Net Meter Flowchart

The flow chart outlines the process for roof top net metering with a solar panel installation in three key steps: 1) Downloading and submitting an application form along with payment to register for technical feasibility assessment. 2) Upon approval, the consumer selects an empaneled supplier to install a solar panel and submits payment to receive an order. 3) After installation, the consumer submits a work completion report to replace the old meter with a net meter and close out the work order for billing.

Uploaded by

Raju Ch
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
200 views

Net Meter Flowchart

The flow chart outlines the process for roof top net metering with a solar panel installation in three key steps: 1) Downloading and submitting an application form along with payment to register for technical feasibility assessment. 2) Upon approval, the consumer selects an empaneled supplier to install a solar panel and submits payment to receive an order. 3) After installation, the consumer submits a work completion report to replace the old meter with a net meter and close out the work order for billing.

Uploaded by

Raju Ch
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Flow chart for Roof top NET METERING

Start

Download application form from www.tssouthernpower/Solar


Rooftop Netmetring/Application Form

Obtain DD of Rs. 1000/- from any Scheduled bank in favor of TSSPDCL

Fill the application & submit at concern CSC/ICSC center along with
DD, 2 Nos self-addressed stamped envelope and latest electricity bill

Obtain the Acknowledgment from CSC operator with unique


registration number for further reference

Application automatically forward to ADE/op login for technical


feasibility

Technical feasibility report should be approved by ADE/Op with in


10 days from the date of registration after site inspection

Data will flow to SAP for preparation of


estimation

SMS Alert and email will be


received by consumer about
Technical feasibility

ADE prepares estimate & approve in SAP


with in 5 days
Consumer can approach
empaneled suppliers for
installation of solar panel
available in
www.tssouthernpower.com/
www.nedcap.gov.in website

Amount to be paid by consumer will sent


to CSC from SAP

Consumer will get SMS alert about


Amount to be paid

Consumer should Obtain DD from


scheduled bank and submit at CSC/ICSC
Payments will sent to SAP after entry of
DD details in CSC
Order will be released after receipt of
payment from CSC

After completion of site work,


consumer should submit work
completion report and
agreement (Available at
TSSPDCL website) at CSC/ICSC
center and obtain
acknowledgment

For any queries and grievances


mail us at
[email protected]
or Call us @8985968340

ADE/Op should draw the meter after


release of order with in 5 days
SMS Alert will sent to consumer about
meter drawl
ADE Should inspect the site and replace the
old meter with NETMETER and update the
test report/ Meter change report in CSC
login with in 5 days

Data will be sent to EBS for billing and SAP


for closing of workorder

End

Reconciliation with ERO by


AE/ICSC or ADE/Op before
end of Month