Request For Inspection: Kgoc Agoc

This document is a request for inspection from Al-Jalhami Cont. Est. to KGOC for a preliminary inspection of the fresh water tank TK-103D. It provides details of the contract number, discipline, requested inspection date and time, enclosures including a checklist and related drawings, and spaces for signatures and remarks from the contractor, KJO project representative, and KJO OIS.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views

Request For Inspection: Kgoc Agoc

This document is a request for inspection from Al-Jalhami Cont. Est. to KGOC for a preliminary inspection of the fresh water tank TK-103D. It provides details of the contract number, discipline, requested inspection date and time, enclosures including a checklist and related drawings, and spaces for signatures and remarks from the contractor, KJO project representative, and KJO OIS.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

KGOC

AGOC

KGOC
Customer :

KJO (AGOC/KGOC)

Contractor :

Discipline :
Civil

AGOC

Request for Inspection

Al-Jalhami

Contract No.: HT003SS11

X Mechanical

Electrical

Submitted by Contractor
Received by (PMT)
Confirmed by (OIS)
Work Permit Required

Instrumentation

: AL-JALHAMI CONT. EST.


:
:
Yes

No

Others

Request No.: RFI- 01

Datte:
Date:
Date:

Project Quality Plan:

Request for Inspection of:

30.10.2014

Time::10.00AM
Time:
Time:

Hold Point

Witness Point

Enclosures:

PRILIMINARY INSPECTION FOR THE TANK


1- Check List:
2- Related Drawings

LOCATION:FRESH WATER TANK

Spec. Ref.:

TK -103 D

Drawing #:

AS PER APPROVED PROCEDURE

Planned date for Work Execution


30/10/2014

S.

Actual date of Execution

AT 10.00AM

Check List (Specify)

Contractor

Verified by:
KJO Inspector

Status

Verified by:
Al-Jalhami

Remarks:

Acceptance Does Not Relieve The Contractor From His Reponsibility & Liability Concerning Compliance With Contract Requirement

Contractor
Name:

KJO Project Representative


Name: Mr.SAEED AL MARI

KJO OIS
Name: Mr.ALI AL MUTHERI

Signature:

Signature:

Signature: