Tata Steel is commissioning the first phase of its integrated steel plant in Kalinganagar, Odisha. The 6 million tonne per year plant will produce high-end flat steel products. Over 3470 acres were allotted for the plant near ports and iron ore mines. Construction has progressed with over 13 lakh cubic meters of concreting and structural erection of 1.88 lakh tonnes completed by June 2014. The state-of-the-art plant will have blast furnaces, coke ovens, and rolling mills to produce 3.5 million tonnes of hot metal and flat steel products annually in the first phase.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
277 views
Tata Steel, Kalinganagar
Tata Steel is commissioning the first phase of its integrated steel plant in Kalinganagar, Odisha. The 6 million tonne per year plant will produce high-end flat steel products. Over 3470 acres were allotted for the plant near ports and iron ore mines. Construction has progressed with over 13 lakh cubic meters of concreting and structural erection of 1.88 lakh tonnes completed by June 2014. The state-of-the-art plant will have blast furnaces, coke ovens, and rolling mills to produce 3.5 million tonnes of hot metal and flat steel products annually in the first phase.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Tata Steel, Kalinganagar
The first phase of Kalinganagar Project - Tata Steels second integrated steel plant in India will be commissioned soon.
About the Project
Conforming to Tata Steels vision of Value Creation and Corporate Citizenship and its commitment to nation building and strengthening its partnership with the State of Odisha, the Company is setting up a 6 million tonnes per annum capacity integrated steel plant in Kalinganagar Industrial Complex in Jajpur district of Odisha. Subsequent to the signing of the MOU, 3470 acres of land was allotted to the Steel Company for setting up the steel plant. While the plant site at Kalinganagar Industrial Complex is beside the National Highway 200, the all-weather ports at Paradip and Dhamra are at a distance of about 100 to 110 km by rail route. Similarly, the iron ore mines are located at a distance of about 200 km from the project site. Project Details Project
Progress:
(as on September 30, 2014)
Concreting work of 13.76 lakh cubic metres completed by end of June 2014Structural erection of 1.88 lakh metric tonnes completed by end of June 2014Equipment erection of 67,330 metric tonnes completed by end June 2014 The state-of-the-art, Kalinganagar Project is being established in two modules of three million tonnes each. The plant, which boasts of the Blast Furnace of 4330 cum capacity, will roll out high-end flat products. During the first phase, the Blast Furnace will have a capacity of 3.3 Million Tonnes Per Annum (MTPA) of hot metal and the Coke Plant will have a capacity of 1.65 MTPA (recovery type oven). While the Sinter plant will have a capacity of 4.91 MTPA, the Steel Melting Shop (SMS) and the Hot Strip Mill (HSM) will have capacity of 4.1 MTPA and 3.5 MTPA, respectively. The project will have a 3X67.5 MW gas-based Captive Power Plant. New technologies like Granshot Systems & CAS OB will be introduced in the plant for steelmaking. The plant is also designed for Zero Liquid Discharge, Waste Recycling Plant and Central Effluent Treatment Plant. High-end flat products will be rolled out from Kalinganagar plant.