Short Term Program - Pit by Pit (7sw-D-fr65)

This Gantt chart outlines the schedule for a short term construction project over 733 days from August 2013 through September 2015. It involves multiple tasks including pile construction, pile cap construction, slope construction divided into zones 1-3 with multiple rows in each zone, and connecting step channels between zones and rows. The project involves monitoring of instruments during construction.

Uploaded by

Gary Lo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views

Short Term Program - Pit by Pit (7sw-D-fr65)

This Gantt chart outlines the schedule for a short term construction project over 733 days from August 2013 through September 2015. It involves multiple tasks including pile construction, pile cap construction, slope construction divided into zones 1-3 with multiple rows in each zone, and connecting step channels between zones and rows. The project involves monitoring of instruments during construction.

Uploaded by

Gary Lo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

ID

733 days

20/8/13

Finish
Qtr 3, 2013
Qtr 4, 2013
Qtr 1, 2014
Qtr 2, 2014
Qtr 3, 2014
Qtr 4, 2014
Qtr 1, 2015
Qtr 2, 2015
Qtr 3, 2015
Qtr 4
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
31323334353637383940414243444546474849505152 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940414243444546474849505152 1 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435363738394041
21/9/15

EVP3230 - UU Diversion for Pile Cap A3

91 days

13/8/14

11/11/14

EVS2110 - PILE CAP at PIER A3

15 days

25/2/15

15/3/15

CBP1210 - Pile Construction (GL 18-22)

42 days

19/2/14

1/4/14

CES1140 - Pile Cap Construction (GL 20-22)

29 days

14/5/14

11/6/14

Submission of Instrutmentation & Monitoring Plan (IMP)

14 days

20/8/13

2/9/13

Approval of IMP

7 days

3/9/13

9/9/13

Installation of Instruments (for Slope 7SW-D/FR65)

21 days

10/9/13

30/9/13

Background Monitoring over an Initial phase (4 sets initial


reading taken weekly basic)

28 days

1/10/13

28/10/13

10

The Engineer approved the initial reading

7 days

29/10/13

4/11/13

11

18 nos 3m Deep Trial Pits along the slope crest

14 days

5/11/13

18/11/13

12

ZONE 1

336 days

19/11/13

4/11/14

162 days

27/5/14

4/11/14

13

Task Name

Duration

Start

PIT BY PIT CONSTRUCTION FOR SLOPE 7SW-D/FR65

1-A

14

ROW 1 - 2 Teams

24 days

27/5/14

19/6/14

15

ROW 2 - 2 Teams

24 days

20/6/14

13/7/14

16

ROW 3 - 2 Teams

24 days

14/7/14

6/8/14

17

ROW 4 - 2 Teams

24 days

7/8/14

30/8/14

18

ROW 5 - 2 Teams

24 days

31/8/14

23/9/14

19

ROW 6 - 2 Teams

24 days

24/9/14

17/10/14

20

ROW 7 - 1 Teams

18 days

18/10/14

4/11/14

174 days

19/11/13

26/5/14

21

1-B

22

ROW 1 - 2 Teams

24 days

19/11/13

12/12/13

23

ROW 2 - 2 Teams

24 days

13/12/13

5/1/14

24

ROW 3 - 2 Teams

24 days

6/1/14

13/2/14

25

ROW 4 - 2 Teams

24 days

14/2/14

9/3/14

26

ROW 5 - 2 Teams

24 days

10/3/14

2/4/14

27

ROW 6 - 2 Teams

24 days

3/4/14

26/4/14

28

STEP CHANNEL(1-A to 1-B)

30 days

27/4/14

26/5/14

168 days

21/5/14

4/11/14

29

1-C

30

ROW 1 - 4 Teams

24 days

21/5/14

13/6/14

31

ROW 2 - 3 Teams

24 days

14/6/14

7/7/14

32

ROW 3 - 4 Teams

24 days

8/7/14

31/7/14

33

ROW 4 - 4 Teams

24 days

1/8/14

24/8/14

34

ROW 5 - 4 Teams

24 days

25/8/14

17/9/14

35

ROW 6 - 4 Teams

24 days

18/9/14

11/10/14

36

STEP CHANNEL(1-B to 1-F)

24 days

12/10/14

4/11/14

168 days

19/11/13

20/5/14

37

1-D

38

ROW 1 - 4 Teams

24 days

19/11/13

12/12/13

39

ROW 2 - 2 Teams

24 days

13/12/13

5/1/14

40

ROW 3 - 4 Teams

24 days

6/1/14

13/2/14

41

ROW 4 - 4 Teams

24 days

14/2/14

9/3/14

42

ROW 5 - 4 Teams

24 days

10/3/14

2/4/14

43

ROW 6 - 4 Teams

24 days

3/4/14

26/4/14

44

ROW 7 - 2 Teams

24 days

27/4/14

20/5/14

168 days

9/5/14

23/10/14

45

1-E

46

ROW 1 - 3 Teams

24 days

9/5/14

1/6/14

47

ROW 2 - 3 Teams

24 days

2/6/14

25/6/14

48

ROW 3 - 3 Teams

24 days

26/6/14

19/7/14

49

ROW 4 - 3 Teams

24 days

20/7/14

12/8/14

50

ROW 5 - 3 Teams

24 days

13/8/14

5/9/14

51

ROW 6 - 3 Teams

24 days

6/9/14

29/9/14

52

ROW 7 - 1 Teams

18 days

30/9/14

17/10/14

53

STEP CHANNEL(1-F to 1-H)

24 days

30/9/14

23/10/14

156 days

19/11/13

8/5/14

54

1-F

55

ROW 1 - 3 Teams

24 days

19/11/13

12/12/13

56

ROW 2 - 2 Teams

24 days

13/12/13

5/1/14

57

ROW 3 - 3 Teams

24 days

6/1/14

13/2/14

58

ROW 4 - 3 Teams

24 days

14/2/14

9/3/14

59

ROW 5 - 3 Teams

24 days

10/3/14

2/4/14

60

ROW 6 - 3 Teams

24 days

3/4/14

26/4/14

Task
Project: SHORT TERM PROGRAM
Split
Date: 20/8/13
Milestone

Summary
Project Summary
Inactive Milestone

Inactive Summary
Manual Task
Duration-only

Start-only
Finish-only
Deadline
Page 1

Progress

ID

Task Name

ROW 7 - 1 Teams

61

Start

12 days

27/4/14

Finish
Qtr 3, 2013
Qtr 4, 2013
Qtr 1, 2014
Qtr 2, 2014
Qtr 3, 2014
Qtr 4, 2014
Qtr 1, 2015
Qtr 2, 2015
Qtr 3, 2015
Qtr 4
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
31323334353637383940414243444546474849505152 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940414243444546474849505152 1 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435363738394041
8/5/14

144 days

27/4/14

17/9/14

63

ROW 1 - 3 Teams

24 days

27/4/14

20/5/14

64

ROW 2 - 3 Teams

24 days

21/5/14

13/6/14

65

ROW 3 - 3 Teams

24 days

14/6/14

7/7/14

66

ROW 4 - 3 Teams

24 days

8/7/14

31/7/14

67

ROW 5 - 3 Teams

24 days

1/8/14

24/8/14

68

ROW 6 - 3 Teams

24 days

25/8/14

17/9/14

144 days

19/11/13

26/4/14

62

69

1-G

Duration

1-H

70

ROW 1 - 3 Teams

24 days

19/11/13

12/12/13

71

ROW 2 - 3 Teams

24 days

13/12/13

5/1/14

72

ROW 3 - 3 Teams

24 days

6/1/14

13/2/14

73

ROW 4 - 3 Teams

24 days

14/2/14

9/3/14

74

ROW 5 - 3 Teams

24 days

10/3/14

2/4/14

75

ROW 6 - 3 Teams

24 days

3/4/14

26/4/14

306 days

12/6/14

28/4/15

84 days

12/6/14

3/9/14

76
77

ZONE 2
2-A

78

ROW 1 - 2 Teams

24 days

12/6/14

5/7/14

79

ROW 2 - 2 Teams

24 days

6/7/14

29/7/14

80

ROW 3 - 1 Teams

24 days

30/7/14

22/8/14

81

ROW 4 - 1 Teams

12 days

23/8/14

3/9/14

90 days

30/7/14

27/10/14

82

2-B

83

ROW 1 - 1 Teams

12 days

30/7/14

10/8/14

84

ROW 2 - 1 Teams

12 days

11/8/14

22/8/14

85

ROW 3 - 1 Teams

12 days

23/8/14

3/9/14

86

ROW 4 - 1 Teams

12 days

4/9/14

15/9/14

87

ROW 5 - 1 Teams

12 days

16/9/14

27/9/14

88

ROW 6 - 1 Teams

6 days

28/9/14

3/10/14

89

STEP CHANNEL(2A to 2B)

24 days

4/10/14

27/10/14

168 days

28/10/14

28/4/15

90

2-C

91

ROW 1 - 3 Teams

24 days

28/10/14

20/11/14

92

ROW 2 - 3 Teams

24 days

21/11/14

14/12/14

93

ROW 3 - 3 Teams

24 days

15/12/14

7/1/15

94

ROW 4 - 3 Teams

24 days

8/1/15

31/1/15

95

ROW 5 - 3 Teams

24 days

1/2/15

11/3/15

96

ROW 6 - 3 Teams

24 days

12/3/15

4/4/15

97

STEP CHANNEL(2Bto 1H)

24 days

5/4/15

28/4/15

354 days

18/9/14

21/9/15

192 days

24/10/14

18/5/15

98
99

ZONE 3
3-A

100

ROW 1 - 3 Teams

24 days

24/10/14

16/11/14

101

ROW 2 - 3 Teams

24 days

17/11/14

10/12/14

102

ROW 3 - 3 Teams

24 days

11/12/14

3/1/15

103

ROW 4 - 3 Teams

24 days

4/1/15

27/1/15

104

ROW 5 - 3 Teams

24 days

28/1/15

7/3/15

105

ROW 6 - 3 Teams

24 days

8/3/15

31/3/15

106

ROW 7 - 3 Teams

24 days

1/4/15

24/4/15

107

ROW 8 - 1 Teams

12 days

25/4/15

6/5/15

108

STEP CHANNEL(3Ato 3B)

24 days

25/4/15

18/5/15

126 days

5/11/14

25/3/15

109

3-B

110

ROW 1 - 2 Teams

24 days

5/11/14

28/11/14

111

ROW 2 - 2 Teams

24 days

29/11/14

22/12/14

112

ROW 3 - 2 Teams

24 days

23/12/14

15/1/15

113

ROW 4 - 2 Teams

24 days

16/1/15

8/2/15

114

ROW 5 - 2 Teams

24 days

9/2/15

19/3/15

115

ROW 6 - 1 Teams

6 days

20/3/15

25/3/15

180 days

26/3/15

21/9/15

116

3-C

117

ROW 1 - 2 Teams

24 days

26/3/15

18/4/15

118

ROW 2 - 2 Teams

24 days

19/4/15

12/5/15

119

ROW 3 - 2 Teams

24 days

13/5/15

5/6/15

120

ROW 4 - 2 Teams

24 days

6/6/15

29/6/15

121

ROW 5 - 1 Teams

24 days

30/6/15

23/7/15

Task
Project: SHORT TERM PROGRAM
Split
Date: 20/8/13
Milestone

Summary
Project Summary
Inactive Milestone

Inactive Summary
Manual Task
Duration-only

Start-only
Finish-only
Deadline
Page 2

Progress

ID

Task Name

STEP CHANNEL(3Bo 1A)

122

Start

60 days

24/7/15

Finish
Qtr 3, 2013
Qtr 4, 2013
Qtr 1, 2014
Qtr 2, 2014
Qtr 3, 2014
Qtr 4, 2014
Qtr 1, 2015
Qtr 2, 2015
Qtr 3, 2015
Qtr 4
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
31323334353637383940414243444546474849505152 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940414243444546474849505152 1 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435363738394041
21/9/15

150 days

18/9/14

14/2/15

124

ROW 1 - 3 Teams

24 days

18/9/14

11/10/14

125

ROW 2 - 3 Teams

24 days

12/10/14

4/11/14

126

ROW 3 - 3 Teams

24 days

5/11/14

28/11/14

127

ROW 4 - 3 Teams

24 days

29/11/14

22/12/14

128

ROW 5 - 3 Teams

24 days

23/12/14

15/1/15

129

ROW 6 - 3 Teams

24 days

16/1/15

8/2/15

130

ROW 7 - 1 Teams

6 days

9/2/15

14/2/15

192 days

2/3/15

9/9/15

123

131

3-D

Duration

3-E

132

ROW 1 - 3 Teams

24 days

2/3/15

25/3/15

133

ROW 2 - 3 Teams

24 days

26/3/15

18/4/15

134

ROW 3 - 3 Teams

24 days

19/4/15

12/5/15

135

ROW 4 - 3 Teams

24 days

13/5/15

5/6/15

136

ROW 5 - 3 Teams

24 days

6/6/15

29/6/15

137

ROW 6 - 3 Teams

24 days

30/6/15

23/7/15

138

ROW 7 - 3 Teams

24 days

24/7/15

16/8/15

139

ROW 8 - 2 Teams

24 days

17/8/15

9/9/15

216 days

5/11/14

23/6/15

140

3-F

141

ROW 1 - 4 Teams

24 days

5/11/14

28/11/14

142

ROW 2 - 4 Teams

24 days

29/11/14

22/12/14

143

ROW 3 - 4 Teams

24 days

23/12/14

15/1/15

144

ROW 4 - 4 Teams

24 days

16/1/15

8/2/15

145

ROW 5 - 4 Teams

24 days

9/2/15

19/3/15

146

ROW 6 - 4 Teams

24 days

20/3/15

12/4/15

147

ROW 7 - 4 Teams

24 days

13/4/15

6/5/15

148

ROW 8 - 4 Teams

24 days

7/5/15

30/5/15

149

ROW 9 - 2 Teams

24 days

31/5/15

23/6/15

364 days

19/11/13

2/12/14

160 days

19/11/13

12/5/14

150
151

ZONE 4
4-A

152

ROW S1 - 4 Teams

24 days

19/11/13

12/12/13

153

ROW S2 - 4 Teams

24 days

13/12/13

5/1/14

154

ROW S3 - 3 Teams

24 days

6/1/14

13/2/14

155

ROW W - 4 Teams

28 days

14/2/14

13/3/14

156

ROW S4 - 4 Teams

24 days

14/3/14

6/4/14

157

ROW S5 - 2 Teams

24 days

7/4/14

30/4/14

158

ROW S6 - 1 Teams

12 days

1/5/14

12/5/14

204 days

13/5/14

2/12/14

159

4-B

160

ROW 1 - 3 Teams

24 days

13/5/14

5/6/14

161

ROW 2 - 3 Teams

24 days

6/6/14

29/6/14

162

ROW 3 - 3 Teams

24 days

30/6/14

23/7/14

163

ROW 4 - 3 Teams

24 days

24/7/14

16/8/14

164

ROW 5 - 3 Teams

24 days

17/8/14

9/9/14

165

ROW 6 - 3 Teams

24 days

10/9/14

3/10/14

166

ROW 7 - 3 Teams

24 days

4/10/14

27/10/14

167

STEP CHANNEL(4B to 3A)

36 days

28/10/14

2/12/14

Task
Project: SHORT TERM PROGRAM
Split
Date: 20/8/13
Milestone

Summary
Project Summary
Inactive Milestone

Inactive Summary
Manual Task
Duration-only

Start-only
Finish-only
Deadline
Page 3