0% found this document useful (0 votes)
45 views5 pages

Whats New in Renewables 3

85-99% of water treatment plant electric consumption goes to raw water & well pumps, high service pumps, filter backwash pumps, distribution booster pumps

Uploaded by

cesardako
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views5 pages

Whats New in Renewables 3

85-99% of water treatment plant electric consumption goes to raw water & well pumps, high service pumps, filter backwash pumps, distribution booster pumps

Uploaded by

cesardako
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Proprietary & Confidential

Rentricity
Overview

www.rentricity.com

160 Varick St. New York, NY 10013


1

2010 RENTRICITY INC. ALL RIGHTS RESERVED STRICTLY CONFIDENTIAL PERMISSION REQUIRED FOR DISTRIBUTION

Proprietary & Confidential

Rentricity Provides Clean Energy Recovery for the


Potable, Waste and Industrial Water Industries

Water Company Services


Energy Recovery & Monitoring using Flowto-Wire Systems

Benefits
Offset Electricity Rate
Increases

Corporate Responsibility

Revenue Generation

Security & Monitoring

Public Goodwill

Operational Efficiency

Reduced Carbon Footprint

2010 RENTRICITY INC. ALL RIGHTS RESERVED STRICTLY CONFIDENTIAL PERMISSION REQUIRED FOR DISTRIBUTION

Proprietary & Confidential

Water - Energy Connection


Drinking water and
wastewater consume:
- 3% of domestic electricity
- 7% of worldwide electricity
- 19% of California electricity
Water utility energy use varies
from 0.25 to 3.5 kWh per
1,000 gallons of drinking water
produced & delivered
85-99% of water treatment
plant electric consumption
goes to raw water & well
pumps, high service pumps,
filter backwash pumps,
distribution booster pumps
Source: American Water Presentation Institute of Public Utilities Conference 12/11/08

2010 RENTRICITY INC. ALL RIGHTS RESERVED STRICTLY CONFIDENTIAL PERMISSION REQUIRED FOR DISTRIBUTION

Proprietary & Confidential

Pipes ~ Pressure ~ Power

2010 RENTRICITY INC. ALL RIGHTS RESERVED STRICTLY CONFIDENTIAL PERMISSION REQUIRED FOR DISTRIBUTION

Proprietary & Confidential

3 Potable Water Application Targets


Wastewater & Industrial in Planning Stages
2 MGD

9 MGD

45 PSI

Urban Site - 50 kW

40 PSI

Mandated Release - 100 kW


25

25 MGD

MGD

12 feet

35 PSI

Transfer Station - 200 kW

Industrial/Wastewater 40 kW
5

2010 RENTRICITY INC. ALL RIGHTS RESERVED STRICTLY CONFIDENTIAL PERMISSION REQUIRED FOR DISTRIBUTION

Proprietary & Confidential

Rentricity Model for Drinking Water,


Wastewater & Industrial Water Systems

2010 RENTRICITY INC. ALL RIGHTS RESERVED STRICTLY CONFIDENTIAL PERMISSION REQUIRED FOR DISTRIBUTION

Proprietary & Confidential

Proven Components, Uniquely Configured


Flow-to-Wiresm Components

Turbine-Generator
Interconnection Package
Pressure Reduction
Valve
Integrated Sensors
80%+ Standardized
Lifespan Up to 40 Years
Rentricity patents are under development
7

2010 RENTRICITY INC. ALL RIGHTS RESERVED STRICTLY CONFIDENTIAL PERMISSION REQUIRED FOR DISTRIBUTION

Proprietary & Confidential

Demonstration Installation
AFTER

BEFORE
C t lB
Control
Boxes att Grade
G d Level
L
l
Meter

2010 RENTRICITY INC. ALL RIGHTS RESERVED STRICTLY CONFIDENTIAL PERMISSION REQUIRED FOR DISTRIBUTION

Proprietary & Confidential

Current 2009 Development Projects

California
New England
California Water
225 kW
50 kW
225 kW
PSV Station
PRV
Transfer

Pennsylvania
30 kW
Release
9

2010 RENTRICITY INC. ALL RIGHTS RESERVED STRICTLY CONFIDENTIAL PERMISSION REQUIRED FOR DISTRIBUTION

Contact Information
P: 617.733.9703

Allie Corless

2009 RENTRICITY INC. ALL RIGHTS RESERVED STRICTLY CONFIDENTIAL PERMISSION REQUIRED FOR DISTRIBUTION

[email protected]
10

You might also like