0% found this document useful (0 votes)
40 views

PMI - April 2015

The Purchasing Managers' Index (PMI) rose to 55.7 in April from 54.1 in March, exceeding the average for this year. The new orders sub-index rose the most, contributing 1.4 points to the increase. New orders and order backlogs have both risen for at least seven consecutive months. Production and employment also increased in April while supplier delivery times fell slightly. Input prices remained above 50, indicating continued price rises.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

PMI - April 2015

The Purchasing Managers' Index (PMI) rose to 55.7 in April from 54.1 in March, exceeding the average for this year. The new orders sub-index rose the most, contributing 1.4 points to the increase. New orders and order backlogs have both risen for at least seven consecutive months. Production and employment also increased in April while supplier delivery times fell slightly. Input prices remained above 50, indicating continued price rises.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Purchasing Managers Index

4 May 2015

PMI rose to 55.7 in April new orders turn higher


The PMI rose from 54.1 in March to 55.7 in April. The months result exceeds the
average for this year of 54.6, and the main index is 0.3 points higher than in April of
last year. According to a three-month moving average, the industrial sector has
begun the second quarter in stable fashion.
The sub-index for new orders rose by 4.5 points to 59.1 in April and provided the
biggest contribution, 1.4 points, to the PMI. The index for order backlogs, which covaries with new orders, rose to 54.4 in April from 51.8 in March. As a result, orders
and order backlogs have both risen for at least seven consecutive months.
The production sub-index rose to 58.5 in April from 57.6 in March, while production
plans were less optimistic. The index for planned production was 57.5 in April and
has remained in the growth zone since January 2013. At the same time as actual
and planned production rose and orders improved in April, employment increased.
In April the sub-index for employment was 53.5, up from 52.9 in the previous month.
The index for prices of suppliers commodity and intermediate goods remained
above the 50 mark for the second consecutive month, thus prices continued to rise.
The index was 51.1 in April, i.e., 1.5 points lower than in March. According to
purchasing managers, the exchange rate was again a factor leading to increasing
prices.

Inkpschefsindex
70

70

60

60

50

50

40

40

30
20

30
Ssongrensat
Orensat

07

08

20
09

10

11

12

13

14

Next publication of Purchasing Managers index: Monday 1June 2015

Jrgen Kennemar, Swedbank Macro Research, +46 (0)70-643 83 29


Sebastian Bergfelt, Silf, +46 (0)73-944 6450, [email protected]

1 (8)

15

PMI
(Purchasing
Managers Index)

Seasonally
adjusted
2015 Apr 55.7
Mar 54.1
Feb 53.3
Jan 55.2
2014 Dec 55.5
Nov 52.7
Oct 52.1
Sep 53.3
Aug 50.9
Jul 55.1
Jun 54.7
May 54.0
apr 55,4

Inkpschefsindex
avseende april mnad 2015, fortsttning

PMI-total steg frn 54,1 i mars till 55,7 i april, vilket r den hgsta nivn sedan mars
2014 d huvudindex var 56,5. Uppgngen var frmst driven av orderingngen som
bidrog med 1,4 indexenheter till PMI-total men ven vriga delindex, bortsett frn
leverantrernas leveranstider, bidrog positivt. Att huvudindex noterats i tillvxtzonen i
tv r, i kombination med mnadens goda efterfrga och produktion inger visst hopp
framver.
I april steg delindex fr orderingng med 4,5 indexenheter till 59,1. Detta var den
hgsta noteringen sedan april 2014 d delindex var 59,2. Inkpscheferna har sett
stigande orderingng i 27 mnader och genomsnittet fr denna period r 55,7. Bde
inhemsk orderingng och exportorder steg under mnaden och indexen var 56,5
respektive 54,6 i april.

Orderingng
70

70

60

60

50

50

40

40

30

30

20
10

20

Ssongrensat
Orensat

07

08

10
09

10

11

12

13

14

15

Index fr orderstockarna steg med 2,6 indexenheter frn 51,8 i mars till 54,4 i april.
Orderstockarna har stigit i sju mnader och den hgre tillvxttakten i april sammanfaller
med den starkare orderingngen.

Orderstock
60

60

50

50

40

40

30

30

20
10

20

Ssongrensat
Orensat

07

08

10
09

10

11

2 (8)

12

13

14

15

Inkpschefsindex
avseende april mnad 2015, fortsttning

Delindex fr produktion steg frn 57,6 i mars till 58,5 i april, vilket gav ett svagt positivt
bidrag p 0,2 indexenheter till PMI-total. Genomsnittet fr de tre senaste mnaderna
var dock 1,2 indexenheter lgre n fr den nrmast fregende tremnadersperioden
vars genomsnitt var 58,2.

Produktion
70

70

60

60

50

50

40

40

30

30

20
10

Ssongrensat
Orensat

07

08

20
10
09

10

11

12

13

14

15

Industrifretagens produktionsplaner fortsatte att stiga men i avtagande takt jmfrt


med i mars. Index noterades till 57,5 i april vilket var det lgsta indextalet sedan juli
2013 d index var 55,7. Enligt ett tremnaders genomsnitt dmpades optimismen
terigen jmfrt mot tremnadersperioden innan.

Planerad produktion
80

80

70

70

60

60

50

50

40

40

30

30

20
10

20

Ssongrensat
Orensat

07

08

10
09

10

11

3 (8)

12

13

14

15

Inkpschefsindex
avseende april mnad 2015, fortsttning

Delindex fr sysselsttning steg till 53,5 i april frn 52,9 i mars. I ver ett halvr har
industrifretagens personalbehov vxt vilket kan ses i ljuset av en stigande inhemsk
efterfrgan, kande produktion och ljusa produktionsplaner. Enligt ett tre-mnaders
glidande medelvrde har sysselsttningens kortsiktiga trend under senare tid varit
stabil till svagt stigande.

Sysselsttning
60

60

50

50

40

40

30
20

30

Ssongrensat
Orensat

07

08

20
09

10

11

12

13

14

15

Delindex fr leverantrernas leveranstider fll frn 52,3 i mars till 50,3 i april och
ligger med nd och nppe kvar i tillvxtzonen. Delindexet var den enda komponent
som bidrog negativt (-0,3 indexenheter) till PMI-total.

Leverantrernas leveranstider
70

70

60

60

50

50

40

40

30

30

20
10

20

Ssongrensat
Orensat

07

08

10
09

10

11

4 (8)

12

13

14

15

Inkpschefsindex
avseende april mnad 2015, fortsttning

Delindex fr lager av inkpt material sjnk tillbaka under 50-strecket efter att ha
noterats till 50,4 i mars. I april var delindexet 49,3, vilket bidrog med 0,1 indexenheter
till PMI-total. Jmfrt med april frra ret har indextalet fallit med 1,7 indexenheter.

Lager av inkpt material


60

60

55

55

50

50

45

45

40

40

35

35

30
25

30

Ssongsrensat
Orensat

07

08

25
09

10

11

12

13

14

15

Index fr leverantrernas r- och insatsvarupriser fll i april men lg fr andra mnaden


i rad i tillvxtzonen. Fr april var prisindex 51,1 vilket kan jmfras mot 52,6 i mars.
Inkpscheferna angav terigen valutafrndringar som en bidragande faktor till att
priserna stigit under mnaden.

Leverantrernas r- och insatsvarupriser


80

80

70

70

60

60

50

50

40

40

30

30

20
10

20

Ssongrensat
Orensat

07

08

Stigande priser i april


Antal mnader
Plastrvaror

10
09

10

11

12

Sjunkande priser i april


Antal mnader
Stl

5 (8)

13

14

15

Inkpschefsindex
avseende april mnad 2015, fortsttning

Silf / Swedbanks inkpschefsindex - PMI, Ssongrensat


ICI Ingr i ICI
Totalindex

Orderingng

Produk tion

Syssel- Leveranssttning
tider

Lager

vriga nyckeltal

Prognos

OrderOrderingng
ingng hemmaexport mark nad

Planerad
produk tion
nrmaste
Import
halvret

Orderstock

R/insatsvarupriser

2011 jan

61,1

63,4

64,2

57,9

64,0

52,0

61,3

61,5

59,7

76,6

57,9

70,5

feb

60,6

59,2

64,6

61,0

66,5

54,1

58,7

55,9

57,5

76,5

59,9

70,1

mar

58,0

55,3

60,9

57,9

65,4

52,1

54,1

53,2

53,7

72,7

58,8

70,9

april

59,4

60,6

61,2

57,7

64,7

54,3

57,6

56,2

56,6

74,1

58,0

70,2

maj

55,8

54,9

59,3

54,2

61,1

55,4

52,3

56,0

55,2

63,1

56,1

68,6

jun

52,5

51,9

53,5

51,1

57,4

51,5

52,3

48,5

51,0

60,7

51,7

63,9

jul

49,7

45,0

48,7

53,4

55,3

49,9

46,5

43,0

48,9

51,3

49,8

62,9

aug

48,9

47,5

49,0

50,7

49,0

51,4

48,4

42,8

48,1

47,0

48,5

55,8

sep

48,0

46,6

48,9

49,8

47,4

52,0

48,4

46,5

47,2

46,7

45,8

53,9

okt

50,2

51,2

49,0

50,7

48,0

47,6

49,3

49,7

49,2

40,2

47,0

54,4

nov

47,9

47,6

46,4

48,4

45,6

45,9

48,0

46,4

45,4

42,5

44,6

51,9

dec

49,2

47,6

49,7

49,5

49,8

48,3

49,3

45,6

46,9

42,2

46,8

59,3

2012 jan

51,3

51,7

52,6

48,2

50,7

46,8

49,5

48,8

50,4

50,3

49,9

56,0

feb

50,2

49,4

51,8

48,3

52,2

51,1

48,8

48,5

47,7

52,6

50,6

57,1

mar

49,9

50,0

48,3

49,3

49,0

43,6

49,8

48,1

48,2

55,0

48,0

56,1

apr

50,1

50,7

50,9

46,8

49,2

46,1

52,0

47,9

52,5

52,5

48,4

54,9

maj

48,9

48,9

51,0

46,1

47,2

47,9

50,9

44,6

47,1

45,9

46,6

54,2

jun

48,1

45,8

50,7

46,4

46,9

45,8

49,9

43,6

46,4

44,0

48,3

53,3

jul

50,5

51,1

53,7

47,6

47,1

48,2

52,1

47,1

48,5

38,5

52,2

55,0

aug

45,2

41,2

46,1

44,9

45,1

45,1

43,3

41,5

41,9

41,2

45,5

48,6

sep

44,5

41,9

43,6

42,7

45,2

42,9

41,2

40,1

40,3

42,2

45,3

47,8

okt

43,3

40,5

40,7

43,0

40,4

37,3

43,4

38,2

38,3

39,3

42,3

42,9

nov

43,3

40,6

43,3

38,9

44,7

42,4

42,5

40,0

40,7

43,6

44,1

47,7

dec

44,8

41,7

45,7

40,5

45,2

40,1

43,8

39,6

40,1

48,5

41,5

48,8

2013 jan

49,2

49,7

53,9

41,0

50,3

49,3

48,8

46,8

45,6

50,6

50,3

54,9

feb

51,1

51,4

55,1

45,5

50,8

48,0

52,8

47,1

49,4

48,1

48,2

57,8

mar

52,1

55,3

54,7

44,2

51,1

46,6

52,8

51,1

53,3

46,0

49,0

60,7

apr

49,5

50,7

52,7

42,7

49,9

48,9

51,7

46,5

49,3

37,5

48,8

56,1

maj

52,0

55,5

55,2

46,4

45,7

45,8

50,8

51,4

48,4

41,7

45,5

59,2

jun

53,5

58,3

56,8

47,8

47,9

48,9

53,8

55,6

55,7

42,2

50,7

60,9

jul

51,2

52,0

55,8

45,0

48,0

45,3

50,5

51,1

48,5

44,8

50,2

55,7

aug

52,4

54,7

54,2

48,3

51,4

50,1

52,2

49,3

51,0

48,6

51,7

58,6

sep

56,0

60,1

57,4

51,8

52,8

46,3

57,2

55,7

56,1

47,6

51,7

60,8

okt

52,1

52,8

55,0

47,6

52,6

48,5

52,8

50,8

55,1

47,0

50,6

58,4

nov

56,1

57,3

62,7

50,3

53,3

48,5

52,2

54,3

54,3

49,7

54,4

60,0

dec

52,2

54,4

53,5

48,2

55,0

53,1

52,3

49,9

52,2

53,3

54,2

63,2

2014 jan
feb
mar
apr
maj
jun
jul
aug
sep
okt
nov
dec
2015 jan
feb
mar
apr

56,4
54,7
56,5
55,4
54,0
54,7
55,1
50,9
53,3
52,1
52,7
55,5
55,2
53,3
54,1
55,7

62,3
58,7
60,6
59,2
55,7
57,9
57,3
51,7
53,0
52,2
53,7
56,8
56,2
52,9
54,6
59,1

57,3
57,8
59,4
60,0
57,4
55,9
59,5
50,5
59,2
52,4
55,7
58,3
60,4
55,0
57,6
58,5

49,3
48,2
51,7
48,8
51,5
52,8
51,0
49,5
50,8
50,3
51,5
53,7
50,4
51,6
52,9
53,5

55,4
54,8
53,8
52,9
51,0
52,0
51,0
50,0
49,8
53,0
52,1
54,2
53,4
52,9
52,3
50,3

47,9
52,6
49,0
51,1
49,9
49,4
48,5
46,0
49,9
46,5
53,9
50,6
48,7
45,3
50,4
49,3

60,3
55,4
58,2
56,3
56,0
57,3
55,5
50,6
53,4
52,2
54,2
51,8
56,3
48,4
52,0
54,6

56,9
55,5
56,9
57,6
53,8
54,8
54,4
50,0
48,4
52,0
52,6
54,8
54,9
51,7
54,8
56,5

58,5
56,1
56,2
55,2
51,7
55,1
52,9
50,6
49,4
52,6
54,0
54,6
54,9
53,8
51,8
54,4

50,0
50,9
47,8
44,7
48,3
49,3
50,8
50,5
50,5
48,6
50,4
49,8
44,8
43,3
52,6
51,1

55,9
56,3
51,2
56,4
55,1
54,0
54,4
50,0
51,5
55,8
52,5
53,0
55,8
50,5
53,3
53,6

66,7
64,6
64,3
65,7
60,2
61,9
60,2
61,8
62,1
58,7
63,6
64,2
60,2
65,3
60,0
57,5

6 (8)

Inkpschefsindex
avseende april mnad 2015, fortsttning

Silf / Swedbanks inkpschefsindex - PMI, icke ssongrensat


ICI Ingr i ICI

vriga nyckeltal

Syssel- Leveranssttning
tider

OrderOrderingng
ingng hemmaexport mark nad

Prognos

Totalindex

Orderingng

Produk tion

2011 jan

59,4

62,7

62,3

54,9

60,6

50,7

61,5

59,6

59,0

75,3

57,3

71,7

feb

61,5

62,2

65,0

60,3

65,0

53,7

61,6

57,4

60,5

76,0

60,3

72,8

mar

59,6

58,6

63,9

57,6

65,0

53,1

56,9

55,1

56,8

74,0

60,8

73,0

apr

61,7

64,3

64,0

58,9

65,8

55,4

60,3

59,0

59,6

78,1

59,9

72,8

maj

57,7

57,3

62,3

56,1

62,9

57,5

54,0

58,4

57,8

66,0

57,8

69,4

jun

55,6

56,1

58,1

54,1

59,9

54,8

55,8

52,4

53,7

61,8

54,0

63,1

jul

45,8

39,0

39,0

53,5

56,9

52,0

43,1

38,1

47,5

50,5

46,0

62,4

aug

51,7

51,3

54,4

51,7

50,7

52,4

50,7

46,6

53,0

47,7

50,7

57,8

sep

49,4

46,8

51,6

51,3

49,4

51,6

48,1

48,1

46,5

48,4

47,1

52,5

okt

48,9

48,1

47,1

50,0

48,1

45,1

46,2

47,7

44,9

38,5

45,2

50,3

nov

45,2

42,6

42,9

47,4

43,5

43,4

43,8

42,9

39,6

39,0

42,6

48,4

dec

44,8

41,2

42,8

46,7

46,0

44,8

44,2

39,9

40,4

37,0

43,4

57,7

2012 jan

49,6

51,0

50,7

45,2

47,3

45,5

49,7

46,9

49,7

49,0

49,3

57,2

feb

51,1

52,4

53,1

47,6

50,7

50,7

51,7

50,0

50,7

52,5

51,0

59,8

mar

51,5

53,3

51,3

49,0

49,0

44,6

52,6

50,0

51,3

56,3

50,0

58,6

apr

52,4

54,4

54,7

48,0

50,3

47,2

54,7

50,7

55,5

56,5

50,3

57,5

maj

50,8

51,3

54,0

48,0

49,0

50,0

52,6

47,0

50,0

49,0

48,3

55,0

jun

51,2

50,0

55,3

49,4

49,4

49,1

53,4

47,5

49,1

45,1

50,6

52,5

jul

46,6

45,8

44,2

47,7

48,7

50,3

48,7

42,2

47,1

37,0

48,4

54,5

aug

48,0

45,0

51,5

45,9

46,8

46,1

45,6

45,3

46,8

41,9

47,7

50,6

sep

45,9

42,1

46,3

44,2

47,2

42,5

40,9

41,7

39,6

43,9

46,6

46,4

okt

42,0

37,4

38,0

42,3

40,5

34,0

40,0

36,0

34,0

37,6

40,5

38,0

nov

40,6

35,6

39,0

37,9

42,6

39,9

38,0

36,5

34,9

40,1

42,1

44,2

dec

40,4

35,0

38,8

37,7

41,5

36,0

38,8

33,9

33,6

44,1

38,0

47,2

2013 jan

47,5

49,0

52,0

38,0

47,0

48,0

49,0

44,9

45,0

49,3

49,7

56,1

feb

52,0

54,4

56,4

44,8

49,3

47,6

55,8

48,6

52,4

48,0

48,6

60,5

mar

53,7

58,7

57,7

43,9

51,0

47,6

55,7

53,0

56,4

47,3

51,0

63,2

apr

51,9

54,4

56,4

44,0

51,0

50,0

54,4

49,3

52,4

41,5

50,7

58,7

maj

54,0

57,9

58,3

48,3

47,6

47,9

52,4

53,8

51,0

44,8

47,2

60,0

jun
jul
aug
sep
okt
nov
dec

56,6
47,3
55,2
57,4
50,8
53,4
47,8

62,5

61,4

50,7

50,4

52,2

57,4

59,6

58,5

43,3

52,9

60,1

46,7
58,6
60,2
49,6
52,3
48,0

46,4
59,6
60,1
53,1
59,2
46,5

45,1
49,3
53,3
46,9
49,2
45,3

49,6
53,1
54,8
52,7
51,2

47,1
54,5
56,9
49,6
48,0
47,3

45,2
51,1
57,4
48,8
50,8

48,8

46,3
53,8
52,9
48,8
52,4
50,8

55,2
60,6
59,5
54,3
56,5

44,1

47,2
55,9
55,4
50,8
48,5
45,7

44,0
49,3
49,3
45,3
46,2

51,2

47,4
51,1
45,9
46,0
46,0
49,6

2014 jan
feb
mar
apr
maj
jun
jul
aug
sep
okt
nov
dec
2015 jan
feb
mar
apr

54,7
55,6
58,1
57,7
56,0
57,8
51,2
53,7
54,7
50,8
50,1
51,0
53,5
54,2
55,7
58,0

61,6
61,7
63,9
62,9
58,1
62,1
52,0
55,5
53,1
49,1
48,6
50,5
55,5
55,9
57,9
62,7

55,4
59,2
62,4
63,8
60,5
60,5
50,0
55,8
61,9
50,5
52,2
51,4
58,5
56,3
60,5
62,3

46,3
47,5
51,4
50,0
53,4
55,8
51,1
50,4
52,3
49,6
50,4
50,9
47,4
50,9
52,6
54,7

52,1
53,3
53,7
53,9
52,9
54,5
52,6
51,7
51,8
53,2
50,0
50,5
50,0
51,4
52,2
51,4

46,6
52,2
50,0
52,2
51,9
52,7
50,5
47,0
49,5
44,0
51,4
47,1
47,4
45,0
51,4
50,5

60,5
58,3
61,0
59,1
57,7
60,9
52,0
52,9
53,1
49,1
50,0
46,8
56,5
51,4
54,8
57,3

55,0
57,0
58,8
60,4
56,2
58,7
49,5
53,8
50,0
50,0
49,1
49,1
53,0
53,2
56,7
59,3

57,9
59,1
59,3
58,3
54,4
57,8
51,5
55,5
48,7
48,2
48,2
48,1
54,3
56,8
54,9
57,5

48,8
50,8
49,1
48,7
51,4
50,4
50,0
51,3
52,2
46,9
46,8
45,3
43,6
43,2
53,9
55,0

55,3
56,7
53,2
58,3
56,8
56,3
50,5
52,2
52,8
54,0
50,4
49,5
55,2
50,9
55,3
55,6

67,9
67,4
66,8
68,3
61,0
61,1
59,7
63,9
60,7
54,5
60,1
62,6
61,4
68,0
62,5
60,2

Lager

7 (8)

Order- R-/insatsstock
varupriser

Planerad
produk tion
nrmaste
Import
halvret

61,6

Inkpschefsindex
avseende april mnad 2015, fortsttning

Silf / Swedbanks Inkpschefsindex (PMI)


ml och metodik
Historik

Silf (tidigare I&L) och Swedbank AB, publ, (dvarande Sparbanken Sverige) gr den frsta gemensamma interna
berkningen av Inkpschefsindex fr de fem ingende komponenterna i december 1994. Exakt ett r senare offentliggjordes indextalet fr frsta gngen. Frebild fr dvarande
ICI (numera PMI, Purchasing Managers Index) var NAPMindex en av USA:s viktigaste och mest knda konjunkturindikatorer. NAPM-index har funnits sedan 1931 och har
under tiden dpts om till PMI (eller ISM-index).

Deltagare

Omkring 200 inkpschefer i tillverkningsindustrin.

Publicering

Frsta vardagen i varje mnad, kl 08:30.

Underskningsperiod

Jmfrelse med fregende mnad.

Sammansttning
av PMI (%)

Orderingng (i det egna fretaget)


Produktion (i det egna fretaget)
Sysselsttning (i det egna fretaget)
Leverantrernas leveranstider
Lager (inkpt material)

vriga nyckeltal
(ingr ej i PMI)

Orderingng export
Orderingng hemma
Orderstock
Leverantrernas r- och insatsvarupriser
Import
Planerad produktion nrmaste halvret

Ml

Snabb konjunkturindikator
Enkel statistik och ltt tolkning
Statistik med relativt korta publiceringsintervaller
Stndig kontakt med vlinformerad yrkesgrupp

Berkning

Enligt s k diffusionsindex. Positiva frndringar tas fram i procent fr de fem delindexarna. Till detta tal adderas den procentuella andelen ofrndrade svar multiplicerat med 0,5.
Sedan viktas de olika delindexarna enligt ovan fr att komma
fram till totalindex. Inkpschefsindex anger inga aktivitetsniver utan mnadsvisa frndringar av industrikonjunkturen.
De ssongrensade siffrorna redovisas i frsta hand.

Break even

Skiljelinjen mellan upp- och nedgng i industrikonjunkturen


har i linje med amerikansk praxis faststllts till 50. Ngon
verdriven exakt tillmpning av denna grns eller neutral tillvxtzon br dock inte gras. 49,7 eller 50,3 ger inte srskilt
olikartade konjunktursignaler utifrn PMI-totalindex.

30
25
20
15
10

Vid framtagningen och analysen av Inkpschefsindex (ICI/PMI) tror vi oss ha anvnt tillfrlitliga kllor och
bearbetningsrutiner. Swedbank AB (publ) och Silf kan dock inte garantera analysernas riktighet eller
fullstndighet och kan inte ansvara fr eventuell felaktighet eller brist i grundmaterialet eller bearbetningen
drav. Lsarna uppmanas att basera eventuella beslut ven p annat underlag.
Varken Swedbank, Silf eller dess anstllda eller andra medarbetare skall kunna gras ansvariga fr frlust
eller skada, direkt eller indirekt, p grund av eventuella fel eller brister i analyser som redovisas i
Inkpschefsindex.
8 (8)

You might also like