CSWA Practice 2013
CSWA Practice 2013
-This test is made up of a series of problems broken down into sets of questions. Each problem
set of questions comes with a description that outlines the problems to be solved for that set.
-This exam contains 14 questions
-You should be able to complete all 14 questions within 180 minutes
-Consult answer key after completion of this section
a. Select the view then set the scale on the property manager
b. Open the Sheet Properties
c. Right click the view and select change master scale
d. Open the Drawing Options
R8 x 2
R35
R14
R5 x 4
A
20
15
135
A
5
B ( Radius)
C 40
20
64
SECTION A-A
20
R35
R10 x 2
R14
R8 x 5
10
25
B
20
5
45
135
15
A
A
20
3
B (Radius)
20
40
C
20
64
SECTION B-B
20
A
15
R5 x 4
SECTION A-A
10 x 5
45
R2 x 4
15
7
7
C (Radius)
7
25
SECTION H-H
R2.50 x 15
10 x 4
20
R5 x 15
E
85
What is the center of mass of the assembly with respect to the new coordinate system?
a. X= -22.55, Y= 120.12, Z= 155.34
b. X= -25.85, Y= 113.54, Z= 173.53
c. X= 22.55, Y= -120.12, Z= 155.34
d. X= -30.53, Y= 102.11, Z= 166.38
What is the center of mass of the assembly with respect to the new coordinate system?
X = _____
Y = _____
Z = _____
What is the value of the length X between the bottom edge of the A-Arm and the bottom face of
the mount (mm)?
a. 48.36
b. 55.22
c. 41.35
d. 56.35
C/2
C/2
E
C
10
R2 x 2
20
5x2
40
10
45
D/2
45
35
17.50
18
17.50
24
45
2
18
45
10
10
C
40
40
C
C
- Question 13: Make the following changes to the part from Question 12.
- Note: Part is symmetrical across the horizontal line passing through the
center bore
- Note: Modified dimensions are indicated with inspection bubbles, new
dimensions are not.
- Read following questions before modeling.
C
C/2
C/2
E
10
C
C
C
R3 x 12
30
3
3
3
R5 x 2
5x2
17.50
D
3
45
18
35
15
3
3
15
14
24
17.50
45
20
18
A
12.50
12.50
D/2
- Question 14: Make the following changes to the part from Question 13.
- Note: Part is symmetrical across the horizontal and vertical lines passing
through the center bore
- Note: Modified dimensions are indicated with inspection bubbles, new
dimensions are not.
- Read following questions before modeling.
10
10
C/2
C/2
C
C
12.50
30
12.50
5
R2 x 12
5
8x4
5
2
8.75
5x2 B
17.50
35
17.50
R5 x 4
15
5
5
15
10
45
18
18
D/2
20
30