0% found this document useful (0 votes)
44 views1 page

Lab Problems

The document lists maintenance issues across several engineering laboratories. The Engineering Practice Laboratory needs the window corner glass replaced and the wooden cupboard door repaired. The Thermal Laboratory-1 requires trench closing, engine bed painting, computerized engine exhaust piping installation, and diesel engine dynamometer water leakage fixing. The CNC Lab needs trench closing. The SOM Lab requires a new single phase switch box. The MT-1 Lab needs wall painting and new lathe belts. The FM Lab has a broken Verturi meter switch box and needs new form fittings and the front door repair.

Uploaded by

venkatkavin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views1 page

Lab Problems

The document lists maintenance issues across several engineering laboratories. The Engineering Practice Laboratory needs the window corner glass replaced and the wooden cupboard door repaired. The Thermal Laboratory-1 requires trench closing, engine bed painting, computerized engine exhaust piping installation, and diesel engine dynamometer water leakage fixing. The CNC Lab needs trench closing. The SOM Lab requires a new single phase switch box. The MT-1 Lab needs wall painting and new lathe belts. The FM Lab has a broken Verturi meter switch box and needs new form fittings and the front door repair.

Uploaded by

venkatkavin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ENGINEERING PRACTICE LABORATORY

Window corner side broken glass not changed


Wooden cupboard door damage below work table)
Welding booth exhaust facility available

THERMAL LABORATORY -1

Trench closing, building side window rain water coming


All engines beds painting work
Computerized ic engine exhaust pipe line to out side
Hydraulic load diesel engine exhaust pipe line to out side
Morse test engine cylinder bore, piston change new
Computerized ic engine switch box need for computer
Lab entrance door need
Hydraulic load diesel engine dynamometer water leakage
Electrical loading petrol engine need exhaust facility, petrol tank, loading
devices

CNC LAB

Trench closing

SOM LAB
Single phase switch box need for utm machine old lab) (permanent)near by
machine

MT-1 LAB
Wall painting work
Lathe belt 2 nos

FM LAB
Verturi meter switch box broken
Form fitting 2 nos(new lab)
Front door above opening so if closed work

You might also like