL

16-Jan-15
16-Jan-15
16-Jan-15

17-Jan-15
17-Jan-15
17-Jan-15

21-Jan-15
21-Jan-15
21-Jan-15

17-Jan-15
17-Jan-15
17-Jan-15
17-Jan-15
17-Jan-15
17-Jan-15
17-Jan-15
17-Jan-15
17-Jan-15
17-Jan-15
19-Jan-15
19-Jan-15
19-Jan-15
19-Jan-15
19-Jan-15
20-Jan-15
20-Jan-15
20-Jan-15
20-Jan-15
20-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
23-Jan-15
23-Jan-15
23-Jan-15
23-Jan-15
23-Jan-15
26-Jan-15
26-Jan-15
26-Jan-15
26-Jan-15
31-Jan-15
31-Jan-15
31-Jan-15
4-Feb-15
4-Feb-15
4-Feb-15
4-Feb-15
4-Feb-15
7-Feb-15
7-Feb-15
7-Feb-15
7-Feb-15
7-Feb-15
7-Feb-15
7-Feb-15
11-Feb-15
11-Feb-15
14-Feb-15
14-Feb-15
18-Feb-15
18-Feb-15
21-Feb-15
21-Feb-15
25-Feb-15
25-Feb-15
28-Feb-15
4-Feb-15
7-Mar-15
11-Mar-15
14-Mar-15
17-Mar-15
19-Mar-15
21-Mar-15

18-Jan-15
18-Jan-15
18-Jan-15
18-Jan-15
18-Jan-15
18-Jan-15
18-Jan-15
18-Jan-15
18-Jan-15
18-Jan-15
20-Jan-15
20-Jan-15
20-Jan-15
20-Jan-15
20-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
23-Jan-15
23-Jan-15
23-Jan-15
23-Jan-15
23-Jan-15
24-Jan-15
24-Jan-15
24-Jan-15
24-Jan-15
24-Jan-15
26-Jan-15
26-Jan-15
26-Jan-15
26-Jan-15

21-Jan-15
21-Jan-15
21-Jan-15
21-Jan-15
21-Jan-15
21-Jan-15
21-Jan-15
21-Jan-15
21-Jan-15
21-Jan-15

SHOP DRAWING (SMCC TO IPI)


REV.-1
REV.-2

REV.-3

1st

RETURN & COMENTS (IPI TO SMCC)


2nd
3rd

APPROVAL

FOR CONSTRUCTION

INC-S-068
INC-S-069
INC-S-070
INC-S-071

PLAN
PLAN
PLAN
PLAN

AND
AND
AND
AND

SECTION
SECTION
SECTION
SECTION

CANOPY
LADDER
CAR PARKING
MOTORCYCLE PARKING

ARCHITECTURE DRAWING GENERAL


INC-A-001
FINISHING SCHEDULE
INC-A-002
SITE PLAN
INC-A-003
PLAN FINISHING FLOOR PLANT A & C BUILDING
INC-A-004
PLAN FINISHING FLOOR OFFICE BUILDING 1st FLOOR
INC-A-005
PLAN FINISHING FLOOR OFFICE BUILDING 2nd FLOOR
INC-A-006
PLAN FINISHING FLOOR MISCELLANEOUS BUILDING
INC-A-007
PLAN FINISHING FLOOR PLANT B&D BUILDING
INC-A-008
PLAN FINISHING WALL PLANT A & C BUILDING
INC-A-009
PLAN FINISHING WALL OFFICE BUILDING 1st FLOOR
INC-A-010
PLAN FINISHING WALL OFFICE BUILDING 2nd FLOOR
INC-A-011
PLAN FINISHING WALL MISCELLANEOUS BUILDING
INC-A-012
PLAN FINISHING WALL PLANT B&D BUILDING
INC-A-013
PLAN CEILING PLANT A & C BUILDING
INC-A-014
PLAN FINISHING CEILING OFFICE BUILDING 1st FLOOR
INC-A-015
PLAN FINISHING CEILING OFFICE BUILDING 2nd FLOOR
INC-A-016
PLAN FINISHING CEILING MISCELLANEOUS BUILDING
INC-A-017
PLAN ROOF
INC-A-018
ELEVATION FACTORY
INC-A-019
SECTION FACTORY
INC-A-020
ELEVATION CANOPY
INC-A-021
ENTRANCE GATE DETAIL
INC-A-022
PLAN DOOR AND WINDOW GUARD HOUSE
INC-A-023
PLAN DOOR AND WINDOW FACTORY
INC-A-024
PLAN DOOR AND WINDOW OFFICE
INC-A-025
FACTORY JOINERY SCHEDULE
INC-A-026
OFFICE JOINERY SCHEDULE
INC-A-027
PLAN KEY
INC-A-028
NOTED SERIAL NUMBER OF KEY
INC-A-029
PLAN AND SECTION STAIR
INC-A-030
STEEL DOOR, ELEVATION, SECTIOAN AND DETAIL
INC-A-031
ALUMUNIUM DOOR, ELEVATION, SECTIOAN AND DETAIL
INC-A-032
WOODEN DOOR ELEVATION, SECTIOAN AND DETAIL
INC-A-033
STEEL ROLLING SHUTTER DOOR ELEVATION, SECTIOAN AND DETAIL
INC-A-034
ALUMUNIUM WINDOW, ELEVATION, SECTIOAN AND DETAIL
INC-A-035
PLAN GARDEN AND TREE
ARCHITECTURE DRAWING ROOM DETAIL 1st FLOOR
INC-A-101
PLANT A-1 OFFICE
INC-A-102
TRANSFORMER & GENSET
INC-A-103
FACTORY TOILET 1
INC-A-104
PUMP ROOM
INC-A-105
WALK WAY
INC-A-106
HALL / LOBBY (RECEPTIONIST)
INC-A-107
MEETING CORNER
INC-A-108
MEETING ROOM
INC-A-109
TEST ROOM (1)
INC-A-110
TEST ROOM (2)
INC-A-111
OFFICE TOILET FEMALE
INC-A-112
OFFICE TOILET MALE
INC-A-113
STAIRS
INC-A-114
CANTEEN
INC-A-115
KITCHEN & DISH WASH
INC-A-116
FACTORY TOILET 2
INC-A-117
ABLUTION
ARCHITECTURE DRAWING ROOM DETAIL 2nd FLOOR
INC-A-200
PLANT A-1 OFFICE (2F)
INC-A-201
OFFICE
INC-A-202
MEETING ROOM
INC-A-203
SERVER ROOM
INC-A-204
PANTRY ROOM
INC-A-205
OFFICE TOILET FEMALE
INC-A-206
OFFICE TOILET MALE
INC-A-207
PRAYING ROOM

24-Mar-15
26-Mar-15
28-Mar-15
31-Mar-15

1-Apr-15
1-Apr-15
1-Apr-15
2-Apr-15
2-Apr-15
2-Apr-15
2-Apr-15
3-Apr-15
3-Apr-15
3-Apr-15
3-Apr-15
3-Apr-15
4-Apr-15
4-Apr-15
4-Apr-15
4-Apr-15
4-Apr-15
6-Apr-15
6-Apr-15
7-Apr-15
7-Apr-15
8-Apr-15
8-Apr-15
9-Apr-15
9-Apr-15
10-Apr-15
10-Apr-15
11-Apr-15
11-Apr-15
13-Apr-15
13-Apr-15
14-Apr-15
14-Apr-15
15-Apr-15
15-Apr-15

16-Apr-15
17-Apr-15
17-Apr-15
18-Apr-15
18-Apr-15
20-Apr-15
20-Apr-15
21-Apr-15
21-Apr-15
22-Apr-15
22-Apr-15
23-Apr-15
23-Apr-15
24-Apr-15
24-Apr-15
25-Apr-15
25-Apr-15
27-Apr-15
27-Apr-15
28-Apr-15
28-Apr-15
29-Apr-15
29-Apr-15
30-Apr-15
30-Apr-15