Rencana Anggaran Biaya
Rencana Anggaran Biaya
NO
:
:
:
:
KEGIATAN
PEKERJAAN
LOKASI
TA
URAIAN PEKERJAAN
A.
PEKERJAAN PENDAHULUAN
1
2
3
Pengukuran
Bongkaran dinding + Atap lama
BeackUp Data dan Asbuildrawing
B.
1
2
3
4
5
6
7
8
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
D.
1
2
3
4
5
6
7
PEKERJAAN DINDING
Pas. Dinding Bata 1/2 bata 1 : 5
Plasteran Dinding 1 : 5
Acian Dinding / Tembok
Pek.Dinding Partisi rangka Aluminium
Pas. Kaca Mati
Pas. Dinding Kalsiboard
Pas. Wallpaper
E
1
2
3
4
5
6
7
8
9
10
11
12
VOL.
SAT.
HARGA SATUAN
JUMLAH HARGA
1.00
-
Ls
Ls
2
M
Rp
Rp
Rp
1,250,000.00
-
Rp
Rp
Rp
Rp
1,250,000.00
1,250,000.00
23.04
11.52
0.17
5.47
13.57
3.00
26.00
M
3
M
3
M
M3
M3
M3
M3
M3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
45,550.00
45,550.00
11,749.00
216,920.00
441,787.50
733,073.00
210,500.40
216,920.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,049,472.00
135,348.48
37,093.32
2,417,461.20
9,944,868.32
631,501.20
5,639,920.00
19,855,664.52
1.23
1.26
0.24
0.21
1.72
0.42
1.05
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
2,433,214.42
4,255,726.50
3,829,434.90
4,760,171.55
4,760,171.55
4,933,508.68
4,986,550.23
4,038,171.82
5,721,509.73
3,906,017.66
3,906,017.66
3,915,308.67
4,857,523.42
2,708,763.05
2,708,763.05
Sub Jumlah
Sub Jumlah
Sub Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
5,239,650.47
6,216,220.93
1,196,772.05
822,214.82
8,361,012.19
1,137,680.48
2,844,201.20
Rp
25,817,752.14
143.56
287.11
287.11
-
M2
M2
M2
M2
M2
M2
M2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
101,874.52
45,398.28
25,828.00
58,422.28
175,034.75
42,891.75
69,107.50
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
14,624,596.72
13,034,299.02
7,415,477.08
35,074,372.82
0.20
1.24
15.40
6.50
21.96
7.00
10.00
26.00
4.00
13.00
26.00
M3
M3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
14,673,587.50
14,673,587.50
695,475.00
58,422.28
375,760.00
175,034.75
234,327.50
30,252.75
25,668.50
125,000.00
19,989.75
24,752.75
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
2,905,810.53
18,241,433.62
10,710,315.00
2,442,440.00
3,843,763.11
1,640,292.50
302,527.50
667,381.00
500,000.00
259,866.75
643,571.50
42,157,401.51
Sub Jumlah
M2
M2
M2
Bh
Psg
Psg
Bh
Psg
Psg
Sub Jumlah
NO
URAIAN PEKERJAAN
F
1
2
3
4
5
PEKERJAAN LANTAI
1
2
3
4
5
VOL.
SAT.
223.43
223.43
35.68
M
M2
M'
47.80
M'
HARGA SATUAN
Rp
Rp
Rp
Rp
Rp
207,492.45
77,627.00
41,390.25
62,452.50
Sub Jumlah
6.50
125.50
4.28
10.20
15.36
M
M2
2
M
2
M
M2
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
46,359,602.37
17,344,037.59
1,476,804.12
2,985,229.50
Rp
68,165,673.58
Rp
Rp
Rp
197,200.00
193,919.66
176,290.60
Rp
Rp
Rp
1,281,800.00
24,336,917.33
753,642.32
Rp
193,919.66
Rp
1,977,980.53
Rp
193,919.66
Rp
2,979,090.78
Rp
31,329,430.95
90,091.83
42,891.75
16,940.00
Rp
Rp
Rp
Rp
12,861,510.13
6,123,226.23
3,452,372.00
22,437,108.36
Sub Jumlah
1
2
3
PEKERJAAN PLAFOND
Pas. Rangka Plafond Hollow 40x40x2
mm
Pas. Plafond Kalsiboard 3 mm
Pas. List Plafond
142.76
142.76
203.80
I
1
2
3
4
5
6
7
32.00
9.00
10.00
5.00
3.00
4.00
1.00
titik
bh
bh
bh
bh
bh
bh
98,000.00
83,000.00
26,550.00
65,000.00
24,750.00
25,000.00
150,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
3,136,000.00
747,000.00
265,500.00
325,000.00
74,250.00
100,000.00
150,000.00
4,797,750.00
24.00
M
M
M
M
Bh
Bh
Bh
Bh
17,942.38
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
430,617.00
1,085,807.25
652,921.50
229,075.00
40,000.00
648,285.00
1,642,245.00
4,728,950.75
Rp
Rp
Rp
2,040,000.00
1,250,000.00
1,000,000.00
Rp
4,290,000.00
Rp
Rp
Rp
Rp
Rp
6,320,259.79
1,893,151.54
2,983,731.11
1,628,403.92
12,825,546.36
1
2
3
4
5
6
7
8
K
1
2
3
PEKERJAAN ORNAMEN
Pas. Huruf
Pek. Ornamen Kolom +
Pek. Profil Listplank Beton
set
18.00
7.50
5.00
2.00
1.00
3.00
1.00
1.00
1.00
M2
M2
Rp
Rp
Rp
Sub Jumlah
Sub Jumlah
Sub Jumlah
Ls
Ls
Ls
Rp
Rp
Rp
60,322.63
87,056.20
45,815.00
20,000.00
648,285.00
547,415.00
2,040,000.00
1,250,000.00
1,000,000.00
Sub Jumlah
L
1
2
3
4
PEKERJAAN PENGECATAN
Pek. Cat Tembok Baru
Pek. Cat Tembok Lama
Cat Plafond
Cat Kayu
302.40
124.20
142.76
48.87
M2
M2
M2
M2
Rp
Rp
Rp
Rp
Sub Jumlah
20,900.33
15,242.77
20,900.33
33,324.00