The document outlines a project plan with 17 tasks over various durations from January 7th to December 15th including conducting interviews, administering questionnaires, reviewing documents, analyzing data, designing aspects of the system, writing code, testing, and training users.

Uploaded by

ewinze
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

System Planning (Question 10)

The document outlines a project plan with 17 tasks over various durations from January 7th to December 15th including conducting interviews, administering questionnaires, reviewing documents, analyzing data, designing aspects of the system, writing code, testing, and training users.

Uploaded by

ewinze
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ID

Task Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

17

Duration

Start

Finish

Predecessors

Begin
0 days
Phase 1
10 days
Conduct interview
5 days
Administer
5 days
questionnaires
Phase 2
120 days
Review documents
15 days
Analyze data and user 5 days
requirements
Design input, output,
5 days
user interface
Design database
20 days
Design network,
20 days
program & control
Write program code
30 days
Test and debug program 15 days
code
Document system
10 days
Prepare Site
15 days
Train user
10 days
Perform post
5 days
implementation review

Wed 1/7/15
Wed 1/7/15
Wed 1/7/15
Wed 8/7/15

End

Tue 15/12/15 Tue 15/12/15 16

Project: System Planning(Questio


Date: Thu 18/6/15

0 days

Wed 1/7/15
Tue 14/7/15
Tue 7/7/15
Tue 14/7/15 3

24 May '15
12 Jul '15
30
23
17
1/7

10

30 Aug '15
3
27

18 Oct '15
21
14

6 Dec '15
8

Wed 1/7/15 Tue 15/12/15


Wed 1/7/15 Tue 21/7/15
Wed 22/7/15 Tue 28/7/15 6,4
Wed 29/7/15 Tue 4/8/15

Wed 29/7/15 Tue 25/8/15


Wed 26/8/15 Tue 22/9/15

7
9,8

Wed 23/9/15 Tue 3/11/15 10


Wed 4/11/15 Tue 24/11/15 11
Wed 23/9/15 Tue 6/10/15
Wed 7/10/15 Tue 27/10/15
Wed 28/10/15 Tue 10/11/15
Wed 9/12/15 Tue 15/12/15

10
13
14
15,12FS+10
days
15/12

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Critical

Project Summary

Duration-only

Critical Split

External Tasks

Manual Summary Rollup

Progress

External Milestone

Manual Summary

Slack

Page 1

24 Jan '
25

You might also like