The document is a request for information from Trans Gulf Electro-Mechanical L.L.C., the MEP sub-contractor, to the design consortium regarding the Hyatt Regency Colombo hotel project. It contains one query about the fire rated walls in the back of house areas of certain floors. The design consortium is asked to refer to a specific drawing for the answer. The document provides project details and requests a signature from the project manager in reply.

Uploaded by

Thushan Madu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views

Sample RFI

The document is a request for information from Trans Gulf Electro-Mechanical L.L.C., the MEP sub-contractor, to the design consortium regarding the Hyatt Regency Colombo hotel project. It contains one query about the fire rated walls in the back of house areas of certain floors. The design consortium is asked to refer to a specific drawing for the answer. The document provides project details and requests a signature from the project manager in reply.

Uploaded by

Thushan Madu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Trans Gulf Electro-Mechanical L.L.

Doc No: TG-504-PF-05


Rev : 00
Date : 09.10.2013

REQUEST FOR INFORMATION [RFI]

1 of 1

Project Name: Hyatt Regency Colombo [HRC] Hotel at No.116, Galle Road, Colombo 03
Main Contractor: M/s. Maga Engineering (Pvt) Ltd.
MEP Sub-Contractor: M/s. Trans Gulf Electro Mechanical LLC.
Request for Information # RFI/MEP/257

Date: 04/10/2014

Issued to : Design Consortium (Pvt) Ltd.


Attachments:

Yes

No

WE REQUEST FOR INFORMATION ABOUT THE FOLLOWING:


Architectural

Civil / Structural

No.

Query

1.

Please Advise the fire rated walls is BOH Area of


6th 10th & 16th 31st floors.

Services

Other
Answer

Refer to IFC drawing reference


1208/HRC/CONS/ST1/AR0631/BOH-R1 issued to TG on
10/09/14

Encl:

Project Manager:
(MEP Sub Contractor TGEM)

Replied by Sanjeewa Alwis(SE(MEP))

Signature:

Signature:

NOTE: REQUEST FOR CLARIFICATION OF DISCREPENCY PURSUANT TO CLAUSE 5.2 OF THE CONDITIONS. CONTRACTOR SHALL
ADVISE FOR AN EXTRA COST RESULTING FROM ANSWERS TO THE CLARIFICATIONS RAISED,IF ANY, PRIOR TO PROCEEDING WITH
THE SAME.