RBI - Inspection Management-Orbit Onshore
RBI - Inspection Management-Orbit Onshore
Panos Topalis
Agenda
Introduction to DNV Software
Risk Based Inspection (RBI) - ORBIT RBI Software
ORBIT+IDS (Inspection Management)
Discussion
Version
Slide 2
Prevent/reduce leaks.
Meet HSE Requirements
Maintain high availability and throughput.
Minimize shut downs.
Extending shut down intervals
Reduce Insurance Costs
Challenges
-
Old Plants
Large, complex units
Integrated Feed Systems
Many degradation mechanisms
Raw material price
Massive amount of data
Version
Slide 8
Performance
Forecasting
Frequency
Analysis
Consequence
Analysis
Impact and
Risk Analysis
/ RAM
Analysis
Asset
Integrity
Management
Software
ORBIT+IDS
MAROS
LEAK
TARO
RiskSpectrum
PHAST
PHAST Risk
Silverpipe
ORBIT RBI
AIMS Structures
RISK MANAGEMENT
Version
Slide 12
Satellite Topsides
Offshore
Topside
ORBIT+
IDS+RBI
Offshore
Structure
Sesam
Structure
Integrity
Sub sea
Version
13
Slide 13
ORBIT+ IDS
- Risk-based Inspection Management PDCA for Equipments
PLAN
Details,
Why:
Damage
Inspection
Customized Interface
PLAN
Resource Plan
Damage
(SAP-PM)
Inspection
Prepare for
the survey
Planning
&
Risk the
Evaluate
process
Assessment
Packaging
Why:
Equipment Master
Damage
Data (SAP-PM)
Standard
Interface
Implement
Facility
plans and
Databank
Risk-based
Inspection
Execution
Who:
Inspector
How:
Insp. Method
DO
Inspection Management
When: Insp. / Maint. Dates
What:
How:
Eqn. Status
Inspection
Analyse
survey
Task
results
Approval
Follow up
Action
How:
Status
What:
Finding
How:
Effectiveness
CHECK
ACT
Standard Interface
Maintenance
Work (SAP-PM)
Inspection
Finding
How:
Effectiveness
16
Customized Interface
Resource Recording
(SAP-PM)
Managers
Integrity
Engineer
Inspectors and
Contractors
IT
Support
17
RBI History
Probabilistic risk analysis techniques
- Started in the nuclear industry (1970s)
Version
Slide 23
% of Total Risk
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
% of Equipment
Version
Slide 24
Cost
reduction
Risk
Reduction
Both
Version
Slide 25
Slide 26
Slide 28
Modules
Qualitative-Screening Approach
Internal Thinning
Stress Corrosion Cracking (SCC)
External Damage
Brittle Fracture
Fatigue
High Temperature Hydrogen Attack (HTHA)
Linings
Pressure Relief Valves
Consequences with PHAST lookup tables or direct input
Inspection Planning, Optimisation, Cost Benefit Analysis and Final Approval
Version
Slide 29
Typical Reports
Version
Slide 31
Typical Reports
Risk matrices for
- Current Date
- Future prior to inspection
- Future post inspection
Executive summary with risks per equipment type and damage mechanism, risk
variation with time with / without inspection
Inspection plans showing what equipment items to inspect, for what type of
damage, when to inspect and what approach to use
Cost Benefit Analysis/ Risk benefit analysis
Equipment summary sheet
Detailed risk breakdown including business interruption, equipment damage and
personnel safety contributions
Version
Slide 32
Multi-language. Currently:
-
English
French
Chinese
Russian
Spanish (2012)
Slide 33
Preferential
corrosion
in weld HAZ
3-5 mm
603
P-8"-611D1306-(N40A)
CD
To
A601
P-14"-601-D1306-(N40A)
M601B
CD
P-2"-857-D1306-(N40A)
DR-2"-603-1306-(N40A)
OFF GAS
FROM TCOT
P-20''-600-D3106-(N40A)
601
M613
CD
DR-2"-601D1306-(N40A)
P-3"-827-D1306-(N40A)
M603
M603
RP
CD
P-6"-604D3307-(N40A)
TO P601A/BC/D
610
T602
Pitting &
LTA
P-8"-605D1306-(N22A2)
RP
R601A
P-8"-606D3102-(NA22A2)
P-12"-607-D3307-(N40A)
P-3"-625-D1306-(N40A)
P-6"-608-D3102-(N40A)
SIMPLIFIED PROCESS
FLOW DIAGRAM
FOR GPP-1 LPGU
FRONT END
DAMAGE TYPES AND
LOCATIONS OF
REPLACED PIPING/
EQUIPMENT
612
DR-1"-606-D1306-(N40A)
613
FUEL GAS
TO M116
P-14"-609D1306-(N22A2)
P-2"-829-D3307-(N40A)
To
P602
A/B
P-6"-620D1306-(N40A)
P-8"-610D1306-(N22A2)
T601B
P-6"-613-D3102-(N22A2)
Floating Production
RT601B
607
RP
605
M602B
Vessels (FPSOs)
611
P-20"-916-D1306-(N40A)
Pipelines
P-8"-612D1306-(N22A2)
P-11/2"-831D3307-(N40A)
P-6"-613-D3102-(N22A2)
R601B
RT601A
606
P-8"-603
D1306-(N22A2)
RP
604
T601A
P-14"-602
-D1306-(N22A2)
P-3"-828-D1306-(N40A)
P611A/B
LEGEND
Cracks
602
M602A
P-8"-604D1306-(N40A)
CD
M601A
Corroded line
Pitting
General corrosion >0.5 mm < CA
Preferential weld corrosion
Pre-existing weld defect
CD
P-3"-621-D1306-(N40A)
TO M109
P-2"-832-D1306-(N40A)
DR-2"-602
-D1306-(N40A)
Gouge/Scratch
Version
P-11/2"-829-D1306-(NA40A)
CD
Coating damage
RP Replaced
Slide 34
Success Stories
Dow Chemicals
- Using ORBIT in 16 sites
- User group and technical steering group
Total Petrochemicals (former Atofina)
- Selected ORBIT in competition with other RBI software
- Deployed already in 4 sites, planned for more sites
Borealis
- Deployment in 6 sites: Austria, Belgium, Germany, Sweden, Norway,
Finland
Equate, RBI implemented in Kuwait petrochemical installation
Kuwait Oil Company
- RBI and Inspection Software (ORBIT Onshore and ORBIT+IDS)
- Inspections conducted/managed for 5000 equip. & 50000 pipes
- 21 Gathering Centres and 3 Booster stations,
Version
Slide 36
Version
http://www.dnv.com/resources/publications/dnv_forum/archive/DowChemicalCo.asp
Slide 38
Dow Chemicals
Chemical company with sites / joint ventures worldwide
RBI Implementation in more than 15 sites
- Europe, US, South America, Asia
* http://www.dnv.com/resources/publications/dnv_forum/archive/DowChemicalCo.asp
Version
Slide 39
Version
Slide 42
Damage
Mechanisms
Internal
Thinning
HCl
Stress
Corrosion
Cracking
Caustic
External
Damage
Brittle
Fracture
Piping
Fatigue
HTHA
Lining
PRVs
General
HT Sulfide . Amine
CUI
& Nap. Acid SSC
HT H 2S/H 2 HIC/SOHIC Cl SCC
H2SO 4
Carbonate
Version
HF
PTA
Sour Water
ClSCC
Amine
HSC-HF
HT
Oxidation
HIC/SOHIC-HF
Slide 44
Version
Slide 46
Risk / DF
Inspection
Target
Fairly Effective
Highly Effective
Predicted Risk
Increase
Time to next
inspection
Now
Version
1st
Turnaround
Time
2nd
Turnaround
Slide 50
Version
Slide 55
Software Demonstration
ORBIT Overview
Screening or
Detailed
Analysis
Looks Like Microsoft
Outlook.
Intuitive To Use.
Online Help.
Menus Or Buttons.
Version
Slide 63
Version
Slide 64
Version
Slide 65
Version
Slide 66
Screening Analysis
NFPA
Ratings for
1600
Chemicals.
Screening Analysis is a
semi-Quantitative
Method for Rapidly
identifying high-risk
items from a large set of
Equipment Items.
Version
Slide 67
Screening Analysis
Likelihood By:
Damage
Mechanism
Method (for Long
Life Expectancy
Items) or -
Version
Slide 68
Screening Analysis
- Statistical
Method (for
Shorter Life
Items).
Results Calculated Immediately As
Likelihood rating (1 to 5)
Consequence Rating (A to E)
Overall Risk Ranking (Low to High).
Recommendat
ions Made.
Version
Slide 69
Detailed Analysis
Detailed Analysis - Comprehensive
Calculation Tool.
In General Data
Define:
Equipment Name,
Type, Location.
Service Date, Material,
Operating Conditions.
Type of Damage
Mechanism
Version
Slide 70
Detailed Analysis
Extensive
Database of
Materials.
Version
Slide 71
Consequence Analysis
In Consequence Module
Define:
Consequence Method
(PHAST-Lookup or
Direct Input),
Chemical,
Vessel Shape.
PHAST Is
DNVs Widely
Used Software
for Consequence
Modelling
Version
Slide 72
Consequence Analysis
Database of 1600
Chemicals. A subset
have lookup tables
Consequence Results
Determined:
Business Interruption Cost
Equipment Damage Cost
Safety Cost
Version
Slide 73
Consequence Analysis
Version
Slide 74
Consequence Analysis
Link
Equipment
Items Into
Inventory
Groups
Automatically
Calculated or
Manual Input
Version
Slide 75
Thinning Calculation
Localised or General
Corrosion
Thinning
Version
Slide 77
Thinning
Results Include:
Equipment Item Remaining
Life and Confidence in
Corrosion Rate (Based on
Inspections Undertaken).
Version
Slide 78
External Damage
Choice of Corrosion
Rates:
Measured,
Expert Opinion or
Calculated
Estimated or Calculated
Corrosion Rates
Version
Slide 79
SCC Modelling
In-built SCC
Causes:
Caustic
Amine
Carbonate
SSC
HIC/SOHIC
Chloride
PTA
HSC
Ammonia
Version
Calculated or
expert SCC
Susceptibilities
Results:
SCC Factor
Slide 80
SCC Modelling
Version
Slide 81
Inspections
Inspection Improves
Confidence in the
Estimated, Measured or
Calculated Corrosion Rate
or SCC Susceptibility
Version
Effectiveness Is Highly,
Fairly, Usually or Poorly DNV Templates Definitions
- Modified for Each Client
Slide 82
Other Modules
Other Modules:
Brittle Fracture
Piping Fatigue
HTHA
Liners
PRVs
Version
Slide 83
Version
Slide 84
Version
Slide 85
END