0% found this document useful (0 votes)
43 views5 pages

Boq Parrsa

1) The document is a bill of quantity for repair work on various government buildings in Upper Dir district. It provides details of the proposed construction and repair works in 5 different buildings, including quantities, units, rates and amounts. 2) The buildings that require repair works are the TMA Office Wari, Tehsildar Office Barawal, Tehsildar Office Kalkot, Tehsildar Office Barawal and EDO Education Office Upper Dir. 3) The bill of quantity provides item-wise details of the proposed construction works like PCC, brick masonry, woodwork, painting etc. along with their quantities, units, rates and total amounts. The grand total cost

Uploaded by

Naveed Shaheen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views5 pages

Boq Parrsa

1) The document is a bill of quantity for repair work on various government buildings in Upper Dir district. It provides details of the proposed construction and repair works in 5 different buildings, including quantities, units, rates and amounts. 2) The buildings that require repair works are the TMA Office Wari, Tehsildar Office Barawal, Tehsildar Office Kalkot, Tehsildar Office Barawal and EDO Education Office Upper Dir. 3) The bill of quantity provides item-wise details of the proposed construction works like PCC, brick masonry, woodwork, painting etc. along with their quantities, units, rates and total amounts. The grand total cost

Uploaded by

Naveed Shaheen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

BILL OF QUANTITY.

NAME OF WORK:-

REPAIR OF GOVT: BUILDINGS IN DISTRICT UPPER DIR

SUB HEAD:-

(1)T.M.A. Office Wari (2)Tehsildar Office Barawal


(3)Tehsildar Office Kalkot (4) Tehsildar Office Barawal
(5)EDO Education Office Upper Dir.

S
#
A
0
1
E
0
02
1
0
03
2
0
04
3
0
05
4
0
5
0
6
0
7
0
8B
0
1
0
2

C
0
1
0
2
0
3
0
4

D
0
1
0
2
0
3
0
4
0
5

Description

Qty:

Unit

Rate

Amount

T.M.A. OFFICE WARI


P:C:C (1:3:6) plain

3.16

M3

3477/-

Rs.10989/-

TEHSILDAR OFFICE BARAWAL


B:B Masonry (1:6)

10.19

M3

3721/-

Rs.37926/-

Wooden Joinery

2.32

M2

4036/-

Rs.15335/-

White Washing

280

M2

20

Rs.5600/-

Painting 3-Coats

179

M2

60

Rs.10740/-

Total:Add: Cost Factor


Add: 2-0 % Above
Total:Add: 0.50 % Contingency
SUB TOTAL:- (A)

Rs.80590/Rs.88649/RS.15730/RS.106379/Rs.532/RS.106911/-

TOTAL:66.79
M3
4156/Add: Cost Factor 1.1
Add: 20 27
% PremiumNos 867/W/O light point , Call bell, Celling Fan
TOTAL:Add: 0.50 % Contingency
TOTAL:G: TOTALAdd:
(A+B+C+D)
Cost Factor
Add: 20 % Premium
SUB TOTAL (B)
TEHSILDAR OFFICE KALKOT
P:C:C: (1:3:6) Plain
54.06
M3
4156/-

RS.
Rs.277575/RS.
RS.
Rs.23409/RS.
RS.
RS.300984/RS.
RS.331082/Rs.66216/RS.397298/-

Water Supply

Rs.20000/-

TEHSILDAR OFFICE BARAWAL


P/L P:C:C: (1:2:4) Plain

Rs.224675/-

Total:-

Rs.244675/-

Add: Cost Factor

RS.269142/-

ADD: 20 % Premium
TOTAL:Add: 0.50 % Contingency
SUB TOTAL:- ( C)

RS.53828/RS.322970/RS.1615/RS.324585/-

EDO EDUCATION OFFICE DIR


Excavation as in foundation

107.36

M3

105/-

RS.11273/-

P:C:C: (1:4:8) as in foundation

26.86

M3

2578/-

RS 69245/-

R:R Stone Masonry (1:6) CSM

155.04

M3

3185/-

RS 493810/-

P:C:C: (1:3:6) as coping

8.94

M3

3477/-

RS 29520/-

B:B Masonry (1:6) as specified

29.53

M3

3721/-

RS 109881/-

Total:Add: Cost Factor 1.1

Rs.713739/Rs.785113/-

SUB DIVISIONAL OFFICER


C&W SUB DIVISION PF - 91
UPPER DIR
Add:___________% Above/Below/AT PAR
On CSR 2009.

CONTRACTOR

BILL OF QUANTITY.
NAME OF WORK:-

REPAIR OF GOVT: BUILDINGS IN DISTRICT UPPER DIR

SUB HEAD:-

(1)T.M.A. Office Dir (2)EDO Agriculture


(3)District Officer Live Stock

1
3
1
4
1
S5
#1
A
6
1
07
11
08
21
09
3
0
4

P:C:C: (1:2:4) 2" thick

3.25

M2

338/-

Rs.1098/-

CGI Sheet

6.59

M2

825/-

Rs.5436/-

Oil Painting 3-Coats all Building


Description

328.32
Qty:

M2
Unit

184/Rate

Rs.60502/Amount

W:C
DISTRICT OFFICE LIVE STOCK

M2

2731/-

Rs.2731/-

Floor Trip
Excavation As in foundation

1
31.71

M2
M3

273/105/-

Rs.273/Rs.3380/-

White Washing ,distempering


P:C:C: (1:4:8) as in foundation

400
5.23

M2
M3

42/2578/-

Rs.16800/Rs.13483/-

P:C:C: (1:3:6) plaster


R:R Stone Masonry (1:6)

30.62
83.67

M2
M3

3477/3185/-

Rs.106465/Rs.266511/-

P:C:C: (1:3:6) as in coping

1.98

M3

Total:3477/-

Rs.182159/Rs.6891/-

VIP Bath Room


TOTAL:-

Rs.161129/RS.290215/-

Civil Work
Add: Cost Factor

Rs.182159/RS.63847/-

Add: 20 % Premium

Total:-

Rs.343288/Rs.383085/-

Add: Cost Factor


Add: 0.50 % Contingency

Rs.377617/Rs.1915/-

Add: 20 % Premium
SUB TOTAL (B)

Rs.75523/
RS.385000/-

Total:-

Rs.453141/-

EDO AGRICULTURE UPPER DIR

0
1
0
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
1
0
11
1
2

Excavation as in foundation

Add: 0.50 % Contingency


4.58
M3
105/-

P:C:C: (1:4:8) as in foundation

1.45

R:R Stone Masonry (1:6) CSM

8.01

Feb: of Mild Steel

0.077

Ton

82234/-

Rs.6332/-

R:C:C: (1:2:4) as beam

1.07

M3

5261/-

Rs.5629/-

Wooden Trusses

0.25

M2

112020/-

Rs.28005/-

B:B Work Masonry (1:6) CSM

4.27

M3

3721/-

Rs.15889/-

Wooden Celling

6.41

M3

41667/-

Rs.10600/-

E/Board " thick

2.41

M2

2229/-

Rs.5386/-

P:C: Plaster (1:4) CSM

22.11

M2

1231/-

Rs.2721/-

P:C Pointing (1:3) CSM


Steel Door

21.65
2

M2
M2

128/2890/-

Rs.2771/Rs.5780/-

SUB TOTAL:- (C )
M3
2578/G: TOTAL:- (A+B))
M3
3185/-

Rs.2266/Rs.480/RS.455407/Rs.3738/RS.2783678/Rs.25511/-

SUB DIVISIONAL OFFICER


C&W SUB DIVISION PF - 91
UPPER DIR
Add:___________% Above/Below/AT PAR
On CSR 2009.

CONTRACTOR