The document provides a general construction schedule and cost breakdown for a proposed two-story residential building. It includes a schedule of activities from July 2014 through April 2015 with estimated percentage of work completed each week. It also lists equipment needs by month and provides a cost estimate breakdown for site works, civil works, and structural works, with subtotals for each section. The total estimated cost for the construction project is $2,948,045 to be completed over the scheduled timeframe.

Uploaded by

Hans Corpuz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Plate House

The document provides a general construction schedule and cost breakdown for a proposed two-story residential building. It includes a schedule of activities from July 2014 through April 2015 with estimated percentage of work completed each week. It also lists equipment needs by month and provides a cost estimate breakdown for site works, civil works, and structural works, with subtotals for each section. The total estimated cost for the construction project is $2,948,045 to be completed over the scheduled timeframe.

Uploaded by

Hans Corpuz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

GENERAL CONSTRUCTION SCHEDULE

2014
ITEM NO.

ACTIVITIES

COST

% COST
7-Jul

I.

II.

III.

PRELIMINARIES:
1.1 Stake out & Survey Works
1.2 Secure Bonds, Clearances and Misc. Permits.
FOOTING & EARTH WORKS:
2.1 Excavation Works

VII.

VIII.

IX.

0.200%
2.130%

0.369%
1.900%

4-Aug

0.300%
1.900%

0.245%
0.850%

1.52%

0.260%

0.260%

39,452.00

1.34%

0.220%

0.200%

2.3 Concrete Works

48,215.00

1.64%

2.4 Backfill and Compaction

28,041.00

0.95%

1,436,430.00

48.72%

57,911.00

1.96%

126,742.00

4.30%

3.4 CHB Laying & Plastering

56,834.00

1.93%

3.5 Wall Finishes

23,566.00

0.80%

3.6 Floor Finishes

28,346.00

0.96%

4.1 Stair Railings

49,853.00

1.69%

4.2 Door And Window Openings

18,464.00

0.63%

25,679.00
123,234.00
33,457.00

0.87%
4.18%
1.13%

6.1 Installation of Switches and Junctions

22,346.00

0.76%

6.2 Installation of Electrical Wires & Fixtures

74,600.00

2.53%

55,339.00
22,456.00

1.88%
0.76%

62,836.00
68,853.00

2.13%
2.34%

9.1 Installation of Door and Window

61,643.00

2.09%

9.2 Punch List & Corrections

23,526.00

0.80%

9.3 Final Cleaning and Demobilization.

55,633.00

1.89%

2,948,045.00

100.00%

0.270%

CONCRETE WORKS:

3.3 Concrete Works

VI.

0.381%

28-Jul

44,666.00

3.2 Rebar Cutting and Formworks

V.

3.18%
9.03%

AUGUST
21-Jul

2.2 Rebar and Formworks

3.1 Material & Equipment Procurement

IV.

93,800.00
266,123.00

JULY
14-Jul

7.470%

9.940%

7.750%

0.160%

0.200%
0.230%

METAL AND CARPENTRY WORKS:

PLUMBING AND SANITARY WORKS:


5.1 Waterproofing
5.2 Installation of Tiles
5.3 Installation of Plumbing Fixtures
ELECTRICAL WORKS:

MECHANICAL WORKS:
7.1 Installation of Air Conditioning Units
7.2 Installation of Mechanical Fixtures
PAINTING WORKS:
8.1 Exterior Areas
8.2 Interior Areas
MISCELLENEOUS WORKS:

TOTAL:

0.38%

MONTHLY PERCENTAGE:
WEEKLY COMMULATIVE:
MONTHLY COMMULATIVE:

2.33%

9.74%

12.78%

10.01%

25.23%
0.38%

2.71%
25.23%

21.95%
12.45%

25.23%

35.23%
47.18%

GENERAL CONSTRUCTION SCHEDULE


2014
AUGUST
11-Aug
18-Aug

25-Aug

1-Sep

SEPTEMBER
8-Sep
15-Sep

22-Sep

0.255%

0.245%

0.225%

0.250%

0.250%

0.250%

0.250%

0.200%

0.180%

0.180%

0.180%

0.180%

0.250%

0.250%

0.205%

0.205%

0.160%

0.150%

0.150%

0.050%

0.050%

0.070%

0.070%

0.070%

0.070%

4.000%

3.300%

0.400%

0.160%

0.160%

0.200%

0.070%

0.230%

0.230%

0.450%

0.200%

0.200%

7.400%

6-Oct

OCTOBER
13-Oct
20-Oct

27-Oct

3-Nov

NOVEMBER
10-Nov
17-Nov

0.080%

0.080%

0.080%

0.080%

0.070%

0.080%

0.080%

0.080%

0.070%

0.080%

0.080%

0.160%

0.060%

0.060%

0.030%

0.040%

0.020%

0.150%

0.150%

0.200%

0.260%

0.360%

0.150%

0.150%

0.200%

0.390%

0.160%

0.160%

0.160%

0.145%

0.145%

0.145%

0.145%

2.060%

0.070%

9.04%

1.37%

1.54%

5.11%

21.95%
44.27%
47.18%

3.98%

0.44%

0.45%

0.60%

9.98%
45.63%

47.17%

52.28%

56.26%
57.15%

0.74%

0.74%

0.44%

0.33%

2.52%
56.70%

57.15%

57.75%

58.49%
59.67%

0.39%

2.69%
6.28%

59.23%

59.66%

59.99%

60.37%
65.95%

63.06%

GENERAL CONSTRUCTION SCHEDULE


2015

ER
24-Nov

1-Dec

DECEMBER
8-Dec
15-Dec
0.080%

2.400%

22-Dec

5-Jan

JANUARY
12-Jan
19-Jan

0.080%

0.080%

0.080%

26-Jan

2-Feb

FEBRUARY
9-Feb
16-Feb

MAR
23-Feb

0.080%

0.080%

2-Mar
0.080%

2.200%

2.200%

0.210%

0.370%

0.170%

0.145%

0.145%

0.075%

0.070%

0.145%

0.145%

0.145%

0.070%

0.065%

0.030%

0.035%

0.070%

0.065%

0.065%

0.065%

0.065%

0.065%

0.065%

0.070%

0.050%

0.050%

0.025%

0.025%

0.050%

0.087%

0.087%

0.087%

0.087%

0.087%

0.087%

0.087%

0.087%

0.690%

0.500%

0.500%

0.130%

0.100%

0.100%

0.100%

0.200%

0.170%

0.170%
0.388%

0.170%
0.390%

0.160%
0.290%
0.250%

0.348%
0.170%

0.348%
0.190%

0.345%
0.110%

0.345%
0.130%

0.095%

0.070%

0.060%

0.010%

0.200%

0.530%

2.89%

3.03%

3.40%

0.81%

0.00%

1.15%

7.24%
65.94%

68.97%

72.37%
73.19%

0.65%

0.86%

0.71%

0.85%

3.36%
73.18%

73.18%

74.33%

74.98%
76.54%

0.67%

0.87%

0.76%

1.23%

3.15%
75.83%

76.54%

77.40%

78.07%
79.69%

4.9
78.93%

79.69%

80.92%

84.6

TION SCHEDULE

MARCH
9-Mar
16-Mar

23-Mar

6-Apr

APRIL
13-Apr

20-Apr

27-Apr

0.080%
0.550%

0.450%

0.500%

0.750%

GENERAL CONSTRUCTION SCHEDULE


120.00%
0.130%

0.130%

100.00%

80.00%

0.064%

Axis Title

GENE

60.00%

40.00%

0.341%
0.100%

0.357%
0.090%

0.310%
0.090%

0.330%

0.378%

0.075%

0.075%

0.045%

0.095%

0.245%

0.300%

0.220%

0.200%

0.210%

0.250%

0.00%
0.300%

0.520%

0.750%
0.180%

0.750%
0.180%

0.180%
0.200%

0.200%
0.200%

0.355%
0.355%

0.370%
0.370%

0.390%
0.390%

0.400%
0.510%

0.550%

0.540%

0.500%

0.500%

0.250%

0.350%

0.200%

0.990%

0.900%

3.93%

4.31%

0.260%
0.360%

0.96%

1.36%

0.355%
0.355%

1.36%

3.38%

4.91%
81.88%
84.60%

3.78%

20.00%

10-Jun

30-Jul

15.40%
83.25%

84.60%

87.98%

91.76%
100.00%

95.69%

100.00%

18-Sep

7-Nov
Axis Title

27-Dec

15-Feb

6-Apr

26-May

HEDULE

pr

GENERAL CONSTRUCTION SCHEDULE

26-May

2014

EQUIPMENT

QUANTITY

JULY
7-Jul

BACKHOE (Tracked)
BACKHOE (Wheeled)
PAYLOADER
DUMP TRUCK
MOBILE CRANE
PUMPCRETE
SHOTCRETE PUMP
VIBRATOR
PNEUMATIC COMPACTOR
WELDING MACHINE
GENERATOR SET
COMPACT CONCRETE MIXER

1
1
1
1
1
1
2
2
2
2
1
1

14-Jul

AUGUST
21-Jul

28-Jul

4-Aug

4
AUGUST
11-Aug

SEPTEMBER
18-Aug

25-Aug

1-Sep

8-Sep

15-Sep

OCTOBER
22-Sep

6-Oct

PROPOSED TWO-STOREY RESIDENTIAL BUILDIN

EQUIPMENT SCHEDULE
2014
OCTOBER
13-Oct

NOVEMBER
20-Oct

27-Oct

3-Nov

10-Nov

17-Nov

DECEMBER
24-Nov

1-Dec

TIAL BUILDING

LE

DECEMBER
8-Dec

15-Dec

JANUARY
22-Dec

5-Jan

12-Jan

FEBRUARY
19-Jan

26-Jan

2-Feb

OWNER: WILMA DELA CALZADA

2015
FEBRUARY
9-Feb

MARCH
16-Feb

23-Feb

2-Mar

9-Mar

APRIL
16-Mar

23-Mar

6-Apr

ALZADA

APRIL
13-Apr

20-Apr

27-Apr

2.0

3.0

SITE WORKS
Clearing and Grabbing
Excavation
Backfilling and Compaction
Gravel Fill
Soil Poisoning
Subtotal 02
CIVIL WORKS
Concreting , Rebar and Formwors
FOOTING
Concrete
Rebar
Formworks
COLUMN

sq.m
cu.m
cu.m
cu.m
sq.m

199.00
36.49
298.50
30.71
199.00

150.00
1,150.00
75.00

cu.m
kg
sq.m

10.17
1,252.82
32.24

4,000.00
48.00
475.00

Foundation -Roof beam line


Concrete
Rebar
Formworks
SLAB ON GRADE
Concrete
Rebar
Formworks
STAIR
Concrete
Rebar
Formworks
Subtotal 03

cu.m
kg
sq.m

5.52
1,379.70
83.70

4,000.00
48.00
475.00

cu.m
kg
sq.m

27.72
2,217.60
4.83

4,000.00
48.00
475.00

cu.m
kg
sq.m

1.04
125.37
11.28

4,000.00
48.00
475.00

150.00
895.00
300.00
870.00

###
###
###
###
-

###
###
###
###
###
###

### 1,100.00
###
16.00
###
550.00

###
###
###

###
###
###

### 1,100.00
###
16.00
###
550.00

6,070.68
###
###

###
###
###

###
###
###

### 1,100.00
###
16.00
2,294.25
550.00

###
###
###
###
2,656.50 4,950.75

4,179.00
6,017.76
5,356.58

1,149.23
2,005.92
6,202.35

1,100.00
16.00
550.00

5,328.23
8,023.68
###
###

You might also like