0% found this document useful (0 votes)
21 views1 page

ZENITAKA - HYUNDAI Joint Venture: Piling Works, Jetty & Coffer Dam Works Schedule (Contractor, S Proposal)

This document outlines the proposed piling works, jetty construction, and cofferdam works schedule for a joint venture between Zenitaka and Hyundai to build a new bridge across the River Nile at Jinja, Uganda. It includes a table listing the work items, quantities, and proposed schedule from October 2014 through February 2015, including bored pile tests, integrity tests on piles, and construction of temporary structures like jetties and cofferdams needed for the project.

Uploaded by

acidrisamuel2656
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

ZENITAKA - HYUNDAI Joint Venture: Piling Works, Jetty & Coffer Dam Works Schedule (Contractor, S Proposal)

This document outlines the proposed piling works, jetty construction, and cofferdam works schedule for a joint venture between Zenitaka and Hyundai to build a new bridge across the River Nile at Jinja, Uganda. It includes a table listing the work items, quantities, and proposed schedule from October 2014 through February 2015, including bored pile tests, integrity tests on piles, and construction of temporary structures like jetties and cofferdams needed for the project.

Uploaded by

acidrisamuel2656
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ZENITAKA - HYUNDAI Joint Venture

Construction of A New Bridge Across River Nile At Jinja

Piling Works , Jetty & Coffer dam Works Schedule (Contractor,s Proposal)
No.

WorkItem

Q'ty

BoredPileTest
1 DynamicLoadTest(P22,000)

1test

2 DynamicLoadTest(A11,500)

1test

3 StaticLoadTest(P22,000)

1test

4 StaticLoadTest(A11,500)

1test

5 IntegrityTest(A1)
(Soniclogging&Impulsetest)
6 IntegrityTest(P1)
(Soniclogging&Impulsetest)
7 IntegrityTest
(Soniclogging&Impulsetest)

8nos
18nos
21nos

2014
Oct
20 31

November
10 20 30

December
10 20 31

2015
January
10 20 31

February
10 20 28