Time Schedule: Peningkatan Kawasan Jalan Maritam

The document provides cost and scheduling information for various divisions of work on road improvement projects. It includes tables with descriptions of work, quantities, unit prices, and totals for different divisions. It also includes a Gantt chart schedule showing the planned timeline and progress of work across six months.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Time Schedule: Peningkatan Kawasan Jalan Maritam

The document provides cost and scheduling information for various divisions of work on road improvement projects. It includes tables with descriptions of work, quantities, unit prices, and totals for different divisions. It also includes a Gantt chart schedule showing the planned timeline and progress of work across six months.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 31

NO.

Uraian Pekerjaan

I
DIVISI 1 . UMUM
1.2 Mobilisasi

Jumlah
Harga
( Rp.)

Bobot.

39,263,500.00

2.38

7,970,484.30

0.48

2.2a Pasangan Batu Dengan Portal ( Manual )

81,994,975.80

4.97

III DIVISI III - PEKERJAAN TANAH


3.1.1 Galian Tanah Biasa

53,043,690.31

3.22

4,451,205.05

0.27

467,375,648.03

28.33

54,938,886.08

3.33

824,327,157.63

49.97

II DIVISI II - DRAINASE
2.10 Galian Drainase dan Saluran Air

3.2.1 Timbunan Tanah Biasa


V DIVISI V PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Atas A
VI DIVISI VI PERKERASAN ASPAL
6.1.1 Lapis Resap Pengikat
6.3.7 Laston Asphalt Concret Base ( AC- Base)
VII

DIVISI VII STRUKTUR

BULAN I

0.79

0.79

0.121

0.121

0.402

0.402

7.1.7 Cor Beton K 250 u/Slab Beton

8,761,918.43

0.53

7.1.8 Cor Beton K175 u/Sloof Beton

72,486,839.10

4.39

7.3.1 Baja Tulangan U - 24 Polos u/, Slab Beton

13,361,722.61

0.81

7.9a Pasangan Batu Manual u/ Slab Beton

13,566,212.36

0.82

8,168,142.29

0.50

7.10.1 Pasangan Batu Kosong yang diisi adukan


JUMLAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN

RENCANA
REALISASI
DEVIASI

1,649,710,381.98
164,971,038.20
1,814,681,420.18
1,814,681,000.00

(%)
(%)
(%)
(%)
(+)
(-)

100.00

0.79
0.79
0.50
0.50

0.79
1.59
0.60
1.10

0.52
2.11
0.70
1.80

0.52
2.63
1.12
2.92

-0.29

-0.49

-0.31

0.29

TIME SCHEDULE
PENINGKATAN KAWASAN JALAN MARITAM

BULAN II

0.121

0.121

1.66

1.66

1.66

0.402

0.40

0.40

BULAN III

0.40
0.09

0.40
0.09

BULAN IV

BULA

0.40
0.09

3.54

3.54

3.54

3.54

3.54

3.54

3.54

3.54

0.42

0.42

0.42

6.25

6.25

6.25

2.18
4.81

2.18
6.99

2.06
9.05

0.27

0.27

1.46

1.46

1.46

0.27

0.27

0.27

2.23
11.28

2.49
13.77

0.21

0.21

0.21

0.17

0.17

0.17

6.40
20.17

3.91
24.08

3.91
28.00

0.21

3.75
31.74

3.54
35.28

3.54
38.83

10.20
49.03

10.20
59.23

6.66
65.90

100

BULAN V

BULAN VI
90

0.79
80

70

60

50

40

0.42

0.42

0.42

0.42

0.42

6.25

6.25

6.25

30

6.25

6.25
20

30

20

10

6.66
72.56

6.66
79.22

6.66
85.88

6.66
92.54

6.66
99.21

0.79
100.00

TIME SCHEDULE
PENINGKATAN JALAN LUAR KOTA 4 T.A 2014

NO.

Uraian Pekerjaan

Jumlah
Harga
( Rp.)

Bobot.

BULAN I

BULAN II BULAN III BULAN IV

DIVISI 1. UMUM

1.2 Mobilisasi

37,500,000.00

0.38

262,937,606.37

0.00
2.64

0.220

0.22

0.22

1,491,933,833.49

14.99

1.25

1.25

1.25

318,807,431.99

3.20

0.267

0.27

0.27

20,482,200.00

0.21

0.02

0.02

0.02

3.1 Galian Biasa

14,061,741.89

0.14

0.01

0.01

0.01

3.2 Galian Perkerasan Beraspal tanpa Cold Milling Machine

19,009,131.18

0.19

361,014,097.01

3.63

47,660,898.08

0.48

II

DIVISI 2. DRAINASE

2.1

Galian untuk Saluran Dan Drainase

2.2

Pasangan Batu dengan Mortar

2.3

Pasangan Batu tanpa Mortar (Aanstamping)

2.4

Pipa resapan 3/4"

III

DIVISI 3. PEKERJAAN TANAH

3.3 Timbunan Pilihan


3.4 Penyiapan Badan Jalan

0.363

0.36

0.363

IV

DIVISI 5. PERKERASAN BERBUTIR

4.1 Semen untuk Lapis Pondasi Semen Tanah

1,729,260,828.04

17.37

1.09

1.09

1.09

4.2 Lapis Pondasi Tanah Semen

1,635,412,964.36

16.43

1.03

1.03

1.03

382,412,727.92

3.84

5.2 Laston Lapis Pondasi (AC-Base) (kasar)

1,225,183,409.28

12.31

5.3 Aspal Minyak

1,876,694,400.00

18.85

9,354,240.00

0.09

DEVISI VI - PEKERJAAN ASPAL

5.1 Lapis Perekat - Aspal Cair

5.4 Aditif anti pengelupasan

0.00

0.00

Bahan Pengisi (Filler) Tambahan


VI

0.00

DIVISI 7. STRUKTUR

6.1 Beton mutu sedang (K-250)

165,679,726.30

1.66

6.2 Beton mutu sedang (K-250) Patching

81,010,349.22

0.81
0.00

6.3 Beton mutu rendah (K-175)

57,696,362.55

0.58

0.07

0.07

6.4 Baja Tulangan BJ 24 polos

209,443,279.18

2.10
0.00

0.26

0.26

6.5 Pondasi Cerucuk Pengadaan dan Pemancangan

8,634,999.99

0.09

0.01

0.01

6.6 Pembongkaran Jembatan Lama

1,750,000.00

0.02
0.00

JUMLAH
PPN 10%
JUMLAH TOTAL

9,955,940,226.84
995,594,022.68
10,951,534,249.53

100.00

0.21

0.21
0.00

DIBULATKAN

RENCANA
REALISASI
DEVIASI

10,951,534,000.00

(%)
(%)
(%)
(%)
(+)
(-)

2.68
10.75
13.90
13.90
3.15

4.79
29.92

4.24
46.88

2.11
55.33

SCHEDULE

LAN LUAR KOTA 4 T.A 2014

BULAN V BULAN VI

100

0.13

90

80

0.05

70

60

60

1.09
1.03
50

0.48
0.00

0.48

1.54

1.54

2.36

2.36

0.01

0.01

40

30

0.20
20

10

6.50
81.32

4.76
100.00

NO.

Uraian Pekerjaan

I
DIVISI 1. UMUM
1.2 Mobilisasi

Jumlah
Harga
( Rp.)

Bobot.

BULAN I

37,500,000.00

0.38

0.13

0.13

262,937,606.37

0.00
2.64

0.22

0.22

0.220

0.220

1,491,933,833.49

14.99

1.25

1.25

1.25

1.25

318,807,431.99
20,482,200.00

3.20
0.21

0.27
0.02

0.27
0.02

0.267
0.02

0.267
0.02

III DIVISI 3. PEKERJAAN TANAH


3.1 Galian Biasa

14,061,741.89

0.14

0.01

0.01

0.01

0.01

3.2 Galian Perkerasan Beraspal tanpa Cold Milling Machine

19,009,131.18

0.19

361,014,097.01
47,660,898.08

3.63
0.48

0.363

0.363

IV DIVISI 5. PERKERASAN BERBUTIR


4.1 Semen untuk Lapis Pondasi Semen Tanah
4.2 Lapis Pondasi Tanah Semen

1,729,260,828.04
1,635,412,964.36

17.37
16.43

V
5.1
5.2
5.3
5.4

382,412,727.92
1,225,183,409.28
1,876,694,400.00
9,354,240.00

3.84
12.31
18.85
0.09

165,679,726.30

1.66

6.2 Beton mutu sedang (K-250) Patching

81,010,349.22

0.81
0.00

6.3 Beton mutu rendah (K-175)

57,696,362.55

0.58

II DIVISI 2. DRAINASE
2.1 Galian untuk Saluran Dan Drainase
2.2

Pasangan Batu dengan Mortar

2.3
2.4

Pasangan Batu tanpa Mortar (Aanstamping)


Pipa resapan 3/4"

3.3 Timbunan Pilihan


3.4 Penyiapan Badan Jalan

DEVISI VI - PEKERJAAN ASPAL


Lapis Perekat - Aspal Cair
Laston Lapis Pondasi (AC-Base) (kasar)
Aspal Minyak
Aditif
pengelupasan
Bahananti
Pengisi
(Filler) Tambahan

VI DIVISI 7. STRUKTUR
6.1 Beton mutu sedang (K-250)

0.239

0.239

0.21

0.21

0.21

0.21

0.07

0.07

0.07

0.07

6.4 Baja Tulangan BJ 24 polos


6.5 Pondasi Cerucuk Pengadaan dan Pemancangan
6.6 Pembongkaran Jembatan Lama
JUMLAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN

RENCANA
REALISASI
DEVIASI

209,443,279.18

2.10
0.00

0.26

0.26

0.26

0.26

8,634,999.99

0.09

0.01

0.01

0.01

0.01

0.02
0.00
100.00

0.02

2.70
2.70
1.70
1.70

2.68
5.39
1.90
3.60

2.68
8.07
2.50
6.10

2.68
10.75
3.50
9.60

-1.00

-1.79

-1.97

-1.15

1,750,000.00
9,955,940,226.84
995,594,022.68
10,951,534,249.53
10,951,534,000.00

(%)
(%)
(%)
(%)
(+)
(-)

TIME SCHEDULE
PENINGKATAN JALAN DALAM KOTA 2 T.A 2013
BULAN II

BULAN III

BULAN IV

0.220

0.220

0.22

0.22

0.22

0.22

0.22

0.22

1.25

1.249

1.25

1.25

1.25

1.25

1.25

1.25

0.267
0.02

0.267
0.02

0.27
0.02

0.27
0.02

0.27
0.02

0.27
0.02

0.27
0.02

0.27
0.02

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.363

0.36

0.36

0.363

0.363

1.09
1.03

1.09
1.03

1.09
1.03

1.09
1.03

1.09
1.03

0.36

1.09
1.03

0.36

1.09
1.03

0.36

1.09
1.03

1.09
1.03

1.09
1.03

1.09
1.03

1.09
1.03

0.00

0.00

0.21
0.07

0.21
0.07

0.21
0.07

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.21
0.07

0.00

0.26

0.26

0.26

0.26

0.01

0.01

0.01

0.01

4.79
15.54
4.60
14.20

4.79
20.34
4.88
19.08

4.79
25.13
4.80
23.88

4.79
29.92
4.67
28.55

4.24
34.16
4.77
33.32

4.24
38.40
4.62
37.94

4.24
42.64
4.60
42.54

-1.34

-1.26

-1.25

-1.37

-0.84

-0.46

-0.10

4.24
46.88
4.65
47.19
0.31

2.11
48.99

2.11
51.11

2.11
53.22

2.11
55.33

BULAN V

BULAN VI

0.13

100

90

80

70

0.05

0.05

0.05

0.05
60

1.09
1.03

1.09
1.03

1.09
1.03

1.09
1.03

0.48
0.00
1.54
2.36
0.01

0.48
0.00
1.54
2.36
0.01

0.48
0.00
1.54
2.36
0.01

0.48
0.00
1.54
2.36
0.01

50

0.48
0.00
1.54
2.36
0.01

0.48
0.00
1.54
2.36
0.01

0.48
0.00
1.54
2.36
0.01

0.48
1.54
2.36
0.01

40

30

20

0.20

0.20

0.20

0.20
10

20

10

6.50
61.83

6.50
68.33

6.50
74.83

6.50
81.32

4.64
85.96

4.64
90.60

4.64
95.24

4.76
100.00

TIME SCHEDULE
PENINGKATAN KAWASAN JALAN MARITAM

NO.

Uraian Pekerjaan

I DIVISI 1 . UMUM
1.2 Mobilisasi

Jumlah
Harga
( Rp.)

Bobot.

39,263,500.00

2.38

7,970,484.30

0.48

2.2a Pasangan Batu Dengan Portal ( Manual )

81,994,975.80

4.97

III DIVISI III - PEKERJAAN TANAH


3.1.1 Galian Tanah Biasa

53,043,690.31

3.22

4,451,205.05

0.27

II DIVISI II - DRAINASE
2.10 Galian Drainase dan Saluran Air

3.2.1 Timbunan Tanah Biasa


V

DIVISI V PERKERASAN BERBUTIR

BULAN I

BULAN II BULAN III

0.121

0.402

0.40
0.09

5.1.1 Lapis Pondasi Atas A

467,375,648.03

28.33

54,938,886.08

3.33

824,327,157.63

49.97

VII DIVISI VII STRUKTUR


7.1.7 Cor Beton K 250 u/Slab Beton

8,761,918.43

0.53

7.1.8 Cor Beton K175 u/Sloof Beton

72,486,839.10

4.39

1.46

7.3.1 Baja Tulangan U - 24 Polos u/, Slab Beton

13,361,722.61

0.81

0.27

7.9a Pasangan Batu Manual u/ Slab Beton

13,566,212.36

0.82

0.21

8,168,142.29

0.50

0.17

VI

3.54

DIVISI VI PERKERASAN ASPAL

6.1.1 Lapis Resap Pengikat


6.3.7 Laston Asphalt Concret Base ( AC- Base)

7.10.1 Pasangan Batu Kosong yang diisi adukan


JUMLAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN
RENCANA
REALISASI
DEVIASI

1,649,710,381.98 100.00
164,971,038.20
1,814,681,420.18
1,814,681,000.00
(%)
(%)
(%)
(%)
(+)

0.52
2.63
1.12
2.92
0.29

2.23
11.28
1.82
10.14

3.91
28.00
4.06
14.20

DEVIASI

(-)

-1.14

-13.80

SCHEDULE

WASAN JALAN MARITAM

BULAN IV BULAN V BULAN VI

100

0.79
90

80

70

60

50

3.54

50

0.42

0.42

6.25

6.25

40

30

20

10

10.20
49.03

6.66
0.79
79.22 100.00

NO.

Uraian Pekerjaan

I
DIVISI 1 . UMUM
1.2 Mobilisasi

Jumlah
Harga
( Rp.)

Bobot.

39,263,500.00

2.38

7,970,484.30

0.48

2.2a Pasangan Batu Dengan Portal ( Manual )

81,994,975.80

4.97

III DIVISI III - PEKERJAAN TANAH


3.1.1 Galian Tanah Biasa

53,043,690.31

3.22

4,451,205.05

0.27

467,375,648.03

28.33

54,938,886.08

3.33

824,327,157.63

49.97

II DIVISI II - DRAINASE
2.10 Galian Drainase dan Saluran Air

3.2.1 Timbunan Tanah Biasa


V DIVISI V PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Atas A
VI DIVISI VI PERKERASAN ASPAL
6.1.1 Lapis Resap Pengikat
6.3.7 Laston Asphalt Concret Base ( AC- Base)
VII

DIVISI VII STRUKTUR

BULAN I

0.79

0.79

0.121

0.121

0.402

0.402

7.1.7 Cor Beton K 250 u/Slab Beton

8,761,918.43

0.53

7.1.8 Cor Beton K175 u/Sloof Beton

72,486,839.10

4.39

7.3.1 Baja Tulangan U - 24 Polos u/, Slab Beton

13,361,722.61

0.81

7.9a Pasangan Batu Manual u/ Slab Beton

13,566,212.36

0.82

8,168,142.29

0.50

7.10.1 Pasangan Batu Kosong yang diisi adukan


JUMLAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN

RENCANA
REALISASI
DEVIASI

1,649,710,381.98
164,971,038.20
1,814,681,420.18
1,814,681,000.00

(%)
(%)
(%)
(%)
(+)
(-)

100.00

0.79
0.79
0.10

0.79
1.59

0.52
2.11

0.52
2.63

-0.79

-1.59

-2.11

-2.63

TIME SCHEDULE
PENINGKATAN KAWASAN JALAN MARITAM

BULAN II

0.121

0.121

1.66

1.66

1.66

0.402

0.40

0.40

BULAN III

0.40
0.09

0.40
0.09

BULAN IV

BULA

0.40
0.09

3.54

3.54

3.54

3.54

3.54

3.54

3.54

3.54

0.42

0.42

0.42

6.25

6.25

6.25

0.27

0.27

1.46

1.46

1.46

0.27

0.27

0.27
0.21

0.21

0.21

0.17

0.17

0.17

0.21

2.18
4.81

2.18
6.99

2.06
9.05

2.23
11.28

2.49
13.77

6.40
20.17

3.91
24.08

3.91
28.00

3.75
31.74

3.54
35.28

3.54
38.83

10.20
49.03

-4.81

-6.99

-9.05

-11.28

-13.77

-20.17

-24.08

-28.00

-31.74

-35.28

-38.83

-49.03

10.20
59.23

6.66
65.90

BULAN V

BULAN VI
100

0.79
90

80

70

60

50

0.42

0.42

0.42

0.42

0.42

6.25

6.25

6.25

6.25

6.25

40

30

40

30

20

10

6.66
72.56

6.66
79.22

6.66
85.88

6.66
92.54

6.66
99.21

0.79
100.00

-85.88

-92.54

-99.21

-100.00

TIME SCHEDULE
PELAKSANAAN TUGAS AKHIR
RIDHO SEPTIAN RAHMAN
1109025015
No

Kegiatan

1 PENGAJUAN JUDUL

Maret
April
Mei
Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 1 Minggu 2
JUDUL

2 BAB 1 PENDAHULUAN

BAB 1

A Latar belakang

B Maksud dan Tujuan

C Batasan Masalah

D Sistematika penulisan

3 BAB 2 DASAR TEORI

BAB 2

E konsep pemilihan struktur

F kriteria dasar perancangan

G perencanaan struktur

5 BAB 3 KONSEP PEMBEBANAN

BAB 3

H Tinjauan Beban

Faktor Beban dan Kombinasi Beban

Faktor Reduksi Kekuatan

6 BAB 4 PERHITUNGAN KONSTRUKSI


K Struktur Atas
L Struktur Bawah
7 BAB 5 PENUTUP
M Kesimpulan
N Saran
SEMINAR
REVISI
SIDANG PENDADARAN

Juni
Minggu 3

BAB 4
K
L
BAB 5
M
N
SEMINAR
REVISI
PENDADARAN

Minggu 4