This document provides a protocol for aligning boiler columns for a project located in Yedlapur, Raichur, Karnataka. It details the plumb readings and deviations for 10 column markers, with a maximum deviation of 8. It also lists the design and actual elevations for the 10 column assemblies, with a maximum elevation deviation of 2. The protocol was created on June 5, 2013 by Raichur Bio Energies Pvt. Ltd. for their boiler column alignment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
819 views

Protocol Column Alignment

This document provides a protocol for aligning boiler columns for a project located in Yedlapur, Raichur, Karnataka. It details the plumb readings and deviations for 10 column markers, with a maximum deviation of 8. It also lists the design and actual elevations for the 10 column assemblies, with a maximum elevation deviation of 2. The protocol was created on June 5, 2013 by Raichur Bio Energies Pvt. Ltd. for their boiler column alignment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

PROTOCOL FOR BOILER COLUMN ALIGNMENT

Client - Raichur Bio Energies Pvt. Ltd.


Location- Yedlapur, Raichur, Karnataka.
Project No. -PD0581

Protocol No.-03
Date-05.06.2013

+Z
-X
BK1

+X

BK2
-Z

BC1

BC3

BC2

BC4

ST1

ST2

BC5

BOILER
FRONT

BC6

BOILER COLUMNS VERTICALITY ALIGNMENT


Sr.No.

Column
Mark No.

BK1

BK2

BC1

BC2

BC3

BC4

BC5

BC6

ST1

10

ST2

BY KAMAL CONST.

Along Axis
-X
+Z
+X
+Z
-X
+Z
-X
-Z
+X
+Z
+X
-Z
+X
+Z
+X
-Z
-X
-Z
+X
-Z

Top

Plumb readings
Middle
Bottom
400
398
397
400
402
404
400
404
408
400
403
405
400
401
402
400
402
403
400
402
404
400
398
396
400
401
403
400
402
405
400
401
403
400
399
398
400
403
405
400
397
394
400
403
405
400
398
394
400
398
396
400
399
396
400
402
405
400
396
393

BY TIL

Max.
Deviation
-3
+4
+8
+5
+2
+3
+4
-4
+3
+5
+3
-2
+5
-6
+5
-6
-4
-4
+5
-7

Remark

BY RBEPL

BY RBEPL

PROTOCOL FOR BOILER COLUMN ALIGNMENT


Client - Raichur Bio Energies Pvt. Ltd.
Location- Yedlapur, Raichur, Karnataka.
Project No. - PD0581

Protocol No.-03
Date-05.06.2014

BOILER COLUMNS ELEVATION ALIGNMENT

Column Assembly
SR. NO.
EL+5300

BY KAMAL CONST.

1
2
3
4
5
6
7
8
9
10

COLUMN ELEVATION AS PER


ACTUAL
MARK NO.
DRAWING
ELEVATION
BK1
+5300
+5300
BK2
+5300
+5301
BC1
+5300
+5301
BC2
+5300
+5299
BC3
+5300
+5300
BC4
+5300
+5300
BC5
+5300
+5300
BC6
+5300
+5302
ST1
+5300
+5300
ST2
+5300
+5301

BY TIL

NT
Protocol No.-03
Date-05.06.2014

VATION ALIGNMENT
DEVIATION REMARK
0
+1
+1
-1
0
0
0
+2
0
+1

BY RBEPL