Coldformed Truss
Coldformed Truss
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
CONTRACT #
W5J9LE-12-C -0019
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
General Assumption:
1.1 Scope of work
This design calculation covers the Analysis & Design of the COLD FORMED TRUSS .
Note: Structural System is Intermediate Steel Moment Frame, as per ASCE 7-05, Table 12-2.1 with R=4.5.
1.6 Loading:
Seismic Load:
S1= 1.28
Ss=0.51
Site class = D
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Wind Load:
Basic wind Velocity is 135 Km/hr (85 mph) in accordance Metrological Design Data ASCE 705,
Exposure Category (C).
DEAD LOADS:
Please see ETABS & SAFE Steel Structure Calculation Reports for loadings. The Dead Load reactions
given in Steel Structure Calculation Reports will be used for foundation designs by adapting them to
Combinations of LRFD (IBC2006 Section1605).
LIVE LOADS:
Please see ETABS & SAFE Steel Structure Calculation Reports for loadings. The Live Load reactions
given in Steel Structure Calculation Reports will be used for foundation designs by adapting them to
Combinations of LRFD (IBC2006 Section1605).
SEISMIC LOADS
Please see ETBAS & SAFE Steel Structure Calculation Reports for loadings. The Seismic Load
reactions given in Steel Structure Calculation Reports will be used for foundation designs by
adapting them to Combinations of (ASCE 7-05).
WIND LOADS
Please see ETABS & SAFE Steel Structure Calculation Reports for loadings. The Wind Load reactions
given in Steel Structure Calculation Reports will be used for foundation designs by adapting them to
Combinations of (ASCE 05-7).
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
3.0 Modeling
The SUNSHADE STEEL STRUCTURE is modeled as three Dimensional space using SAP.
3.1 Design Philosophy
Live Loads:
Live Load = 100 Kg/m2
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
CONTRACT #
W5J9LE-12-C -0019
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
BUILDING ANALYSIS:
The SUNSHADE STEEL STRUCTURE analyzed based on lateral and vertical loads. The steel frames
(Columns & Beams) are designed by ETABS (Extended Three Dimensional Analysis of the Building System),
and accordingly all reactions are exported in to SAFE(Slab Analysis by the Finite Element Method), And
foundation has been designed, for more information please refer to enclosed software output data.
These programs are the CSI (Computer and Structural Inc) products.
The seismic and wind loads are computed by program. The seismic load is calculated based on IBC
2006 and wind load is calculated based on ASCE 7-05.
Program automatically compares seismic and wind loads and design the SUNSHADE STEEL
STRUCTURE for critical condition. Concrete elements are designed based on ACI318-05 (American
Concrete Institute) code. The MAT FOOTING is designed based on various types of combinations
according to proposed code. The final design results are reported based on critical combination.
Here the SUNSHADE STEEL STRUCTURE has been designed as bellow.
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
tw
mm
1.590
Radius
mm
5.000
ColdFormed
ColdFormed
ColdFormed
28.000
38.000
39.000
1.270
1.270
1.270
0.000
0.000
0.000
AS2
mm2
121.21
AS3
mm2
78.93
25628.62
29155.97
31325.17
111.07
113.61
113.61
64.67
93.29
95.83
R22
mm
14.341
ConcCol
5687.91
5934.60
6048.24
10.901
11.799
12.156
No
No
No
Cold Formed C
Cold Formed C
Cold Formed C
90.000
92.000
92.000
15.000
0.000
0.000
215.68
209.44
211.98
115.96
112.60
113.97
255956.07
272991.81
278219.09
1368.92
1008.90
1060.20
5687.91
5934.60
6048.24
1368.92
1008.90
1060.20
34.449
36.103
36.228
No
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
ConcBeam
HAT FURRING
CHANNEL
STUD
STUD RAFTER
TRACK
No
No
No
No
Red
Yellow
Green
331.50
135.00
127.78
0.0338
0.0138
0.0130
No
No
No
AMod
A2Mod
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
A3Mod
WMod
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
GUID
SectionType
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
DesignSect
MatProp
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
Frame
SectionType
18
19
28
30
31
32
33
54
55
56
57
58
60
61
62
63
64
65
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
DesignSect
MatProp
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
Frame
SectionType
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
240
241
242
243
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
DesignSect
MatProp
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
Frame
SectionType
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD
STUD RAFTER
STUD
STUD
STUD
DesignSect
MatProp
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD
STUD RAFTER
STUD
STUD
STUD
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
Frame
SectionType
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
343
344
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
10
DesignSect
MatProp
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD RAFTER
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
Frame
SectionType
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
11
DesignSect
MatProp
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
Frame
SectionType
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
12
DesignSect
MatProp
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
STUD
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
Frame
SectionType
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
503
504
505
506
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
DesignSect
MatProp
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
STUD
STUD
STUD
STUD
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
Default
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
TRACK
STUD
STUD
STUD
STUD
Type
DEAD
MODAL
DL
LIVE
EQX
EQY
WIND
WIND-2
WIND-3
WIND-4
WIND-5
WIND-6
WIND-7
WIND-8
LinStatic
LinModal
LinStatic
LinStatic
LinStatic
LinStatic
LinStatic
LinStatic
LinStatic
LinStatic
LinStatic
LinStatic
LinStatic
LinStatic
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
13
DesignType
DesActOpt
DEAD
OTHER
DEAD
DEAD
QUAKE
QUAKE
WIND
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
Prog Det
P R O J E C T:
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
Case
Type
WIND-9
WIND-10
WIND-11
WIND-12
LinStatic
LinStatic
LinStatic
LinStatic
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
U.S ARMY CORPS
OF ENGINEERS
C O L D F O M R E D T R U SS
Prog Det
Prog Det
Prog Det
Prog Det
DesignType
DesActOpt
OTHER
OTHER
OTHER
OTHER
Prog Det
Prog Det
Prog Det
Prog Det
Case
DesignAct
AutoType
DEAD
NonComposite
Other
NonComposite
NonComposite
Short-Term
Composite
Short-Term
Composite
Short-Term
Composite
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
None
Yes
Finished
None
None
Yes
Yes
Finished
Finished
None
Yes
Finished
None
Yes
Finished
None
Yes
Finished
None
Yes
Finished
None
None
None
None
None
None
None
None
None
None
None
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
MODAL
DL
LIVE
EQX
EQY
WIND
WIND-2
WIND-3
WIND-4
WIND-5
WIND-6
WIND-7
WIND-8
WIND-9
WIND-10
WIND-11
WIND-12
Notes
DesignType
DEAD
DL
LIVE
EQX
EQY
WIND
DEAD
DEAD
DEAD
QUAKE
QUAKE
WIND
IBC2009
IBC2009
ASCE7-10
14
Notes
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
U.S ARMY CORPS
OF ENGINEERS
C O L D F O M R E D T R U SS
Dir
EQX
EQY
X
Y
No
No
Prog Calc
Prog Calc
UserZ
0.028ft, 0.8
0.028ft, 0.8
No
No
8.000000
8.000000
Omega
3.000000
3.000000
1.000000
1.000000
User
User
Ss
S1
1.280000
1.280000
0.510000
0.510000
SD1
TUsed
Sec
0.0190
0.0093
TL
Sec
8.000000
8.000000
SiteClass
EQX
EQY
D
D
1.500000
1.500000
0.853333
0.853333
0.510000
0.510000
CoeffUsed
0.106667
0.106667
ExposeFrom
WIND
mph
70.00
No
0.850000
0.200000
15
ExpWidth
From diaphs
Exposur
e
C
Kzt
1.000000
1.000000
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
CONTRACT #
W5J9LE-12-C -0019
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
16
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
17
0.222427
0.315016
0.252803
0.238934
0.241552
0.011323
0.021625
0.028737
0.039639
0.084173
0.046702
0.129086
0.136145
0.000000
0.084998
0.079212
0.008359
0.011359
0.021572
0.028715
0.039584
0.083932
0.047133
0.122200
0.000000
0.074729
0.089105
0.008359
0.241036
0.342679
0.239294
0.239558
0.238028
0.009707
0.020847
0.029313
0.041871
0.088181
0.053671
0.405441
0.016383
0.111482
RatioType
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
Major Shear
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
Major Shear
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
302
303
304
305
306
308
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Column
APPROVED
BY:
SCE
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
18
0.000000
0.080641
0.078699
0.008359
0.009776
0.020829
0.029317
0.041869
0.088190
0.053652
0.016435
0.000000
0.079649
0.078372
0.008359
0.235294
0.340965
0.239459
0.240851
0.237874
0.009433
0.020318
0.028573
0.040710
0.086168
0.051843
0.356620
0.016995
0.114193
0.000000
0.079685
0.078266
0.008359
0.009500
0.020301
0.028579
0.040713
0.086172
0.051828
0.017019
0.000000
0.079847
0.078063
0.008359
0.236409
0.344752
0.240940
0.240621
0.237349
0.009765
RatioType
Major Shear
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
Major Shear
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
Major Shear
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
Major Shear
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
343
344
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Column
Column
Column
Column
Column
Brace
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
APPROVED
BY:
SCE
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
19
0.020781
0.029355
0.041896
0.088299
0.053427
0.361052
0.018998
0.111437
0.000000
0.079848
0.078126
0.008359
0.009836
0.020782
0.029363
0.041900
0.088299
0.053413
0.019009
0.000000
0.080350
0.079071
0.008359
0.218958
0.317904
0.250272
0.240525
0.240507
0.011953
0.021332
0.028390
0.039408
0.080874
0.052834
0.138478
0.136369
0.000000
0.088140
0.077256
0.008359
0.011957
0.020577
0.027789
0.038913
0.080736
0.053453
0.130343
0.000000
0.073273
0.087110
RatioType
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
Major Shear
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
Major Shear
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
Major Shear
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
Major Shear
PMM
PMM
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
D AT E : 1 3 - N O V- 2 0 1 2
Brace
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
C O L D F O M R E D T R U SS
APPROVED
BY:
SCE
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
See WarnMsg
See WarnMsg
See WarnMsg
See WarnMsg
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
20
0.008359
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.012081
0.010681
0.010678
0.012186
0.009726
0.008237
0.008251
0.009561
0.014947
0.013106
0.013073
0.015440
0.030822
0.024792
0.024736
0.031504
0.046892
0.034273
0.034338
0.045961
0.045277
0.031409
0.031762
0.042830
0.025815
0.019882
0.021666
0.028052
0.078693
0.046570
0.052651
0.064265
0.042545
0.031792
0.031378
0.045562
0.045822
0.034349
0.034262
0.047031
0.031607
RatioType
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
D AT E : 1 3 - N O V- 2 0 1 2
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
C O L D F O M R E D T R U SS
APPROVED
BY:
SCE
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
21
0.024725
0.024803
0.030719
0.015006
0.012839
0.012802
0.015531
0.009814
0.008269
0.008295
0.009587
0.010771
0.009494
0.009491
0.010883
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
RatioType
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
503
504
505
506
3
4
5
6
7
8
9
10
11
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
D AT E : 1 3 - N O V- 2 0 1 2
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
C O L D F O M R E D T R U SS
APPROVED
BY:
SCE
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
22
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.037106
0.017329
0.023627
0.040085
0.052755
0.054809
0.054688
0.052957
0.053271
0.056012
0.181223
0.187738
0.061308
RatioType
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
D AT E : 1 3 - N O V- 2 0 1 2
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Beam
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
C O L D F O M R E D T R U SS
APPROVED
BY:
SCE
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
23
0.136392
0.241757
0.239552
0.252874
0.315852
0.223951
0.222700
0.750033
0.004161
0.250362
0.128450
0.257782
0.135638
0.061308
0.111452
0.237947
0.239705
0.239522
0.342961
0.240420
0.237815
0.403537
0.061308
0.114192
0.237872
0.240850
0.239458
0.340964
0.235289
0.237858
0.356620
0.061308
0.111472
0.237435
0.240490
0.240723
0.344476
0.237051
0.232604
0.362963
0.061308
0.136686
0.240920
0.240797
0.250991
0.318053
0.222012
0.218944
0.772298
0.748277
RatioType
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
PMM
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
Brace
Brace
Brace
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
RatioType
0.220719
0.769472
0.214753
PMM
PMM
PMM
24
WarnMsg
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
302
303
304
305
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
25
WarnMsg
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
343
344
346
347
348
349
350
351
352
353
354
355
356
357
358
359
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
26
WarnMsg
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
27
WarnMsg
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
28
WarnMsg
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
503
504
505
506
3
4
5
6
7
8
9
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
29
WarnMsg
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
30
WarnMsg
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
WarnMsg
No Messages
No Messages
No Messages
No Messages
No Messages
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
31
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD3
DCLD2
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD3
DCLD2
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
Location
mm
0.00
1173.17
0.00
1173.17
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
0.00
0.00
0.00
0.00
1506.32
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
0.00
0.00
0.00
1506.32
0.00
0.00
1173.17
1173.17
1173.17
0.00
192.86
385.71
578.57
771.43
964.29
P
Kgf
27.83
4.97
5.54
5.15
5.26
-3.32
-4.87
-5.91
-7.33
-13.30
-5.59
-159.53
5.22
-8.464E-02
-13.91
-26.23
-8.464E-02
-3.30
-4.86
-5.91
-7.30
-12.65
-5.74
-157.01
-8.464E-02
10.57
-21.90
-8.464E-02
0.33
-0.27
-0.30
-0.28
4.911E-02
-4.08
-4.98
-5.45
-6.10
-6.73
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
302
303
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Column
Brace
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
32
DCLD2
DCLD2
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD3
DCLD2
DCLD2
DCLD2
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD3
DCLD2
DCLD2
DCLD2
DCLD3
DCLD2
DCLD2
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
Location
mm
1157.14
0.00
1316.67
0.00
0.00
0.00
1506.32
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
1316.67
0.00
0.00
1506.32
0.00
0.00
1173.17
1173.17
1173.17
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
0.00
1316.67
0.00
0.00
0.00
1506.32
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
1316.67
0.00
0.00
1506.32
0.00
0.00
1173.17
P
Kgf
-7.09
0.57
-6.69
0.11
-8.464E-02
-3.43
-3.04
-8.464E-02
-4.08
-4.98
-5.45
-6.10
-6.73
-7.09
-6.67
-8.464E-02
-2.13
-2.70
-8.464E-02
-0.27
-0.36
-0.37
-0.37
-5.226E-02
-3.95
-4.66
-4.91
-5.24
-5.65
-5.78
0.25
-5.54
4.779E-02
-8.464E-02
-2.66
-2.93
-8.464E-02
-3.95
-4.66
-4.91
-5.24
-5.65
-5.78
-5.54
-8.464E-02
-2.91
-2.63
-8.464E-02
0.18
-0.30
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
343
344
346
347
348
349
350
351
352
353
354
355
356
357
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
33
DCLD2
DCLD2
DCLD2
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD3
DCLD2
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
Location
mm
1173.17
1173.17
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
0.00
1316.67
0.00
0.00
0.00
1506.32
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
1316.67
0.00
0.00
1506.32
0.00
0.00
1173.17
0.00
1173.17
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
0.00
0.00
0.00
0.00
1506.32
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
P
Kgf
-0.23
-0.23
8.345E-02
-4.09
-4.98
-5.44
-6.10
-6.83
-6.83
0.90
-6.85
0.21
-8.464E-02
-2.50
-2.24
-8.464E-02
-4.09
-4.98
-5.44
-6.10
-6.83
-6.83
-6.83
-8.464E-02
-3.06
-3.50
-8.464E-02
29.64
5.53
5.46
4.98
5.10
-2.59
-4.80
-5.86
-7.42
-6.08
-15.60
-156.04
4.58
-8.464E-02
-17.92
-24.07
-8.464E-02
-2.58
-4.81
-5.86
-7.44
-6.73
-15.74
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Column
Column
Brace
Brace
Brace
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
See WarnMsg
See WarnMsg
See WarnMsg
See WarnMsg
No Messages
No Messages
No Messages
No Messages
No Messages
34
DCLD3
DCLD2
DCLD3
DCLD3
DCLD3
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD2
DCLD2
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD2
DCLD3
DCLD2
DCLD3
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD2
DCLD2
DCLD3
DCLD3
DCLD2
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
DCLD3
Location
mm
0.00
0.00
0.00
1506.32
0.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
0.00
0.00
1200.00
1200.00
0.00
0.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
0.00
1200.00
1200.00
1200.00
0.00
1200.00
0.00
0.00
1200.00
0.00
1200.00
0.00
P
Kgf
-153.42
-8.464E-02
15.07
-19.72
-8.464E-02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.91
-0.33
-0.33
-0.91
-1.39
-0.57
-0.56
-1.39
0.67
-0.50
-0.51
0.67
0.89
-0.46
-0.47
0.89
1.70
-0.59
-0.60
1.71
-1.18
-0.32
-0.49
-1.30
-1.29
0.92
-7.924E-02
-4.716E-02
-7.501E-02
-0.16
0.84
1.36
-1.30
-0.50
-0.31
-1.17
1.71
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
35
DCLD2
DCLD3
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD3
DCLD2
DCLD3
DCLD2
DCLD3
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD3
DCLD3
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
Location
mm
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
1200.00
1200.00
0.00
0.00
1200.00
1200.00
0.00
0.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
P
Kgf
-0.60
-0.59
1.70
0.89
-0.47
-0.46
0.89
0.67
-0.50
-0.51
0.67
-1.40
-0.57
-0.56
-1.39
-0.91
-0.33
-0.33
-0.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
503
504
505
506
3
4
5
6
7
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Brace
Brace
Brace
Brace
Brace
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
36
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD2
Location
mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1200.00
1200.00
1376.09
1376.09
1376.09
1376.09
1376.09
P
Kgf
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-20.20
-2.46
12.45
-26.47
-3.16
-5.90
-4.96
-2.98
-3.04
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Beam
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
37
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
Location
mm
1376.09
0.00
0.00
0.00
564.90
1173.17
0.00
1173.17
0.00
1173.17
970.42
202.76
400.00
0.00
688.04
0.00
688.04
0.00
564.90
1173.17
0.00
0.00
0.00
1173.17
970.42
202.76
0.00
564.90
1173.17
0.00
0.00
0.00
1173.17
970.42
202.76
0.00
564.90
1173.17
0.00
0.00
0.00
1173.17
970.42
202.76
0.00
564.90
1173.17
0.00
1173.17
0.00
P
Kgf
-6.04
-124.28
-121.34
-8.219E-02
3.90
3.83
3.67
4.03
3.43
19.93
19.54
44.11
0.00
-125.20
-135.10
-122.45
-131.80
-8.219E-02
9.676E-02
3.657E-02
-0.29
-0.31
-0.27
0.29
0.14
0.56
-8.219E-02
5.042E-02
-4.952E-02
-0.37
-0.37
-0.36
-0.26
-0.26
0.25
-8.219E-02
0.20
7.089E-02
-0.24
-0.24
-0.30
0.14
0.16
0.89
-8.219E-02
3.25
3.67
3.49
3.94
3.99
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Brace
Brace
Brace
Brace
Brace
Brace
Brace
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
Location
mm
1173.17
970.42
202.76
0.00
0.00
0.00
0.00
38
Equation
TotalRatio
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
0.222427
0.315016
0.252803
0.238934
0.241552
0.011323
0.021625
0.028737
0.039639
0.084173
0.046702
0.129086
0.136145
0.000000
0.084998
0.079212
0.008359
0.011359
0.021572
0.028715
0.039584
0.083932
0.047133
0.122200
0.000000
0.074729
0.089105
0.008359
0.241036
0.342679
0.239294
0.239558
0.238028
0.009707
0.020847
0.029313
P
Kgf
21.74
20.01
31.20
53.01
27.48
40.07
27.97
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
39
Equation
TotalRatio
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
0.041871
0.088181
0.053671
0.405441
0.016383
0.111482
0.000000
0.080641
0.078699
0.008359
0.009776
0.020829
0.029317
0.041869
0.088190
0.053652
0.016435
0.000000
0.079649
0.078372
0.008359
0.235294
0.340965
0.239459
0.240851
0.237874
0.009433
0.020318
0.028573
0.040710
0.086168
0.051843
0.356620
0.016995
0.114193
0.000000
0.079685
0.078266
0.008359
0.009500
0.020301
0.028579
0.040713
0.086172
0.051828
0.017019
0.000000
0.079847
0.078063
0.008359
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
343
344
346
347
348
349
350
351
352
353
354
355
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
40
Equation
TotalRatio
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
0.236409
0.344752
0.240940
0.240621
0.237349
0.009765
0.020781
0.029355
0.041896
0.088299
0.053427
0.361052
0.018998
0.111437
0.000000
0.079848
0.078126
0.008359
0.009836
0.020782
0.029363
0.041900
0.088299
0.053413
0.019009
0.000000
0.080350
0.079071
0.008359
0.218958
0.317904
0.250272
0.240525
0.240507
0.011953
0.021332
0.028390
0.039408
0.080874
0.052834
0.138478
0.136369
0.000000
0.088140
0.077256
0.008359
0.011957
0.020577
0.027789
0.038913
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
41
Equation
TotalRatio
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-1)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-1)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-1)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
0.080736
0.053453
0.130343
0.000000
0.073273
0.087110
0.008359
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.012081
0.010681
0.010678
0.012186
0.009726
0.008237
0.008251
0.009561
0.014947
0.013106
0.013073
0.015440
0.030822
0.024792
0.024736
0.031504
0.046892
0.034273
0.034338
0.045961
0.045277
0.031409
0.031762
0.042830
0.025815
0.019882
0.021666
0.028052
0.078693
0.046570
0.052651
0.064265
0.042545
0.031792
0.031378
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
42
Equation
TotalRatio
(C5.2.1-3)
(C5.1.1-1)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-1)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-1)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-1)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
0.045562
0.045822
0.034349
0.034262
0.047031
0.031607
0.024725
0.024803
0.030719
0.015006
0.012839
0.012802
0.015531
0.009814
0.008269
0.008295
0.009587
0.010771
0.009494
0.009491
0.010883
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.002571
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
503
504
505
506
3
4
5
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
43
Equation
TotalRatio
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-1)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.003245
0.037106
0.017329
0.023627
0.040085
0.052755
0.054809
0.054688
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
44
Equation
TotalRatio
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.2.1-3)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.2.1-3)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
0.052957
0.053271
0.056012
0.181223
0.187738
0.061308
0.136392
0.241757
0.239552
0.252874
0.315852
0.223951
0.222700
0.750033
0.004161
0.250362
0.128450
0.257782
0.135638
0.061308
0.111452
0.237947
0.239705
0.239522
0.342961
0.240420
0.237815
0.403537
0.061308
0.114192
0.237872
0.240850
0.239458
0.340964
0.235289
0.237858
0.356620
0.061308
0.111472
0.237435
0.240490
0.240723
0.344476
0.237051
0.232604
0.362963
0.061308
0.136686
0.240920
0.240797
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Equation
TotalRatio
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
(C5.1.1-2)
0.250991
0.318053
0.222012
0.218944
0.772298
0.748277
0.220719
0.769472
0.214753
45
Pn
Kgf
2101.37
2101.37
2101.37
2101.37
2101.37
4102.22
3951.30
3709.27
3395.23
3030.14
2636.24
2303.83
2697.13
4131.91
1916.48
1916.48
3727.28
4102.22
3951.30
3709.27
3395.23
3030.14
2636.24
2303.83
4131.91
1916.48
1916.48
3727.28
2101.37
2101.37
2101.37
2101.37
2101.37
4103.72
Pn0
Kgf
2985.13
2985.13
2985.13
2985.13
2985.13
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
2985.13
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
2985.13
2985.13
2985.13
2985.13
2985.13
4156.37
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
46
Pn
Kgf
3951.30
3709.27
3395.23
3030.14
2636.24
2330.56
2303.83
2697.13
4131.91
1916.48
1916.48
3727.28
4103.72
3951.30
3709.27
3395.23
3030.14
2636.24
2303.83
4131.91
1916.48
1916.48
3727.28
2101.37
2101.37
2101.37
2101.37
2101.37
4103.72
3951.30
3709.27
3395.23
3030.14
2636.24
2330.56
2303.83
2697.13
4131.91
1916.48
1916.48
3727.28
4103.72
3951.30
3709.27
3395.23
3030.14
2636.24
2303.83
4131.91
1916.48
Pn0
Kgf
4156.37
4156.37
4156.37
4156.37
4156.37
2985.13
4156.37
2985.13
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
2985.13
2985.13
2985.13
2985.13
2985.13
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
2985.13
4156.37
2985.13
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
343
344
346
347
348
349
350
351
352
353
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
47
Pn
Kgf
1916.48
3727.28
2101.37
2101.37
2101.37
2101.37
2101.37
4103.72
3951.30
3709.27
3395.23
3030.14
2636.24
2330.56
2303.83
2697.13
4131.91
1916.48
1916.48
3727.28
4103.72
3951.30
3709.27
3395.23
3030.14
2636.24
2303.83
4131.91
1916.48
1916.48
3727.28
2101.37
2101.37
2101.37
2101.37
2101.37
4102.22
3951.30
3709.27
3395.23
3030.14
2636.24
2303.83
2697.13
4131.91
1916.48
1916.48
3727.28
4102.22
3951.30
Pn0
Kgf
4156.37
4156.37
2985.13
2985.13
2985.13
2985.13
2985.13
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
2985.13
4156.37
2985.13
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
2985.13
2985.13
2985.13
2985.13
2985.13
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
2985.13
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
48
Pn
Kgf
3709.27
3395.23
3030.14
2636.24
2303.83
4131.91
1916.48
1916.48
3727.28
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
196.31
196.31
196.31
196.31
2546.97
Pn0
Kgf
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
49
Pn
Kgf
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2546.97
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
Pn0
Kgf
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
503
504
505
506
3
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
50
Pn
Kgf
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
2092.98
1607.99
1607.99
1607.99
1607.99
2180.90
Pn0
Kgf
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
2990.28
4156.37
4156.37
4156.37
4156.37
4156.37
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
51
Pn
Kgf
2180.90
2180.90
2180.90
2180.90
2180.90
2180.90
2180.90
2697.13
2734.09
2101.37
2101.37
2101.37
2101.37
2101.37
2330.56
2950.80
3936.25
2180.90
2180.90
2180.90
2180.90
2697.13
2734.09
2101.37
2101.37
2101.37
2101.37
2101.37
2330.56
2950.80
2697.13
2734.09
2101.37
2101.37
2101.37
2101.37
2101.37
2330.56
2950.80
2697.13
2734.09
2101.37
2101.37
2101.37
2101.37
2101.37
2330.56
2950.80
2697.13
2734.09
Pn0
Kgf
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
4156.37
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
4156.37
4156.37
4156.37
4156.37
4156.37
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Pn
Kgf
2101.37
2101.37
2101.37
2101.37
2101.37
2330.56
2950.80
2950.80
2330.56
2950.80
2330.56
Pn0
Kgf
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
2985.13
MnYieldMaj
Kgf-mm
102172.90
102172.90
102172.90
102172.90
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
102172.90
102172.90
102172.90
MnLTBMaj
Kgf-mm
102172.90
102172.90
102172.90
102172.90
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131488.28
102172.90
131966.96
126727.32
126928.69
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131461.97
131966.96
126676.44
126784.46
131966.96
102172.90
102172.90
102172.90
102172.90
52
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
53
MnYieldMaj
Kgf-mm
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
131966.96
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
102172.90
102172.90
102172.90
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
131966.96
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
MnLTBMaj
Kgf-mm
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
131470.21
102172.90
131966.96
124148.85
123824.60
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131453.38
131966.96
123960.89
123549.94
131966.96
102172.90
102172.90
102172.90
102172.90
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
130352.73
102172.90
131966.96
124065.91
123661.15
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
130352.64
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
343
344
346
347
348
349
350
351
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
54
MnYieldMaj
Kgf-mm
131966.96
131966.96
131966.96
131966.96
102172.90
102172.90
102172.90
102172.90
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
131966.96
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
102172.90
102172.90
102172.90
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
131966.96
131966.96
131966.96
131966.96
MnLTBMaj
Kgf-mm
131966.96
123984.76
123730.51
131966.96
102172.90
102172.90
102172.90
102172.90
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
129433.65
102172.90
131966.96
123846.93
123644.64
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
129445.63
131966.96
124258.76
123731.89
131966.96
102172.90
102172.90
102172.90
102172.90
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
129219.81
102172.90
131966.96
126500.35
127985.68
131966.96
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
55
MnYieldMaj
Kgf-mm
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
MnLTBMaj
Kgf-mm
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
129238.25
131966.96
126238.10
127864.68
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131497.91
131966.96
131966.96
131481.14
131286.84
131966.96
131966.96
131966.96
17378.12
17378.12
17378.12
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
56
MnYieldMaj
Kgf-mm
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
MnLTBMaj
Kgf-mm
17378.12
131481.48
131966.96
131966.96
131497.57
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
503
504
505
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
57
MnYieldMaj
Kgf-mm
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
131966.96
131966.96
131966.96
MnLTBMaj
Kgf-mm
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
102750.14
131256.95
131966.96
131966.96
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
506
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
58
MnYieldMaj
Kgf-mm
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
131966.96
131966.96
131966.96
131966.96
131966.96
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
MnLTBMaj
Kgf-mm
131966.96
128788.38
126639.32
127978.58
129364.33
129070.10
126488.68
127535.50
127547.40
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
131966.96
105467.15
105467.15
105467.15
105467.15
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
126
127
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
MnYieldMaj
Kgf-mm
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
MnLTBMaj
Kgf-mm
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
102172.90
54
55
56
57
58
60
61
62
63
64
65
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
240
241
59
AlphaMajor
KMajor
1.000000
1.000000
1.000000
1.000000
1.000000
0.999997
0.999981
0.999948
0.999886
0.999676
0.999804
0.992751
1.000000
1.000000
0.999173
0.998440
0.999999
0.999997
0.999981
0.999948
0.999886
0.999692
0.999799
0.992866
1.000000
1.000000
0.998698
0.999999
1.000000
0.999991
1.000000
1.000000
1.000000
1.000000
1.000000
1.765703
1.561697
1.457042
1.394040
1.352281
1.322692
1.304089
1.000000
1.317261
1.000000
1.000000
1.000000
1.765703
1.561697
1.457042
1.394040
1.352281
1.322692
1.304089
1.317261
1.000000
1.000000
1.000000
1.000000
1.000000
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
242
243
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
60
AlphaMajor
KMajor
0.999990
0.999990
1.000000
0.999996
0.999981
0.999952
0.999905
0.999836
0.999751
1.000000
0.999696
1.000000
1.000000
0.999796
0.999819
0.999999
0.999996
0.999981
0.999952
0.999905
0.999836
0.999751
0.999697
1.000000
0.999874
0.999839
0.999999
0.999991
0.999988
0.999988
0.999988
0.999998
0.999996
0.999982
0.999957
0.999918
0.999862
0.999797
1.000000
0.999748
1.000000
1.000000
0.999842
0.999826
0.999999
0.999996
0.999982
0.999957
0.999918
0.999862
1.000000
1.000000
1.000000
1.561697
1.394040
1.322692
1.283759
1.259410
1.242799
1.000000
1.232601
1.000000
1.317261
1.000000
1.000000
1.000000
1.561697
1.394040
1.322692
1.283759
1.259410
1.242799
1.232601
1.317261
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.561697
1.394040
1.322692
1.283759
1.259410
1.242799
1.000000
1.232601
1.000000
1.317261
1.000000
1.000000
1.000000
1.561697
1.394040
1.322692
1.283759
1.259410
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
295
296
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
343
344
346
347
348
349
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
61
AlphaMajor
KMajor
0.999797
0.999748
1.000000
0.999827
0.999844
0.999999
1.000000
0.999990
0.999992
0.999992
1.000000
0.999996
0.999981
0.999952
0.999905
0.999833
0.999760
1.000000
0.999689
1.000000
1.000000
0.999851
0.999867
0.999999
0.999996
0.999981
0.999952
0.999905
0.999834
0.999760
0.999690
1.000000
0.999818
0.999792
0.999999
1.000000
1.000000
1.000000
1.000000
1.000000
0.999997
0.999981
0.999949
0.999884
0.999852
0.999452
0.992910
1.000000
1.000000
0.998934
1.242799
1.232601
1.317261
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.561697
1.394040
1.322692
1.283759
1.259410
1.242799
1.000000
1.232601
1.000000
1.317261
1.000000
1.000000
1.000000
1.561697
1.394040
1.322692
1.283759
1.259410
1.242799
1.232601
1.317261
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.765703
1.561697
1.457042
1.394040
1.352281
1.322692
1.304089
1.000000
1.317261
1.000000
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
62
AlphaMajor
KMajor
0.998569
0.999999
0.999997
0.999981
0.999949
0.999884
0.999836
0.999447
0.993029
1.000000
1.000000
0.998827
0.999999
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
0.999966
0.999987
0.999987
0.999966
0.999947
0.999978
0.999979
0.999948
1.000000
0.999981
0.999981
1.000000
1.000000
0.999983
0.999982
1.000000
1.000000
0.999978
0.999977
1.000000
0.999956
0.999988
0.999981
0.999951
0.999951
1.000000
0.999997
0.999998
0.999997
1.000000
1.000000
1.765703
1.561697
1.457042
1.394040
1.352281
1.322692
1.304089
1.317261
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
63
AlphaMajor
KMajor
0.999994
1.000000
1.000000
0.999951
0.999981
0.999988
0.999956
1.000000
0.999977
0.999978
1.000000
1.000000
0.999982
0.999983
1.000000
1.000000
0.999981
0.999981
1.000000
0.999947
0.999978
0.999979
0.999948
0.999966
0.999987
0.999987
0.999966
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
503
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
64
AlphaMajor
KMajor
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
0.987802
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
504
505
506
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
65
AlphaMajor
KMajor
0.998511
1.000000
0.984014
0.999843
0.999707
0.999754
0.999852
0.999849
0.999700
0.993832
0.993978
0.999999
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
0.998447
0.998324
0.998481
0.998365
0.999999
1.000000
1.000000
0.999990
0.999990
0.999991
1.000000
1.000000
1.000000
0.999999
1.000000
0.999998
0.999988
0.999988
0.999988
0.999991
0.999994
1.000000
0.999999
1.000000
1.000000
0.999992
0.999992
0.999990
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
AlphaMajor
KMajor
1.000000
1.000000
0.999999
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
MnLTBMin
Kgf-mm
3960.58
3960.58
3960.58
3960.58
3960.58
46948.44
46948.44
46948.44
46948.44
46948.44
25745.94
25745.94
3960.58
25745.94
25745.94
46948.44
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
46948.44
25745.94
25745.94
25745.94
25745.94
MntMin
Kgf-mm
74326.20
74326.20
74326.20
74326.20
74326.20
31760.71
31760.71
31760.71
31760.71
31760.71
64087.46
64087.46
74326.20
64087.46
64087.46
31760.71
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
31760.71
64087.46
64087.46
64087.46
64087.46
66
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
240
241
242
243
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
67
MnLTBMin
Kgf-mm
3960.58
3960.58
3960.58
3960.58
3960.58
46948.44
25745.94
46948.44
25745.94
46948.44
25745.94
3960.58
46948.44
3960.58
25745.94
25745.94
25745.94
25745.94
25745.94
46948.44
25745.94
25745.94
25745.94
46948.44
25745.94
25745.94
25745.94
25745.94
25745.94
3960.58
3960.58
3960.58
3960.58
3960.58
46948.44
25745.94
46948.44
46948.44
46948.44
25745.94
3960.58
46948.44
3960.58
25745.94
25745.94
25745.94
25745.94
25745.94
46948.44
25745.94
MntMin
Kgf-mm
74326.20
74326.20
74326.20
74326.20
74326.20
31760.71
64087.46
31760.71
64087.46
31760.71
64087.46
74326.20
31760.71
74326.20
64087.46
64087.46
64087.46
64087.46
64087.46
31760.71
64087.46
64087.46
64087.46
31760.71
64087.46
64087.46
64087.46
64087.46
64087.46
74326.20
74326.20
74326.20
74326.20
74326.20
31760.71
64087.46
31760.71
31760.71
31760.71
64087.46
74326.20
31760.71
74326.20
64087.46
64087.46
64087.46
64087.46
64087.46
31760.71
64087.46
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
293
294
295
296
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
343
344
346
347
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
68
MnLTBMin
Kgf-mm
25745.94
25745.94
46948.44
25745.94
25745.94
25745.94
25745.94
25745.94
3960.58
3960.58
3960.58
3960.58
3960.58
46948.44
25745.94
46948.44
46948.44
46948.44
25745.94
3960.58
46948.44
3960.58
25745.94
25745.94
25745.94
25745.94
25745.94
46948.44
25745.94
25745.94
25745.94
46948.44
25745.94
25745.94
25745.94
25745.94
25745.94
3960.58
3960.58
3960.58
3960.58
3960.58
46948.44
25745.94
25745.94
25745.94
25745.94
46948.44
25745.94
3960.58
MntMin
Kgf-mm
64087.46
64087.46
31760.71
64087.46
64087.46
64087.46
64087.46
64087.46
74326.20
74326.20
74326.20
74326.20
74326.20
31760.71
64087.46
31760.71
31760.71
31760.71
64087.46
74326.20
31760.71
74326.20
64087.46
64087.46
64087.46
64087.46
64087.46
31760.71
64087.46
64087.46
64087.46
31760.71
64087.46
64087.46
64087.46
64087.46
64087.46
74326.20
74326.20
74326.20
74326.20
74326.20
31760.71
64087.46
64087.46
64087.46
64087.46
31760.71
64087.46
74326.20
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
69
MnLTBMin
Kgf-mm
25745.94
25745.94
46948.44
25745.94
25745.94
46948.44
46948.44
46948.44
46948.44
25745.94
46948.44
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
46948.44
46948.44
46948.44
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
46948.44
46948.44
46948.44
46948.44
25745.94
46948.44
46948.44
25745.94
25745.94
46948.44
25745.94
MntMin
Kgf-mm
64087.46
64087.46
31760.71
64087.46
64087.46
31760.71
31760.71
31760.71
31760.71
64087.46
31760.71
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
31760.71
31760.71
31760.71
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
31760.71
31760.71
31760.71
31760.71
64087.46
31760.71
31760.71
64087.46
64087.46
31760.71
64087.46
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
70
MnLTBMin
Kgf-mm
25745.94
46948.44
25745.94
46948.44
25745.94
25745.94
46948.44
46948.44
25745.94
46948.44
46948.44
46948.44
46948.44
25745.94
25745.94
25745.94
25745.94
46948.44
46948.44
46948.44
46948.44
25745.94
25745.94
25745.94
46948.44
46948.44
46948.44
46948.44
46948.44
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
MntMin
Kgf-mm
64087.46
31760.71
64087.46
31760.71
64087.46
64087.46
31760.71
31760.71
64087.46
31760.71
31760.71
31760.71
31760.71
64087.46
64087.46
64087.46
64087.46
31760.71
31760.71
31760.71
31760.71
64087.46
64087.46
64087.46
31760.71
31760.71
31760.71
31760.71
31760.71
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
71
MnLTBMin
Kgf-mm
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
3895.51
MntMin
Kgf-mm
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
76880.41
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
498
503
504
505
506
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
72
MnLTBMin
Kgf-mm
3895.51
25745.94
46948.44
46948.44
46948.44
25745.94
25745.94
25745.94
25745.94
25745.94
25745.94
46948.44
25745.94
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
25745.94
46948.44
46948.44
25745.94
25745.94
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
MntMin
Kgf-mm
76880.41
64087.46
31760.71
31760.71
31760.71
64087.46
64087.46
64087.46
64087.46
64087.46
64087.46
31760.71
64087.46
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
64087.46
31760.71
31760.71
64087.46
64087.46
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
MnLTBMin
Kgf-mm
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
3960.58
MntMin
Kgf-mm
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
74326.20
54
55
56
57
58
60
61
62
63
64
65
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
73
LFactMinor
Fy
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
0.518487
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
Kgf/mm2
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
82
83
240
241
242
243
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
289
290
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
74
LFactMinor
Fy
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
0.827171
1.000000
0.518487
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
0.827171
1.000000
0.518487
1.000000
1.000000
1.000000
1.000000
1.000000
Kgf/mm2
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
291
292
293
294
295
296
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
343
344
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
75
LFactMinor
Fy
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
0.827171
1.000000
0.518487
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
Kgf/mm2
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
76
LFactMinor
Fy
1.000000
0.518487
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
Kgf/mm2
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
77
LFactMinor
Fy
1.000000
1.000000
1.000000
4.000000
4.000000
4.000000
4.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
Kgf/mm2
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
78
LFactMinor
Fy
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
Kgf/mm2
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
496
497
498
503
504
505
506
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
79
LFactMinor
Fy
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
2.000000
2.000000
2.000000
2.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
Kgf/mm2
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
U.S ARMY CORPS
OF ENGINEERS
C O L D F O M R E D T R U SS
LFactMinor
Fy
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
Kgf/mm2
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
23.201
80
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
80
81
82
83
240
241
242
243
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
287
288
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
81
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
289
290
291
292
293
294
295
296
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
341
342
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
82
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
343
344
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
83
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
84
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
85
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
494
495
496
497
498
503
504
505
506
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
86
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
87
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
78
79
80
81
82
83
240
241
242
243
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
285
286
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
88
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
287
288
289
290
291
292
293
294
295
296
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
339
340
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
89
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
341
342
343
344
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
90
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
kl/r > 200
kl/r > 200
l/r > 300
l/r > 300
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
91
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
92
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
492
493
494
495
496
497
498
503
504
505
506
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
93
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
94
DCLD3
DCLD1
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD1
DCLD2
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD3
VMajorLoc
mm
1173.17
0.00
1173.17
1173.17
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
1316.67
0.00
0.00
0.00
0.00
0.00
192.86
385.71
578.57
VMajorRatio
0.001525
0.000973
0.000972
0.000984
0.001008
0.004831
0.005869
0.005804
0.006449
0.011550
0.005987
0.002061
0.000652
0.000000
0.001039
0.001010
0.000480
0.004831
0.005869
0.005804
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
76
77
78
79
80
81
82
83
240
241
242
243
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
283
284
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Brace
Column
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
95
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD3
DCLD2
DCLD1
DCLD2
DCLD1
DCLD1
DCLD1
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
DCLD2
VMajorLoc
mm
771.43
964.29
1157.14
1316.67
0.00
0.00
0.00
0.00
1173.17
0.00
0.00
1173.17
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
202.76
1316.67
0.00
0.00
0.00
1506.32
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
1316.67
0.00
0.00
1506.32
0.00
1173.17
0.00
0.00
1173.17
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
202.76
1316.67
VMajorRatio
0.006449
0.011552
0.005987
0.002066
0.000000
0.001039
0.001010
0.000480
0.001013
0.000970
0.000969
0.000979
0.001015
0.005120
0.006870
0.006989
0.007839
0.013720
0.007097
0.003044
0.002162
0.000651
0.000000
0.001018
0.001006
0.000480
0.005121
0.006870
0.006989
0.007839
0.013720
0.007097
0.002165
0.000000
0.001018
0.001006
0.000480
0.001009
0.000970
0.000969
0.000978
0.001015
0.004841
0.006606
0.006744
0.007569
0.013321
0.006855
0.002121
0.002291
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
336
337
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
96
DCLD1
DCLD2
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD2
DCLD2
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD1
DCLD2
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD2
DCLD1
DCLD1
DCLD1
DCLD3
DCLD1
DCLD1
DCLD1
DCLD1
VMajorLoc
mm
0.00
0.00
0.00
1506.32
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
1316.67
0.00
0.00
1506.32
0.00
1173.17
0.00
0.00
1173.17
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
202.76
1316.67
0.00
0.00
0.00
1506.32
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
1316.67
0.00
0.00
1506.32
0.00
1173.17
0.00
1173.17
1173.17
0.00
VMajorRatio
0.000652
0.000000
0.001017
0.001007
0.000480
0.004841
0.006606
0.006744
0.007569
0.013321
0.006855
0.002291
0.000000
0.001017
0.001007
0.000480
0.001013
0.000970
0.000969
0.000979
0.001015
0.005121
0.006870
0.006989
0.007837
0.013730
0.007073
0.003290
0.002492
0.000651
0.000000
0.001018
0.001006
0.000480
0.005121
0.006870
0.006989
0.007838
0.013729
0.007073
0.002489
0.000000
0.001018
0.001006
0.000480
0.001776
0.000980
0.000974
0.000984
0.001007
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
339
340
341
342
343
344
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Column
Column
Column
Column
Column
Column
Column
Brace
Column
Brace
Brace
Brace
Column
Column
Column
Column
Column
Column
Column
Column
Brace
Brace
Brace
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
97
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD1
DCLD2
DCLD1
DCLD1
DCLD1
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD2
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD2
DCLD1
DCLD1
DCLD3
DCLD3
DCLD2
DCLD3
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD2
DCLD3
DCLD2
DCLD3
DCLD3
DCLD2
DCLD3
VMajorLoc
mm
192.86
385.71
578.57
771.43
964.29
1157.14
1316.67
0.00
0.00
0.00
0.00
0.00
192.86
385.71
578.57
771.43
964.29
1157.14
1316.67
0.00
0.00
0.00
0.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
VMajorRatio
0.004831
0.005869
0.005802
0.006446
0.011566
0.005951
0.002606
0.000652
0.000000
0.001047
0.001017
0.000480
0.004831
0.005869
0.005803
0.006447
0.011564
0.005951
0.002600
0.000000
0.001047
0.001017
0.000480
0.001034
0.001034
0.001034
0.001034
0.001034
0.001034
0.001034
0.001034
0.001139
0.001036
0.001036
0.001139
0.001790
0.001557
0.001557
0.001789
0.002407
0.002027
0.002027
0.002409
0.003327
0.002702
0.002703
0.003328
0.005896
0.004583
0.004588
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
98
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD3
DCLD1
DCLD1
DCLD3
DCLD3
DCLD1
DCLD1
DCLD3
DCLD3
DCLD2
DCLD3
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD3
DCLD2
DCLD3
DCLD2
DCLD2
DCLD3
DCLD2
DCLD3
DCLD3
DCLD2
DCLD3
DCLD2
DCLD2
DCLD1
DCLD1
DCLD3
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
VMajorLoc
mm
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
0.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
1200.00
0.00
0.00
0.00
0.00
0.00
VMajorRatio
0.005876
0.004163
0.003180
0.003199
0.004116
0.001289
0.001102
0.001097
0.001559
0.001570
0.001097
0.001102
0.001300
0.004117
0.003199
0.003180
0.004162
0.005873
0.004588
0.004582
0.005898
0.003328
0.002703
0.002702
0.003327
0.002407
0.002027
0.002027
0.002409
0.001790
0.001557
0.001557
0.001789
0.001139
0.001036
0.001036
0.001139
0.001034
0.001034
0.001034
0.001034
0.001034
0.001034
0.001034
0.001034
0.001016
0.001016
0.001016
0.001016
0.001016
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
99
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
VMajorLoc
mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VMajorRatio
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
490
491
492
493
494
495
496
497
498
503
504
505
506
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Beam
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Beam
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
100
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD3
DCLD3
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD3
DCLD1
DCLD3
DCLD3
DCLD3
DCLD3
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD3
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
VMajorLoc
mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1200.00
0.00
1200.00
0.00
1376.09
1376.09
1376.09
1376.09
1376.09
1376.09
1376.09
1376.09
608.28
564.90
1173.17
0.00
0.00
1173.17
0.00
970.42
0.00
0.00
688.04
688.04
688.04
688.04
608.28
564.90
1173.17
0.00
1173.17
1173.17
0.00
970.42
0.00
608.28
564.90
1173.17
0.00
1173.17
1173.17
VMajorRatio
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.001016
0.003393
0.002042
0.002627
0.003377
0.000391
0.000391
0.000367
0.000367
0.000391
0.000391
0.006139
0.006197
0.000502
0.000652
0.001008
0.000984
0.000972
0.000973
0.001541
0.005878
0.209408
0.000345
0.019212
0.000939
0.019331
0.000930
0.000502
0.000651
0.001015
0.000979
0.000969
0.000970
0.001013
0.000813
0.003045
0.000502
0.000652
0.001015
0.000978
0.000969
0.000970
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
Brace
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
DCLD1
DCLD1
DCLD2
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD3
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD1
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
DCLD3
VMajorLoc
mm
0.00
0.00
0.00
608.28
564.90
1173.17
0.00
1173.17
1173.17
0.00
970.42
0.00
608.28
564.90
1173.17
0.00
0.00
1173.17
0.00
970.42
0.00
202.76
0.00
202.76
0.00
VMajorRatio
VMinorLoc
VMinorRatio
mm
0.00
1173.17
0.00
1173.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1506.32
566.12
0.00
0.003655
0.004007
0.003587
0.003569
0.003652
0.000976
0.000370
0.000213
0.000127
0.000104
0.000000
0.000984
0.002341
0.000000
0.006987
0.006879
0.002396
0.000833
0.001009
0.000814
0.002122
0.000502
0.000651
0.001015
0.000979
0.000969
0.000970
0.001013
0.000814
0.003291
0.000502
0.000652
0.001007
0.000984
0.000974
0.000980
0.001792
0.007216
0.202846
0.209340
0.005785
0.202697
0.007126
54
55
56
57
58
60
61
62
63
64
65
67
68
69
70
71
72
73
101
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
74
75
76
77
78
79
80
81
82
83
240
241
242
243
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
280
281
282
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
102
VMinorLoc
VMinorRatio
mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1506.32
566.12
0.00
1173.17
1173.17
1173.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1506.32
566.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1506.32
566.12
0.00
1173.17
1173.17
1173.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000296
0.000173
0.000101
0.000000
0.000000
0.000971
0.000000
0.006987
0.006880
0.002396
0.003706
0.004134
0.003533
0.003567
0.003609
0.000375
0.000000
0.000000
0.000000
0.000000
0.000000
0.008583
0.000000
0.002134
0.000000
0.007091
0.006998
0.002396
0.000375
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.007091
0.006998
0.002396
0.003680
0.004125
0.003531
0.003574
0.003610
0.000372
0.000000
0.000000
0.000000
0.000000
0.000000
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
333
334
335
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
103
VMinorLoc
VMinorRatio
mm
0.00
0.00
0.00
0.00
0.00
1506.32
566.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1506.32
566.12
0.00
1173.17
1173.17
1173.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1506.32
566.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1506.32
566.12
0.00
1173.17
0.00
0.007192
0.000000
0.002153
0.000000
0.007068
0.006980
0.002396
0.000372
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.007068
0.006980
0.002396
0.003681
0.004146
0.003544
0.003575
0.003606
0.000375
0.000000
0.000000
0.000000
0.000000
0.000000
0.007535
0.000000
0.002131
0.000000
0.007088
0.007002
0.002396
0.000375
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.007088
0.007002
0.002396
0.003630
0.004022
0.003574
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
336
337
339
340
341
342
343
344
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
104
VMinorLoc
VMinorRatio
mm
1173.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1506.32
566.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1506.32
566.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.003578
0.003648
0.000925
0.000362
0.000212
0.000123
0.000117
0.000119
0.001178
0.002339
0.000000
0.006984
0.006884
0.002396
0.000782
0.000288
0.000173
0.000000
0.000104
0.000145
0.001165
0.000000
0.006984
0.006884
0.002396
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000365
0.000315
0.000314
0.000370
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000432
0.000384
0.000379
0.000466
0.000225
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
105
VMinorLoc
VMinorRatio
mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000181
0.000185
0.000176
0.000821
0.000624
0.000641
0.000717
0.001013
0.000857
0.000855
0.001098
0.001122
0.000853
0.000859
0.000989
0.000703
0.000644
0.000622
0.000835
0.000169
0.000185
0.000180
0.000232
0.000470
0.000379
0.000385
0.000427
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000365
0.000315
0.000314
0.000371
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
106
VMinorLoc
VMinorRatio
mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
488
489
490
491
492
493
494
495
496
497
498
503
504
505
506
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
109
110
111
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
107
VMinorLoc
VMinorRatio
mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1376.09
1376.09
1376.09
1376.09
1376.09
1376.09
1376.09
1376.09
0.00
564.90
1173.17
0.00
1173.17
0.00
1173.17
970.42
202.76
400.00
0.00
688.04
0.00
688.04
0.00
564.90
1173.17
0.00
0.00
0.00
1173.17
970.42
202.76
0.00
564.90
1173.17
0.00
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.005930
0.005930
0.005954
0.005954
0.005982
0.005982
0.005959
0.005959
0.001825
0.002341
0.003652
0.003570
0.003586
0.004009
0.003651
0.003178
0.008392
0.001693
0.005783
0.005879
0.005784
0.005880
0.001825
0.002133
0.003608
0.003568
0.003535
0.004135
0.003703
0.003505
0.008521
0.001825
0.002153
0.003610
0.003574
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
U.S ARMY CORPS
OF ENGINEERS
C O L D F O M R E D T R U SS
VMinorLoc
VMinorRatio
mm
0.00
0.00
1173.17
970.42
202.76
0.00
564.90
1173.17
0.00
0.00
0.00
1173.17
970.42
202.76
0.00
564.90
1173.17
0.00
1173.17
0.00
1173.17
970.42
202.76
0.00
0.00
0.00
0.00
0.003531
0.004125
0.003680
0.003475
0.007192
0.001825
0.002131
0.003606
0.003574
0.003543
0.004145
0.003683
0.003463
0.007597
0.001825
0.002339
0.003649
0.003577
0.003575
0.004021
0.003634
0.003092
0.008790
0.008434
0.003185
0.008749
0.003085
54
55
56
57
58
60
61
62
63
64
65
67
68
69
70
108
RLLF
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
71
72
73
74
75
76
77
78
79
80
81
82
83
240
241
242
243
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
278
279
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
109
RLLF
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
110
RLLF
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
333
334
335
336
337
339
340
341
342
343
344
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
111
RLLF
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
112
RLLF
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
113
RLLF
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
485
486
487
488
489
490
491
492
493
494
495
496
497
498
503
504
505
506
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
107
108
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
114
RLLF
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
RLLF
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
1.000000
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
115
FramingType
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
Braced
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
240
241
242
243
244
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
271
272
273
274
275
277
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
116
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
302
303
304
305
306
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
117
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
330
331
333
334
335
336
337
339
340
341
342
343
344
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
118
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
119
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
120
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
503
504
505
506
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
28
30
31
32
33
99
100
101
102
103
104
105
106
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
121
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
Frame
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
No Messages
122
P R O J E C T:
ANCOP/PRC
LO C AT I O N :
KANDAHAR,
AFGHANISTAN
CONTRACT #
W5J9LE-12-C -0019
D E PA R T M E N T O F T H E A R M Y
U. S ARMY CORP S OF
E N GIN EE RIN G
DESIGNED
BY:
H. SOLTANI
AFGHANISTAN ENGINEERING
Contractor & Designer
S TAT E
CORPS
ENGINEERING
First Street, Karte4, Kabul
Afghanistan
[email protected]
REVIEWED
BY:
NASEEM
APPROVED
BY:
SCE
D AT E : 1 3 - N O V- 2 0 1 2
C O L D F O M R E D T R U SS
123