Manual of Procedures (Consultancy) - Vol.4
Manual of Procedures (Consultancy) - Vol.4
Page i
Page ii
STEP 3
STEP 4
Page iii
STEP 6
STEP 7
STEP 8
STEP 9
POST-QUALIFY ............................................................................... 66
Page iv
STEP 11 HAVE THE CONTRACT SIGNED AND APPROVED AND ISSUE THE NTP ............ 72
Legal Reference .................................................................................................... 72
When must the winning bidder and the Procuring Entity enter into a contract? .............. 72
What are the Timelines to be considered with respect to contract approval? ................. 72
When shall the Procuring Entity issue the NTP? ......................................................... 72
When is a contract effective?................................................................................ 72
Who are the Parties involved in Contract Signing and Approval and Issuance of the
NTP?.................................................................................................................... 73
What documents form part of the contract? .............................................................. 73
How is Contract Signed and Approved, and the NTP Issued? ....................................... 73
What are the rules governing the review and approval of government contracts? .......... 74
What happens if the bidder with the HRRB/SRRB refuses or is unable, through its
own fault, to post the performance security and sign the contract within the
prescribed period? ................................................................................................. 75
What happens if the failure of the bidder with the HRRB/SRRB to sign the contract
within the prescribed period is not its own doing?...................................................... 76
Page v
GUIDELINES
ON
CONTRACT
IMPLEMENTATION
FOR
THE
PROCUREMENT OF CONSULTING SERVICES ............................................... 88
ADVANCE PAYMENT FOR MOBILIZATION ........................................................... 90
Can the Procuring Entity make an advance payment for mobilization to the
consultant? ........................................................................................................... 90
How can the Procuring Entity recover the advance payment it made to a
consultant? ........................................................................................................... 90
SUBCONTRACTING ....................................................................................... 96
Is subcontracting allowed for the procurement of consulting services?.......................... 96
WARRANTY.............................................................................................. 102
What is a warranty and when is it required?............................................................ 102
Page vi
ADB
AFP
APP
APR
BAC
BDS
BIR
BOC
Bureau of Customs
BSP
CAF
CDA
CQS
CSC
DBM
DBM-PS/
PS-DBM
DOJ
Department of Justice
DTI
DV
Disbursement Voucher
E.O.
Executive Order
FAP
FBS
GAA
GCC
GFI
GOCC
GOP
GPPB
GPPB-TSO
Page vii
GPRA
HRB
HRRB
IAEB
IFI
IPR
IRR
IRR-A
ITB
Instructions to Consultants
JVA
LBP
LC
Letter of Credit
LCS
Least-Cost Selection
LGU
LOI
MDS
NCA
NEDA
NFCC
NGA
NGO
Non-Government Organization
NTP
Notice to Proceed
P.D.
Presidential Decree
PhilGEPS/
G-EPS
PMO
PPMP
PWI
QBE
QBS
Quality-Based Selection
QCBE
Page viii
QCBS
R.A.
Republic Act
R.A. 9184
RFP
SARO
SBDs
SCC
SEC
SOW
Scope of Work
SRRB
SSS
Single-Source Selection
SUCs
SWAps
TOR
Terms of Reference
TWG
UN
United Nations
UNDB
WB
SECTION 1
Introduction
Page 3 of 108
Scope of Volume 4
This Manual seeks to provide its users with clear, concise, and accurate information on the
public procurement of consulting services, by discussing the steps that need to be taken
to effect such procurement in the manner prescribed by R.A. 9184, otherwise known as the
Government Procurement Reform Act and its IRR-A. It also discusses important issues that
may confront government officials in all stages of consulting services procurement, from the
preparation of bid documents, to the actual conduct of the bidding activity, monitoring of
contract implementation and the final payment to the consultant.
This Manual focuses on public procurement of consulting services. The procedures are
harmonized to a large extent with the IFIs and bi-lateral agencies lending to the Philippines.
There are however policies which are specific to a particular lending agency or grantor and the
document highlights the main differences. It should however be noted that the loan, credit or
grant agreement with the relevant IFIs and/or bilaterals and their respective Guidelines will
be the overriding factors governing the foreign assisted projects.
This Manual focuses on public procurement of Consulting Services. The PBDs on Consulting
Services are harmonized to a large extent with the WB. There are, however, policies which
are specific to the WB and the PBD for Consulting Services highlight these differences. The
circumstances that would permit the use of the Harmonized PBDs in WB projects require that:
(a) the Legal Agreement should provide for it; (b) all short listed firms are national firms; and
(c) that the amount does not go beyond $200,000. For projects funded by ADB and JBIC, the
respective guidelines on selection of consultants will be followed, as these IFIs have yet to
harmonize with the PBDs for Procurement of Consulting Services.
CONSULTING SERVICES are services for infrastructure projects and other types of projects
or activities of the government requiring adequate external technical and professional
expertise that are beyond the capability and/or capacity of the Government to undertake such
as, but not limited to: (i) advisory and review services; (ii) pre-investment or feasibility
studies; (iii) design; (iv) construction supervision; (v) management and related services; and
(vi) other technical services or special studies. (IRR-A Section 5 [i])
2.
Page 4 of 108
3.
b.
To determine the basic features and the feasibility of individual projects Studies toward this objective include functional designs, project site
selections, architectural and space programming and physical layout of
specific projects, preliminary designs and cost estimates, and the economic,
financial and environmental impact analyses required for project evaluation;
or
c.
Design
This type of services normally consists of three (3) phases:
4.
a.
Pre-Design Phase, which establishes the general size and scope of the
project and its location on the site. The consulting services under this
category include reconnaissance, topographical and other engineering and
land
surveys,
soils
investigations,
preparation
of
preliminary
architectural/engineering designs, layouts, outline specifications, preliminary
cost estimates, and specific recommendations prior to actual design;
b.
c.
Construction Supervision
Consulting services under this category include:
a.
b.
c.
d.
e.
Review and recommendation for approval of progress and final billings of the
contractor; and
f.
work
Page 5 of 108
5.
6.
a.
b.
c.
d.
e.
f.
g.
Institutional
strengthening,
organization
requirements, training and technology transfer;
h.
i.
advisory
services,
development,
impact
manpower
b.
c.
Provision of staff
replacements; and
d.
to
carry
out
certain
functions
and
to
train
their
Soils investigation;
b.
c.
d.
e.
Parcellary surveys;
f.
g.
h.
Page 6 of 108
j.
k.
l.
m.
n.
Housing;
o.
Interior design;
p.
q.
Landscaping;
r.
s.
Other specialized expertise not included in the above categories and to be provided for a
client in the performance of a specified task over a specified period of time may also be
considered as consulting services.
SECTION 2
Page 9 of 108
Page 10 of 108
Procurement Planning
What is the purpose of procurement planning?
The purpose of procurement planning is for the procurement entity to schedule its
procurement activities in advance, consistent with the agencys annual procurement plan. The
planning stage, the following activities must be undertaken, among others:
2.
The corporate budget for the contract approved by the governing board, pursuant to
E.O.No. 518, s. 1979, in the case of GOCCs and GFIs; and R.A. 8292, in the case of
SUCs; or
3.
Thus, the ABC referred to in R.A. 9184 and its IRR-A basically refers to the proposed budget
for the project approved by the Head of the Procuring Entity based on the APP as consolidated
from various PPMPs.1
What are the factors that should be considered in determining the ABC?
In determining the ABC (keeping in mind that contract prices are fixed prices), the PMO or
end-user unit, with the assistance of the TWG (when necessary), must consider the different
cost components, namely:
1.
2.
The cost of money, to account for government agencies usually buying on credit
terms; and
3.
Inflationary factor, since the planning phase is usually done one year ahead of the
actual procurement date.
If the sum of the different cost components is lower than the appropriation for the
procurement, then the ABC should be equal to the sum of the cost components. If the
resulting sum is higher than the appropriation, it is advisable to review the technical
specifications and the computation of the ABC. In any case, the ABC should not exceed the
appropriation.
In case of adjustment of ABC due to failure of bidding, GPPB Resolution 07-2005 provides that
the ABC may be adjusted upwards only under the following conditions:
For FAPs, reference to the standard bidding documents for the project should be made to determine the applicability of
the ABC.
Page 11 of 108
1.
There has been failure of bidding for the second time due to all bids submitted
exceeding the ABC or no bids have been submitted, or failure in the negotiated
procurement after two failed biddings; and
2.
There has been previous modification of the terms, conditions and specifications of
the project based on Section 35 of the IRR-A, except when the project is indivisible,
where the technical component is an integral part of the whole that cannot be
reduced, and it constitutes the minimum requirement of the Procuring Entity for
which there are no substitutes.
GPPB Resolution 07-2005 further states that the ABC may be adjusted downwards if there is a
need to reflect actual market prices and/or scope of work or suit actual field conditions of the
project.
Upon adjustment of ABC, the Procuring Entity must conduct re-bidding with readvertisement/posting. Any succeeding adjustment of the ABC shall be in accordance with
these guidelines.
Remuneration Costs
These are the remuneration to be paid to the consultants staff/personnel who are
directly engaged in the consulting services as per agreed manning schedule. It covers
the basic rates of the staff multiplied by a billing factor of the consulting firm.
The umbrella organization of consultants shall, from time to time, disseminate
information on the rates or fees of consultants per expertise as guide to the BAC and
end-user during financial negotiation.
a.
Basic Rates
The basic rates represent the salaries actually being received by the
professional staff from the consulting firms as certified by the consultant with
a sworn statement to be submitted to the Procuring Entity. The basic rates of
all individual members of the staff shall be clearly indicated in the contract. In
determining the basic rates, the following may be considered as bases:
b.
i.
Salary history;
ii.
iii.
Overhead Cost
These are incidental and general administrative and management
expenses of the firm other than those directly related to the project,
Manual of Procedures for the Procurement of Consulting Services
Page 12 of 108
and are expressed in percent of the total of the basic salaries of all the
personnel of the firm. Normally not exceeding one hundred twenty
percent (120%) of the basic salary of the personnel, these expenses
may include a combination of the following:
ii.
Business
costs
including
advertisements, promotions;
representation
activities including
allowances,
personnel
Social Charges
These are cost items for the welfare and benefit of the consultants
staff in accordance with the policies of the consultant and of the
government. Their totality expressed as a percentage of the basic
rates of the consultants personnel, these cost items may include any
or a combination of the following, based on audited and sworn
statement to be submitted by the consultant to the Procuring Entity:
iii.
Bonuses;
Medical Care;
Management Fee
This is the remuneration for the professional know-how and expertise
of the consultant. The amount of fees shall be fixed as a percentage
of the sum of the basic salary, overhead costs and social charges.
Depending on the complexity of the services rendered and other
considerations, this fee ought not to exceed fifteen percent (15%) of
the sum of the basic salary, overhead costs and social charges.
Page 13 of 108
The sum total of the basic salary, overhead, social charges and management fee as
percentage of basic salary represents the billing factor or multiplier. The size of the multiplier
may vary with the types of work, the organization and experience of the consultant, and the
geographic area in which its office is located. The multiplier normally ranges from 2.0 to 3.0
for the technical personnel, and shall normally not exceed 1.8 for the administrative personnel
directly hired for the project.
2.
Reimbursable Costs
These include all other expenses associated with the execution of the services. These
costs may be classified into:
a.
Housing Allowance
These cover housing costs, including those for power and water, for
consultants staff. It should not include food and laundry since these
are basic necessities that the consultant has to spend for even without
the project. In considering the housing allowance, the base of
operation and the designated official station of duty of the consultant
must be defined.
ii.
Per Diems
These are daily allowances given to the consultant personnel while on
official trips authorized by the agency and/or explicitly required in the
contract as follows:
Page 14 of 108
iii.
b.
International Travel
This covers the cost of full fare economy class air transportation,
preferably through a Filipino-owned airline, by the most direct and
expeditious air routes of the consultants expatriate staff from their
point of origin. An expatriate shall be allowed the cost of excess
baggage up to 20 kilograms each per round trip.
ii.
Domestic Travel
This covers the cost of full fare economy class air transportation
and/or land transportation by the most direct and expeditious routes
of the consultants staff for official trips authorized by the agency
and/or explicitly required in the contract.
iii.
Domestic Transportation
This covers the provision of vehicles either through purchase or rental.
iv.
Communication Expenses
This includes telephone, mobile, two-way radio, telegrams, Internet,
parcel, freight, courier, fax and etc.
3.
v.
vi.
vii.
viii.
ix.
Contingency
Payments in respect of items of additional work within the general scope of services
that may turn out to be necessary as the study progresses or costs that would exceed
the estimates set forth may be chargeable to the contingency amounts in the
respective estimates. However, these payments can be done only if such costs are
approved by the agency concerned prior to its being incurred and provided, further,
that they shall be used only in line with the unit rates and costs specified in the
contract and in strict compliance with the project needs. Contingency amount must
not exceed five percent (5%) of the amount of the contract.
Page 15 of 108
Page 16 of 108
Legal Reference
IRR-A Section 17 provides the rules in relation to the preparation of the bidding documents.
The objectives, scope and expected outputs and/or results of the proposed contract;
2.
3.
4.
IAEB;
2.
Eligibility Documents;
3.
4.
5.
ITB;
6.
BDS;
7.
GCC;
8.
SCC;
9.
10.
11.
12.
Appendices.
The contents of the standard bidding documents for FAPs may vary.
Page 17 of 108
procedure by providing information on the evaluation process and by indicating the evaluation
criteria and factors and their respective weights and the minimum passing quality score. The
ITB should indicate an estimate of the level of key staff inputs (in staff time) required of the
consultants or the total budget.
Consultants, however, should be free to prepare their own estimates of staff time to carry out
the assignment and to offer the corresponding cost in their proposals. The ITB should specify
the bid validity period, which should be adequate for the evaluation of bids, decision on
award, and finalization of contact negotiations.
The BAC;
2.
The TWG;
3.
4.
5.
2.
Date, time and place of the pre-bid conference (where applicable), submission of
proposals and opening of proposals;
3.
Eligibility Requirements;
4.
ITB, including, the type of evaluation procedure, criteria for proposal evaluation and
post-qualification;
5.
The objectives, scope and expected outputs and/or results of the proposed
contract;
b.
c.
Page 18 of 108
d.
e.
6.
7.
Completion schedule;
8.
Form, amount and validity period of bid security, the amount being stated in
Philippine peso terms; (IRR-A Section 27)
9.
10.
The Procuring Entity may require additional document requirements or specifications where
applicable and necessary for prospective bidders to prepare their respective bids. The bidding
documents, as amended, shall subsequently form an integral part of the contract. (IRR-A
Section 17.3) Statements not made in writing at any stage of the bidding process shall not
modify the bidding documents.
2.
Enter into contract with the Procuring Entity within ten (10) calendar days, or less as
indicated in the ITB, from receipt of the Notice of Award, and furnish the performance
security provided for in Section 39 of the Act and its IRR-A. (IRR-A Section 27.1)
What are the forms of Bid Security and the corresponding amounts
required?
The bid security shall be in any of the following forms, with the corresponding required
amount: (IRR-A Section 27.2)3
e.
f.
a.
b.
c.
d.
MINIMUM AMOUNT
1% of ABC
1% of ABC
1 % of ABC
2 % of ABC
The total amount shall not
be less than 2 % of the
ABC.
100% of ABC
For FAPs, reference should be made to the appropriate standard bidding documents for the project in order to
determine the requirement of a bid security and, if one is so required, the applicable amount and form thereof.
Page 19 of 108
What is the period of validity of Bids and the corresponding Bid Security?
Bids and bid securities must be valid for a reasonable period of time as determined by the
Head of the Procuring Entity. This time period must be indicated in the bidding documents,
but in no case should it exceed one hundred twenty (120) calendar days from the date of the
opening of bids. (IRR-A Section 28) The recommended norm for bid validity is ninety (90)
calendar days with the corresponding bid security valid for one hundred twenty (120)
calendar days to provide reasonable time (thirty (30) calendar days) for the Procuring Entity
to act if the security is to be called.
Should it become necessary to extend the validity of the bids and the bid securities, the
Procuring Entity should request in writing all those who submitted bids for such extension
before the expiry date thereof. Bidders shall have the right to refuse to grant such extension
without forfeiting their bid securities. The bid security of bidders who refuse to grant the
Procuring Entitys request for an extension of the validity of their respective bid securities will
have these securities returned to them. (IRR-A Section 37.2.2) However, they are deemed
to have waived their right to further participate in the bidding.
Page 20 of 108
2.
3.
The bidder being considered for award does not accept the award or does not sign the
contract within the period prescribed in the bidding documents;
4.
The bidder being post-qualified did not provide the BAC the required clarifications; or
5.
The bidder is proven to commit any of the acts under Sections 65 and 69 (Imposition
of Administrative Penalties).
When shall the performance security be posted by the Bidder with the
Highest Rated Responsive Bid?
Within a maximum period of ten (10) calendar days from the receipt of the Notice of Award
from the Procuring Entity, and in all cases upon the signing of the contract, the successful
bidder should furnish the Procuring Entity with the performance security in accordance with
the Conditions of Contract, and in the Form prescribed in the Bidding Documents. (IRR-A
Section 39.1) The performance security forms part of the contract. (IRR-A Section
37.2.3)
a.
b.
c.
d.
e.
MINIMUM AMOUNT
5% of contract price
5% of contract price
Page 21 of 108
Who are the parties involved in the posting of the Performance Security?
The bidder with the HRRB, the Procuring Entity and the issuer of the security, e.g., the
banking/financial institution or the insurance company, are all involved in the posting of the
performance security.
2.
The bidder with the HRRB posts a performance security. In so doing, it must comply
with the following conditions:
a.
b.
The performance security must at least be co-terminus with the period of final
completion of the contract.
The procurement unit/office accepts the performance security and indicates such
posting and acceptance by attaching the appropriate form to the contract.
Page 22 of 108
Legal Reference
IRR-A Section 20 specifies the rules and the guidelines in relation to the conduct of a preprocurement conference.
Ensure that the procurement is in accordance with the PPMP and APP;
2.
Determine the feasibility of the procurement by ascertaining, among other factors, the
availability of the appropriations and programmed budget for the contract, and the
adherence of the bidding documents, TOR and other related matters to relevant
general procurement guidelines;
3.
Review, modify and agree on the criteria for eligibility screening, and ensure that the
said criteria are fair, reasonable, and that they are of the pass / fail type and are
written in such manner;
4.
Review, modify and agree on the criteria for short listing, including the weights for
each criterion;
5.
Determine the actual number of consultants to be included in the short list. The
number shall be from three (3) to seven (7) consultants, with five (5) as the
preferable number, as well as the minimum score required; (IRR-A Section
24.15.2)
6.
Review, modify and agree on the criteria for the evaluation of proposals, and ensure
that the said criteria are fair, reasonable and applicable to the procurement at hand.
The pre-procurement conference should also determine whether the evaluation
procedure should be quality based or quality-cost based. If the procedure will be
quality-cost based, the corresponding weights for the technical and financial proposals
should be agreed upon and then recommended by the BAC to the Head of the
Procuring Entity for approval. The weights of the financial proposal shall be from
Page 23 of 108
8.
Reiterate and emphasize the no contact rule during the bid evaluation process, and
the applicable sanctions and penalties, as well as agree on measures to ensure
compliance with the foregoing; and
9.
of
or
to
or
The BAC;
2.
The Secretariat;
3.
4.
5.
6.
Technical experts who assisted in the preparation of the TOR and bidding documents
for the procurement at hand;
7.
8.
2.
Page 24 of 108
performance in similar and other projects. These also include its relationship with
previous and current clients, overall current work commitments, the geographical
distribution of its current/impending projects, and the level of attention it is going to
give to the project in question. In rating a consultant on this criterion, the BAC ought
to consider both the overall experiences of the firm and the individual experiences of
the principal and key staff, including those experiences when the staff were employed
by other consultants (Recommended weight: 10%-30%); and
3.
Plan of approach and methodology in delivering the services required. This criterion
should emphasize the clarity, feasibility, innovativeness and comprehensiveness of
the plan approach, and the quality of the interpretation of project problems, risks and
the suggested solutions (Recommended weight: 20%-40%).
The BAC must assign numerical weights to each of the above criteria, and these weights must
be indicated in the Request for Proposals (RFP). The relative importance of the above three
(3) factors will vary with the type of consulting services to be performed. In the overall rating
of the proposals, the greatest weight is normally given to the qualifications of the staff to be
assigned to the project. They are the most important resources for the success of the work
as they are the ones analyzing the problems and proposing solutions. The above criteria can
be further subdivided to appropriately consider the requirements of the project.
The weights for each criterion, which should have been determined during the preprocurement conference, shall add up to one hundred percent (100%).
For complex or unique undertakings, such as those involving new concepts/technology or
financial advisory services, participating short listed consultants may be required, at the
option of the agency concerned, to make an oral presentation to be presented by each
consultant, or its nominated Project Manager or head, in case of consultant firms, within
fifteen (15) calendar days after the deadline of submission of technical proposals.
SECTION 3
Page 27 of 108
Competitive Bidding
Page 28 of 108
Step 1
Legal Reference
IRR-A Section 21 specifies the rules in relation to the advertising and posting of the IAEB.
The name of the contract to be bid, a general description of the project and other
important or relevant information on the project;
2.
b.
3.
The nature of the evaluation process, that is, whether Quality-Based or Quality CostBased; (IRR-A Section 33.3.1)
4.
The weights for the technical and financial proposals under the Quality Cost-Based
Evaluation process; (IRR-A Section 33.5)
5.
6.
Deadline for the submission of the LOI, and application for eligibility and short
listing;
b.
Deadline for the submission and receipt of the eligibility and short listing
requirements; and
c.
7.
The ABC
8.
Page 29 of 108
9.
The period of availability of the eligibility documents, the place where the eligibility
documents may be secured and, where applicable, the price of the eligibility
documents;
10.
11.
The name, address, telephone number, facsimile number, and e-mail and website
addresses of the concerned Procuring Entity, as well as its designated contact person;
12.
The Reservation Clause, which is normally located at the bottom of the notice; and
13.
Such other necessary information that are deemed relevant by the Procuring Entity.
When, where, and for how long do you post an Invitation to Apply for
Eligibility and to Bid?
The IAEB for projects with ABCs of more than One Million Pesos (P 1 Million) and/or those
with a duration of more than four (4) months should be posted: (IRR-A Section 21.2.2)
1.
Advertised at least once in one (1) newspaper of general nationwide circulation which
has been regularly published for at least two (2) years before the date of issue of the
advertisement (advisably from the 7th calendar day after the pre-procurement
conference, but if during the pre-procurement conference the BAC finds that it is not
prepared to undertake the bidding procedure, it should not hesitate to consider
moving back the advertisement/posting thereof to allow more time to perfect the
same);
2.
3.
At any conspicuous place reserved for this purpose in the premises of the Procuring
Entity concerned, as certified by the head of the BAC Secretariat of the Procuring
Entity concerned, for seven (7) calendar days, if applicable.
Except with respect to newspaper publications, the IAEB of projects with ABCs of P1 Million or
less and/or those with durations of four (4) months of less must be posted in all those
areas/media where the IAEB of projects with ABCs of more than P1 Million and/or those with
durations of more than four (4) months should be posted/published. The same periods shall
also apply. (IRR-A Section 21.2.3)
For public bidding of contracts with an ABC costing more than One Million Pesos (P1
Million) and/or those with a duration of more than four (4) months:
a.
The BAC Secretariat prepares the draft IAEB for review/approval of the BAC.
Page 30 of 108
2.
b.
The BAC approves the contents of the IAEB during the pre-procurement
conference.
c.
The BAC Secretariat posts the IAEB in any conspicuous place reserved for this
purpose in the premises of the Procuring Entity for the duration required; and
this fact will be certified to by the head of the Secretariat.
d.
e.
The BAC Secretariat, through its member who is authorized to transact with
the PhilGEPS, posts the IAEB in the following websites: the PhilGEPS, that of
the Procuring Entity, and its the Procuring Entitys e-procurement service
provider, if any, for the duration required.
For public bidding of contracts with an ABC costing One Million Pesos (P1 Million) and
below, and/or those with durations of four (4) months of less, and for alternative
methods of procurement:
a.
The BAC Secretariat prepares the draft IAEB for review/approval of the BAC.
b.
c.
When may the Procuring Entity exercise its right to reject bids, declare a
failure of bidding, or not award the contract?
The Procuring Entity may exercise the right to reject any and all bids, to declare a failure of
bidding, or not to award the contract in any of the following situations (IRR-A Section
41.1):
1.
2.
If the BAC is found to have failed in following the prescribed bidding procedures,
for which the applicable sanctions shall be applied to the erring officers, as provided in
IRR-A Section 65; or
3.
For any justifiable and reasonable ground where the award of the contract will not
redound to the benefit of the government as follows:
Page 31 of 108
a.
b.
c.
If the source of funds for the project has been withheld or reduced through no
fault of the Procuring Entity.
If the Head of the Procuring Entity abuses his power to reject any and all bids, as provided by
the Reservation Clause, with manifest preference to any bidder who is closely related to him
in accordance with IRR-A Section 47, or if it is proven that he exerted undue influence or
undue pressure on any member of the BAC or any officer or employee of the Procuring Entity
to take such action, and the same favors or tends to favor a particular bidder, he shall be
meted with the penalties provided in IRR-A Section 65. (IRR-A Section 65.1.5)
Page 32 of 108
Step 2
Documents,
and
Legal Reference
IRR-A Section 24 specifies the rules in relation to the eligibility requirements for the
procurement of consulting services.
When should Letters of Intent and Applications for Eligibility and Short
listing be submitted?
Prospective bidders should submit their written LOIs and Applications for Eligibility and Short
listing to the BAC and have these received not later than seven (7) calendar days from last
date of posting of the IAEB. Upon receipt of these documents, the BAC must give the
prospective bidders the list of eligibility requirements, and inform them in writing of the date,
time, and venue for the submission of such requirements. (IRR-A Section 21.3.1)
Once the PhilGEPS is fully established, prospective bidders may also submit their LOIs and
Applications for Eligibility and Short listing electronically to the Procuring Entity through the
PhilGEPS, likewise within the deadline set for the submission of the written form of the
documents.
Page 33 of 108
the Procuring Entity resorts to negotiated procurement, the terms, conditions, and
specifications of the project as well as the ABC must be maintained.
The services they would be providing is beyond the capability of the Procuring Entity
to undertake, either because it does not have the expertise or it could not devote
enough time to the work due to numerous other assignments; and
2.
The services they would be providing and their hiring would not be inconsistent with
the governments policy of not competing with the private sector. (IRR-A Section
24.3)
Pre-investment components which include feasibility studies and related surveys and
special studies;
2.
Detailed engineering design and related activities (where the project is determined to
be feasible); or
3.
Project Management/Supervision.
Under the same Section 1 of E.O. 278, where Filipino capability is determined by appropriate
authorities to be insufficient, Filipino consultants may hire or associate themselves with
foreign consultants, provided that the Filipino shall be the lead consultant. It further
provides that where foreign funding is indispensable, foreign consultants for the project must
Manual of Procedures for the Procurement of Consulting Services
Page 34 of 108
enter into joint venture with Filipino consultants. It should be noted, however, that this E.O.
only covers consultancy services for foreign-assisted government infrastructure projects.
To be considered a Filipino consultant, whether as an individual, a sole proprietorship, a
partnership, a corporation, or a joint venture, one must satisfy the following requirements:
(IRR-A Section 24.1)
1.
2.
3.
4.
5.
Individual
a.
b.
Sole Proprietorship
a.
b.
The sole proprietorship firm must be registered with, and authorized by, the
Bureau of Domestic Trade; and
c.
Partnership
a.
b.
The partnership firm must be registered with, and authorized to engage in the
particular type of consulting service/s by, the SEC; and
c.
Corporation
a.
At least sixty percent (60%) of the outstanding capital stock must be owned
by citizens of the Philippines;
b.
The corporation must be registered with and authorized by the SEC and
whose primary purpose is to engage in the particular type of consulting
service/s involved; and
c.
Joint Ventures are associations among Filipino consultants and among Filipino and
foreign consultants who may wish to complement their respective areas of expertise.
Such an association may be for the long term or for a specific assignment. All the
members of the association shall sign the contract and shall be jointly and severally
liable for the entire assignment.
Page 35 of 108
a.
At least sixty percent (60%) of the interest must be owned by citizens of the
Philippines; and
b.
The foreign consultant must be registered with the SEC and/or any agency authorized
by the laws of the Philippines;
2.
When the consulting services involve the practice of regulated professions, the foreign
consultant must be authorized by the appropriate Philippine government professional
regulatory body to engage in the practice of those professions and allied professions.
It must submit any registration, license or authority before it is awarded contract; and
3.
As a full-time consultant:
a.
ii.
A leave without pay shall not exceed one (1) year; and
Under IFI guidelines, the Procuring Entity should not require consultants to form associations with any specific firm or
group of firms, but may encourage association with qualified national firms.
Page 36 of 108
iii.
2.
b.
His being a consultant does not violate the rule against a government
employee holding multiple positions;
c.
d.
His being a consultant does not conflict or tend to conflict with his official
functions and the interest of the Republic of the Philippines.
As a part-time consultant:
a.
His being a consultant does not violate the rule against a government
employee holding multiple positions;
b.
c.
His being a consultant does not conflict or tend to conflict with his official
functions and the interest of the Republic of the Philippines; and
d.
His being a consultant does not affect the effective performance of his duty.
How can a Procuring Entity know if there are Filipino consultants that have
the expertise and experience it needs?
The GPPB recognizes an umbrella organization of Filipino consultants as the representative of
all Filipino consultants. It deals and consults with this organization on matters relative to the
consulting industry in the country. (IRR-A Section 24.6.1)
The umbrella organization will prepare and certify a list of fields wherein Filipino consultants
can provide competent consulting services. As proof of the availability of Filipino expertise, it
will also prepare a list of its members that have expertise in a specific field. It will list its
standards for competence in the field and certify that the members that it had listed had
passed such standards.
These documents will be submitted to the GPPB and all other concerned government
agencies. They will be updated at least annually, or as often as necessary. The GPPB will
then post these documents in the PhilGEPS.
The umbrella organizations certification and list of consultant-members will guide the BAC in
determining the fields where Filipino consultants are already qualified and capable, and thus
would not require foreign consultants. (IRR-A Section 24.6.2)
Page 37 of 108
pass/failcriteria, as stated in the IAEB and the ITB. Essentially, this means that the absence,
incompleteness or insufficiency of a document shall make a prospective bidder ineligible to bid
for the particular procurement.7 (IRR-A Section 23.2)
2.
3.
b.
Generally, FAPs do not utilize the eligibility check system of the GOP, unless so required by the pertinent IFI/bilateral
lending agency.
Page 38 of 108
c.
may not be awarded a contract, unless the conflict stemming from this relationship
has been resolved in a manner acceptable to the Procuring Entity throughout the
selection process and the execution of the contract.
Class A Documents
a.
b.
Legal Documents
i
ii
iii
iv
Tax Clearance Certificate issued by the BIR Main Office and Income or
Business Tax Returns filed through the EFPS (E.O. 398, s. 2005), if
applicable;
vi
which
contains
the
Taxpayers
Technical Documents
i
Page 39 of 108
Amount of contract;
Contract duration;
ii.
The types and number of equipment that the consultant owns, has
under lease, and / or has under purchase agreements, if any;
iii.
c.
Financial
Document
The
prospective
bidders
audited
financial statements,
stamped received
by the BIR or its duly
accredited
and
authorized
institutions, for the
immediately
preceding
calendar
year,
showing,
among others, the
consultants total and
Page 40 of 108
Class B Documents
a.
b.
Letter authorizing the Head of the Procuring Entity or his duly authorized
representative/s to verify any or all of the documents submitted for the
eligibility check.
Foreign consultants, when allowed to be under the law, must submit the same eligibility
requirements as local consultants. However, the legal documents and audited financial
statements under the Class A documents may be substituted by the appropriate equivalent
documents issued by the country of the foreign consultant. (IRR-A Section 24.8) These
documents must be duly acknowledged or authenticated by the Philippine consulate located in
that country.
3.
The consultant or its duly authorized representative shall certify under oath that each of the
documents submitted in satisfaction of the eligibility requirements is an authentic and original
copy, or a true and faithful reproduction or copy of the original, complete, and that all
statements and information provided therein are true and correct. (IRR-A Section 24.9)The
BAC may require that the bidders authorized representative should initial every page of the
documents it submits as originals. The purpose of this exercise is to ensure that the
documents reviewed by the BAC are authentic, and to protect the BAC from any insinuation of
tampering with the said documents.
A certification from the BAC of the Procuring Entity that it has a complete set of
updated Class A documents on file with the BAC;
2.
3.
Its certification under oath that each of the documents submitted in satisfaction of the
eligibility requirements is an authentic and original copy or a true and faithful
reproduction or copy of the original, complete and that all statements and information
provided therein are true and correct.
Page 41 of 108
Who are involved in the Receipt and Opening of the Eligibility Envelopes?
The following parties participate in the eligibility check/screening:
1. The BAC;
2. The TWG;
3. The Secretariat;
4. The prospective bidders; and
5. The Observers.
The BAC shall open in public the Eligibility envelopes on the date specified in the IAEB.
(IRR-A Section 24.10) The BAC shall read in public the contents of the Eligibility
envelopes, and shall examine each prospective bidders eligibility requirements or
statements. It shall record the presence or absence of eligibility documents in a
checklist.
This procedure is referred to as
Eligibility Check, the purpose of which is
to determine if a prospective bidder is
eligible to participate in the bidding at
hand.
In determining a prospective
bidders eligibility, the BAC shall use
non-discretionary pass/fail criteria, as
stated in the IAEB and the ITB.
Essentially,
this
means
that
the
absence, incompleteness or insufficiency
of a document shall make a prospective
bidder ineligible to bid for the particular
procurement. (IRR-A Section 24.12)
2.
Page 42 of 108
Eligibility and a Notice of Ineligibility which will be duly accomplished by the BAC
Secretariat and signed by the BAC members present during the Eligibility
Check/Screening. In case a prospective bidder is declared ineligible, the Notice of
Ineligibility shall state the reason for such ineligibility. The Notice will be received
officially by the bidders authorized representative.
3.
The BAC shall inquire from ineligible bidders whether or not they intend to file a
request for reconsideration; if they signify their intention to do so, the BAC shall
keep the eligibility envelopes containing the eligibility requirements and re-seal and
sign the same in the presence of all the participants. These shall be deposited in the
Bid Box or any other secured place or location. The BAC may return the eligibility
envelope if the prospective bidder is declared ineligible and expressly waives his
right to file a request for reconsideration. Such waiver shall be made in writing, to be
executed by the authorized representative of the ineligible bidder.
paper
shall
contain
the
1.
2.
3.
4.
Page 43 of 108
Page 44 of 108
Step 3
Legal Reference
IRR-A Section 24.15 specifies the rules in relation to the eligibility requirements for the
procurement of consulting services.
2.
2.
Rate each eligible consultant based on the following criteria, among others: (IRR-A
Section 24.15.3):
a.
b.
Qualification of principal and key staff of the consultant who may be assigned
to the job vis--vis extent and complexity of the undertaking (Recommended
weight: 30%); and
c.
Rank the eligible consultants based on the average of the rates given them by its
members;
As short listing methodologies may vary for specific FAPs, reference should be made to the appropriate standard
bidding documents for the project.
Page 45 of 108
3.
If the number of eligible consultants that got the minimum average rating for the
short list exceeds the predetermined number of the short list of consultants, those
obtaining the highest ranks shall be considered. If the number of eligible consultants
that got the minimum average rating required does not exceed the desired number of
the short list, the BAC shall consider all such consultants as being short listed. (IRR-A
Section 24.15.2)
4.
Recommend the short list of consultants to the Head of the Procuring Entity for
consideration and approval; (IRR-A Section 24.15.4) and
5.
If the Head of the Procuring Entity approves the recommendation, inform the short
listed consultants about the results of the short listing process. If the Head of the
Procuring Entity disapproves the recommendation, he must inform the BAC of the
reasons for the disapproval and instruct the BAC on the measures that ought to be
adopted.
How long shall the entire process of eligibility check and short listing take?
The entire process of eligibility check and short listing must not exceed twenty (20) calendar
days after opening the eligibility envelopes. (IRR-A Section 24.15.4)
Are disassociations
allowed?
and
associations
among
short
listed
consultants
No. A short listed association cannot disassociate from each other; otherwise, its members
should be rejected. Neither can a short listed firm be allowed to associate with any other
firm.
Page 46 of 108
Step 4
Legal Reference
IRR-A Section 17 provides the rules for the issuance of bidding documents.
How much must short listed consultants pay for the bidding documents?
The BAC must consider the cost recovery component in determining the price which short
listed consultants would have to pay for the bidding documents ensure that the same would
not have an effect of discouraging competition.
The cost recovery component may include the following:
1.
2.
b.
Reproduction costs, which are labor, supplies and equipment rental costs
incurred in the reproduction of the documents; and
c.
Communication costs, which include mail and fax costs, plus costs of
advertising, meetings, internet/web posting, and other costs incurred for the
dissemination of information about the bidding.
Page 47 of 108
(Note that Budget Circular No. 2004-5A was issued in accordance with Section 15 of
R.A. 9184.)
In practice, cost recovery entails getting the sum of Direct and Indirect Costs and dividing the
total by the expected number of prospective bidders who will purchase the bidding
documents. This number is an estimate derived from the initial survey of the industry
conducted by the procurement office/unit. The BAC is discouraged from using the cost of
bidding documents to limit the number of bidders. If the procurement involves a fairly large
project of a particular complexity, and project implementation requires a higher level of size
or capacity on the part of the consultant, it would be more advisable for the BAC to allow the
project requirements to naturally limit competition among eligible and short listed
consultants, by summarizing the qualification requirements in the IAEB and detailing these in
the bidding documents, rather than for the BAC to unilaterally increase the price of the
bidding documents and hope that this price discourages competition. As such, if the BAC
wants to encourage the participation of as many bidders as possible to create competition, it
should consider charging a lower price for the bidding documents, keeping in mind that this
price should be sufficient to recover the above-enumerated costs.
What are the responsibilities of a short listed consultant with regard to the
bidding documents?
A short listed consultant must be responsible for having: (IRR-A Section 17.7.1)
1.
2.
3.
Made an estimate of the facilities available and needed for the contract to be bid, if
any; and
4.
Complied with his responsibility as provided for under IRR-A Section 22.5.1, which
provides that it shall be the responsibility of all those who have properly secured the
bidding documents to inquire and secure supplemental/bid bulletins that may be
issued by the BAC.
Failure to observe any of the above responsibilities shall be at the risk of the short listed
consultant concerned. For this purpose, one of the contents of the technical proposal would
have to be a sworn statement executed by the said consultant attesting to these
responsibilities.
The Procuring Entity shall not be responsible for any erroneous interpretation or conclusions
by the bidders of the data it furnished. (IRR-A Section 17.7.3)
Moreover, the short listed consultants are deemed to have become familiar with all existing
Philippine laws, decrees, ordinances, acts and regulations that may affect the contract in any
way. However, if the contract is affected by new laws, ordinances, regulations or other acts
Page 48 of 108
of government promulgated after the date of the bidding, a contract price adjustment shall be
made or appropriate relief shall be applied on a no loss-no gain basis. (IRRA Section
17.7.4)
Page 49 of 108
Step 5
Legal Reference
IRR-A Section 22 specifies the rules in relation to the conduct of a pre-bid conference.
The BAC;
2.
3.
Page 50 of 108
4.
The observers;
5.
The end-user/PMO;
6.
7.
Short listed consultants may or may not attend the pre-bid conference. (IRR-A Section
22.2)
The presentation by the BAC of the eligibility requirements as well as the technical
and financial components of the contract to be bid, the evaluation procedure,
evaluation criteria, and possible causes of failure of the bidding.
2.
The recording by the BAC Secretariat of minutes of the pre-bid conference, and its
availability to all participants not later than three (3) calendar days after the pre-bid
conference. (IRR-A Section 22.3)
Page 51 of 108
A supplemental/bid bulletin must contain a brief but comprehensive and accurate summary of
the issue or issues that it wishes to address. If it was an eligible bidder that raised the issue
addressed by the bulletin, then it ought to contain a summary of that bidders request for
clarification and/or interpretation, without identifying the eligible bidder.
Bidders who have submitted bids before a supplemental/bid bulletin is issued have to be
informed in writing and allowed to modify or withdraw their respective bids. (IRR-A Section
22.5.2)
The BAC;
2.
3.
4.
The BAC Secretariat and/or the TWG drafts the supplemental/bid bulletin for approval
by the BAC.
2.
The BAC approves the supplemental/bid bulletin and the BAC Chairman signs it.
3.
The BAC Secretariat sends copies of the supplemental/bid bulletin to all short listed
consultants who have properly secured or purchased the bidding documents, within
the period prescribed above.
4.
The BAC Secretariat posts the supplemental/bid bulletin in the PhilGEPS, the website
of the Procuring Entity and that of the latters electronic procurement system
provider, if any, within the same period prescribed in number (3) above.
The short listed consultant submits to the BAC, through the BAC Secretariat, a written
request for clarification, within the period prescribed above.
2.
The BAC directs the BAC Secretariat and/or the TWG to study the request for
clarification.
3.
The TWG, BAC and BAC Secretariat perform the steps undertaken in the issuance of
the supplemental/bid bulletin issued at the initiative of the BAC.
Page 52 of 108
Step 6
Receive and
Envelopes
Open
the
Technical
and
Financial
Legal Reference
IRR-A Sections 25 to 31 specify the rules in relation to the submission and receipt of bids.
What is a Bid?
A Bid refers to a signed offer or proposal to undertake a contract submitted by a short listed
consultant in response to, and in consonance with, the requirements stated in the bidding
documents. Bid is also equivalent to and may be used interchangeably with Proposal and
Tender. A Bid has two components, the Technical Proposal or the Technical Bid, and
the Financial Proposal or the Financial Bid. The Technical and Financial Bids must each
be contained in separate sealed bid envelopes.
should
contain,
at
the
minimum,
the
following
technical
1.
The bid security in its required form, amount and validity period;
2.
Authority of the signatory to sign on behalf of the bidder, all documents pertaining to
the bid and the contract, which must be contained in a Board Resolution if the bidder
is a corporation or a cooperative, a Joint Venture Resolution if the same is a Joint
Venture, a Partnership Resolution if the bidder is a Partnership, or a Special Power of
Attorney (SPA) issued by the General Manager or Proprietor if the bidder is a sole
proprietor;
3.
4.
5.
Approach, work plan, and schedule, provided that for architectural design, submission
of architectural plans and designs shall not be required during the consultants
selection process;
6.
List of key personnel to be assigned to the contract to be bid with their curriculum
vitae indicating their relevant qualification, experience data and signed written
commitment to work for the project once awarded the contract;
7.
Certificate from the bidder under oath of its compliance with existing labor laws and
standards;
8.
A sworn affidavit of compliance with the Disclosure Provision under Section 47 of R.A.
9184 and its IRR-A in relation to other provisions of R.A. 3019;;
9.
A sworn statement by the bidder attesting to have complied with the responsibilities
enumerated under IRR-A Section 17.7.1, particularly that the bidder has taken steps
to carefully examine all of the bidding documents, has acknowledged all conditions,
local or otherwise, affecting the implementation of the contract, has made an estimate
of the facilities available and needed for the contract to be bid, and has complied with
its responsibility of inquiring and securing all supplemental/bid bulletins issued by the
BAC; and
Page 53 of 108
10.
Remuneration cost indicating the basic salary, overhead cost, social charges,
management fee and billing rate;
2.
3.
The financial proposal should clearly estimate the value added tax, income tax, local taxes,
duties, fees, levies and other charges, as applicable.
What happens if only one short listed consultant submits a bid envelope?
Even if only one short listed consultant submits a bid envelope, the bidding process continues.
If its bid is found to be responsive to the bidding requirements, its bid will be declared as a
SRRB and considered for contract award. (IRR-A Section 36 [c])
Page 54 of 108
If no short listed bidder submits a bid, the BAC should declare the bidding a failure. In such a
case, the BAC shall issue a Resolution declaring a failure of bidding. The BAC then reviews the
terms and conditions stated in the IAEB. If warranted, it changes any of the terms and
conditions,
including
the
quantities
or
specifications, provided that the ABC is left
unchanged. It must, thereafter, conduct a reTIPS: Lets make things
bidding, in the process formulating a new IAEB
easier
and posting and publishing this as required.
(IRR-A Section 35)
All bidders that have
The BAC shall require one (1) original
initially responded to the IAEB in the first bidding
and at least two (2) duplicate copies
shall be allowed to submit new bids.
of the Technical Documents and
Financial Documents. The original
If the original estimate is found to be
copy will be the one initialed by the
inadequate on reassessment to meet the
BAC members or their authorized
objectives of the project, it may be necessary to
representatives and will be kept by
reduce the scope of the project.
the BAC Secretariat for check and
balance purposes while the duplicate
Should a second failure of bidding occur and the
copies will be the ones used during
Procuring Entity finds that there is a need to
Bid Evaluation.
evaluate the responsiveness of the ABC, and so
decides to revise the ABC accordingly, the
Procuring Entity should conduct another public
bidding with re-advertisement and/or posting. Alternatively, the Procuring Entity may enter
into a negotiated procurement with a legally, technically, and financially capable consultant.
(IRR-A Sections 35.3 and 53)
However, if the Procuring Entity resorts to negotiated
procurement, the terms, conditions, and specifications of the project as well as the ABC must
be maintained.
The BAC;
2.
3.
4.
Page 55 of 108
2.
The BAC convenes on the Bid Opening Date. The presence of the majority of the BAC
members shall constitute a quorum, provided that the chairperson or the vicechairperson is present.
3.
The BAC
specified
technical
envelope
receives the technical and financial envelopes at the time, date and place
in the bidding documents. Upon receipt of the envelope containing the
and financial envelopes, the BAC shall stamp on the face of the outer
the date and the time of receipt thereof.
4.
Normally, the opening of the technical envelope starts about thirty (30) minutes after
the deadline for the deadline for the submission and receipt of bids.
The order of opening is as follows:
5.
a.
b.
The letters of short listed consultants that decide to withdraw the bids that
they have submitted earlier than the deadline;
c,
The letter of short listed consultants that decide to modify their bids that they
have submitted earlier than the deadline, followed by the opening of their
technical envelopes; and
d.
The technical envelopes of short listed consultants that have submitted bids
on the deadline itself.
6.
All members of the BAC, or their duly authorized representatives who are present
during bid opening, shall initial every page of the original copies of all bids received
and opened. (IRR-A Section 29)
Page 56 of 108
7.
The financial envelopes of all short listed consultants must remain sealed and secured.
8.
All technical envelopes must be resealed. Those rated passed will be secured in
preparation for the detailed technical evaluation (which normally starts the following
day). Those rated failed will be secured for purposes of potential filing of motion for
reconsideration.
9.
The BAC Secretariat shall record the proceedings using an electronic tape recorder, or
a video recorder. The minutes of the bid opening should be prepared within three (3)
calendar days after the bid opening date, so that copies thereof could immediately be
sent to the BAC members, Observers, Bidders and other interested parties. Copies of
the minutes shall also be made available to the public upon written request and
payment of a specified fee to recover cost of materials.
What happens if a short listed consultant has failed to comply with the
Technical requirements of the Bid?
The short listed consultant that has failed to comply with any of the technical requirements of
the Bid will be disqualified by the BAC. Similar to ineligible bidders, it may file a written
request for reconsideration but only within three (3) calendar days from the receipt of the
communication regarding its bids deficiency. (IRR-A Section 30.3)
In case a bidder is determined to have failed in the first envelope, which contains the
Technical Proposal, and it signifies its intention to file for a request for reconsideration, the
BAC must hold this bidders second envelope unopened until the request for reconsideration
has been resolved. (IRR-A Section 30.3)
Page 57 of 108
What happens if no
examination of bids?
short listed
If no short listed consultant passes the preliminary examination of bids, there is a failure of
bidding and the BAC should declare such a failure. As with other failures of bidding, the BAC
must then review the terms and conditions stated in the IAEB, changing any of such terms
and conditions if needed. It may wish to change the cost estimates; however, it must do so
without changing the ABC. It then must conduct a re-bidding, in the process formulating a
new IAEB and advertising and posting this as required. (IRR-A Section 35)
If a second failure of bidding occurs, the Procuring Entity finds that there is a need to evaluate
the responsiveness of the ABC, and decides to revise the ABC accordingly, the Procuring
Entity should conduct another public bidding wit re-advertisement and/or posting. However, if
the Procuring Entity resorts to negotiated procurement, the terms, conditions and
specifications of the project as well as the ABC must be maintained
Page 58 of 108
Step 7
Legal Reference
IRR-A Section 33 specifies the rules in relation to bid evaluation.
After the preliminary examination of the Technical Proposals, the BAC will conduct the
detailed evaluation of the Technical Proposals. Normally, the BAC members are given each a
copy of all the technical envelopes of each bidder whose technical envelope has been rated
passed. This is why the bidders are asked to submit several copies of the envelopes, so
that each member of the BAC may be given his own copy. The BAC agrees on when to meet
again to discuss the ratings that they will give each technical envelope.
The detailed evaluation of the bids of the short listed consultants using numerical
ratings based on either the Quality-Based Evaluation procedure or the Quality-Cost
Based Evaluation procedure; and
2.
The ranking of the bidders based on the numerical ratings from the highest to the
lowest.
2.
Where the assignment can be carried out in substantially different ways, such that the
proposals are not comparable.
Page 59 of 108
The table below illustrates how the highest and lowest rates are disregarded in calculating the
average rate of proposals.
Evaluators
A
B
C
D
E
Average
Rank
Firm A
95
84
84
83
84
84
3
Firm B
75
88
86
85
87
86
1
Firm C
84
86
85
84
86
85
2
Firm D
83
81
79
79
80
80
5
Firm E
84
82
84
82
83
83
4
If the highest and lowest rates were not eliminated, the example below will show that the
scores of Evaluator A, which appears to be biased for Firm 1, would have unduly placed Firm
1 at an advantage.
Evaluators
A
B
C
D
E
Average
Rank
2.
Firm A
95
84
84
83
84
86
1
Firm B
75
88
86
85
87
84.2
3
Firm C
84
86
85
84
86
85
2
Firm D
83
81
79
79
80
80.4
5
Firm E
84
82
84
82
83
83
4
The BAC evaluates the Technical Proposal based upon the criteria set forth.
2.
The BAC ranks the consultants in descending order based upon the numerical ratings
of their Technical Proposals and identifies the HRB, which should have passed the
minimum technical rating. (IRR-A Section 33.4.1)
3.
The BAC submits the results of the evaluation, including the rankings and the
consultant with the HRB, to the Head of the Procuring Entity, who must approve or
disapprove the recommendations of the BAC within two (2) calendar days after receipt
of such results.
4.
If the Head of the Procuring Entity disapproves the BAC recommendations, he shall
inform the BAC of its disapproval and the reasons for it, and shall instruct the BAC on
the subsequent steps to be adopted.
5.
If the Head of the Procuring Entity approves the recommendations of the BAC, the
BAC furnishes all participating short listed consultants with the results of its evaluation
(ranking and total scores only). The results must also be posted in the PhilGEPS and
the website of the agency for a period of not less than two (2) weeks, to make these
results available to the GPPB and the umbrella organization of consultants. (IRR-A
Section 33.3.6)
6.
Within seven (7) days of the approval of its recommendations, the BAC invites the
consultant with the HRB for the opening of its financial proposals and for contract
The steps may vary for FAPs, and so reference should be made to the appropriate standard bidding documents for the
project.
Page 60 of 108
negotiations. In its letter of notification, the BAC shall inform the consultant of the
issues in the Technical Proposal the BAC may wish to be clarified on during
negotiations. (IRR-A Section 33.4.2)
The BAC evaluates the Technical Proposals of all short listed consultants that
submitted bids.
2.
The BAC ranks all the Technical Proposals, noting those that have earned ratings
above the minimum requirement and those that have not.
3.
The BAC sends a formal letter to all consultants whose Technical Proposals earned
ratings below the minimum required rating, informing them of their failure to qualify
and returning to them their Financial Proposal unopened.
4.
The BAC sends a formal letter to all consultants whose Technical Proposals earned at
least the minimum required rating, informing them thereof and of the date, time, and
venue of the opening of the Financial Proposals. The methodology to be used in the
evaluation of the financial proposal shall be described in the ITB.
5.
On the day, time and venue set, the BAC opens the Financial Proposals of the
qualified consultants in public, and records the proposed prices of each qualified
consultant. If the proposed price exceeds the ABC, the bidder will be disqualified.
6.
The BAC reviews each Financial Proposal, checks for its completeness, corrects any
arithmetical errors, and corrects the recorded proposed prices, if warranted.
7.
8.
a.
It provides for a required item but does not indicate a price for it and is thus
deemed as non-compliant, except that if it specifies a 0 (zero) or a -
(dash) for the said item, it would be deemed as having offered the item for
free to the government, and
b.
The BAC computes the ratings of each Financial Proposal in the following manner:
a.
b.
The scores of the other consultants will be computed using the formula:
Sf = 100 x Fl/F
In which Sf is the financial score, Fl is the lowest Financial Proposal and F is
the Financial Proposal under consideration.
Example:
Firm
A
B
C
D
E
Financial Score
P 1,000,000 / P
P 1,000,000 / P
P 1,000,000 / P
P 1,000,000 / P
P 1,000,000 / P
10
1,100,000
1,000,000
1,500,000
1,300,000
1,200,000
=
=
=
=
=
90.9 points
100 points
66.7 points
76.9 points
83.0 points
The steps may vary for FAPs, and so reference should be made to the appropriate standard bidding documents for the
project.
Page 61 of 108
9.
The BAC gives corresponding weights to the Financial and Technical Proposals of the
qualified consultants, the weights having been determined in the pre-bid conference
and indicated in the IAEB and the bidding documents. The financial proposal may be
given a weight of fifteen percent (15%) up to a maximum of forty percent (40%).
10.
The BAC adjusts the weight of the technical criteria such that their total weight in
percentage terms, together with the weight given to the Financial Proposal, shall be
equivalent to one hundred percent (100%).
11.
The BAC multiplies the average score of each qualified consultants Technical Proposal
with the percentage value allowed as weight for Technical Proposals. It also multiplies
the rate earned by each consultants Financial Proposal with the percentage value
allowed as weight for Financial Proposals. It then adds the resulting products of both
operations for each consultant. The sum becomes the total score for the consultant.
The formula is as follows:
S = St x T% + Sf x F%
Where:
S is the Total Score;
St is the Technical Score;
Sf is the Financial Score;
T is the weight given to the Technical Proposal; and
F is the weight given to the Financial Proposal.
Example:
Firm
A
B
C
D
E
Ave.
Score
86
84.2
85
80.4
83
Technical Proposal
Weight
Weighted
Score
X 70% or 0.7
= 60.2
X 70% or 0.7
= 58.9
X 70% or 0.7
= 59.5
X 70% or 0.7
= 56.4
X 70% or 0.7
= 58.1
Score
90.9
100
66.7
76.9
83
Financial Proposal
Weight
X
X
X
X
X
30%
30%
30%
30%
30%
or
or
or
or
or
0.3
0.3
0.3
0.3
0.3
=
=
=
=
=
Weighted
Score
27.3
30
20
23.1
24.9
Total
Score
87.5
88.9
79.5
79.4
83
12.
The BAC ranks the consultants in descending order, with the consultant obtaining the
highest total score being declared as the bidder with the HRB. (IRR-A Section 33.5)
13.
The BAC submits the results of its evaluation to the Head of the Procuring Entity,
identifying the consultant with the HRB, and recommending that it be authorized to
negotiate with this consultant.
14.
The Head of the Procuring Entity approves or disapproves the recommendations of the
BAC within two (2) calendar days after receiving these from the BAC.
15.
If the Head of the Procuring Entity disapproves the recommendation, he shall state
the reason(s) for the disapproval and instruct the BAC on the subsequent steps to be
adopted. If the Head of the Procuring Entity approves the recommendations, the BAC
furnishes all participating short listed consultants with the results of its evaluation
(ranking and total scores only). The results must also be posted in the PhilGEPS and
the website of the agency for a period of not less than two (2) weeks, to make these
results available to the GPPB and the umbrella organization of consultants. (IRR-A
Section 33.3.6)
16.
Within three (3) calendar days of the approval of its recommendations, the BAC
invites the consultant with the HRB for the opening of its financial proposals and for
contract negotiations. In its letter of notification, the BAC shall inform the consultant
of the issues in the technical proposal the BAC may wish to be clarified on during
negotiations. (IRR-A Section 33.4.2)
Manual of Procedures for the Procurement of Consulting Services
Page 62 of 108
The BAC;
2.
The TWG;
3.
4.
The Observers.
What happens if no bid passes the minimum technical rating for QCBE?
If no bid passes the minimum technical rating for QCBE, the BAC should declare the bidding a
failure. In such a case, the BAC shall issue a resolution declaring a failure of bidding. The BAC
then reviews the terms and conditions stated in the IAEB. If warranted, it changes any of the
terms and conditions, including the quantities or specifications, provided that the ABC is left
unchanged. It must, thereafter, conduct a re-bidding, in the process formulating a new IAEB
and posting and publishing this as required. (IRR-A Section 35) All bidders that have
initially responded to the IAEB in the first bidding shall be allowed to submit new bids.
If the original estimate is found to be inadequate on reassessment to meet the objectives of
the project, it may be necessary to reduce the scope of the project.
Should a second failure of bidding occur and the Procuring Entity finds that there is a need to
evaluate the responsiveness of the ABC, and so decides to revise the ABC accordingly, the
Procuring Entity should conduct another public bidding with re-advertisement and/or posting.
Alternatively, the Procuring Entity may enter into a negotiated procurement with a legally,
technically, and financially capable consultant. (IRR-A Sections 35.3 and 53) However, if
the Procuring Entity resorts to negotiated procurement, the terms, conditions, and
specifications of the project as well as the ABC must be maintained.
Page 63 of 108
Step 8
Legal Reference
IRR-A Section 33 provides the rules for the conduct of negotiations.
BAC;
2.
3.
4.
Discussion and clarification of the TOR and Scope of Services, provided that if changes
in the TOR become necessary, the cost of these changes shall be within the ABC;
2.
Discussion and finalization of the methodology and work program proposed by the
consultant;
3.
4.
5.
Discussion on the financial proposal submitted by the consultant (Note that if the
proposed price is greater than the ABC, the bidder will be disqualified); and
6.
For contracts awarded using the QCBE procedure, all the matters covered in the negotiations
for contracts using the QBE procedure are also covered, except for the discussion on the
Financial Proposal of the consultant. The financial bid, including the proposed remuneration
rates for staff and the reimbursables, shall not be negotiated since it has already been a
factor in the selection of the consultant.
Page 64 of 108
What happens if negotiations with the bidder with the Highest Rated Bid
fail?
If agreement on all items discussed during negotiations is not possible between the BAC and
the first-in-rank consultant, the BAC would have to terminate negotiations and invite the next
ranked consultant for negotiations. The procedure for negotiations, as described above, shall
be repeated until negotiation with a consultant is successfully completed.
What additional
negotiations?
1.
guidelines
may
Procuring
Entity
adopt
during
Negotiations should include discussions of the TOR, the methodology, staffing, the
Procuring Entitys inputs, and special conditions of the contract. The Procuring Entity
should give the consultants adequate authority to discharge their responsibilities and
carry out the terms of their contract.
Page 65 of 108
2.
The discussions should not substantially alter the original TOR or the terms of the
contract, lest the quality of the final product, its cost, and the relevance of the initial
evaluation be affected.
3.
Major reductions in work inputs should not be made solely to meet the budget.
4.
The final TOR and the agreed methodology should be incorporated in the description
of services, which should form part of the contract.
5.
The selected firm should not be allowed to substitute key staff, unless both parties
agree that undue delay in the selection process makes such substitution unavoidable
or that such changes are critical to meet the objectives of the assignment. If this is
not the case and if it is established that key staff were included in the proposal
without confirming their availability, the firm may be disqualified and the process
continued with the next ranked firm. The key staff proposed for substitution should
have qualifications equal to or better than the key staff initially proposed.
6.
Financial negotiations should include clarification of the consultants tax liability in the
Procuring Entitys country (if any) and how this tax liability has been or would be
reflected in the contract.
7.
8.
In the case of Time-based Contracts, payment is based on inputs (staff time and
reimbursables) and the offered price should include staff rates and an estimation of
the amount of reimbursables. When the selection method includes price as a
component, negotiations of staff rates should not take place, except in special
circumstances, like for example, staff rates offered are much higher than typically
charged rates by consultants for similar contracts. Consequently, the prohibition of
negotiation does not preclude the right of the client to ask for clarifications, and, if
fees are very high, to ask for change of fees.
9.
10.
If the negotiations fail to result in an acceptable contract, the Procuring Entity should
terminate the negotiations and invite the next ranked firm for negotiations.
11.
Once negotiations are commenced with the next ranked firm, the Procuring Entity
should not reopen the earlier negotiations.
12.
After negotiations are successfully completed, the Procuring Entity should promptly
notify other firms on the short list that they were unsuccessful.
Page 66 of 108
Step 9
Post-qualify
Legal Reference
IRR-A Section 34 specifies the rules for post qualification.
Legal Requirements. The post-qualification process under this criterion involves the
verification, validation and ascertaining of the consultants claim that it is not included
in any government blacklist, as well as all the licenses, permits and other
documents it submitted, including the following:
a.
b.
c.
d.
e.
f.
Authority of signatory.
The bidders status with regard to blacklisting may be verified by checking the
Consolidated Blacklisting Report issued by the GPPB, or the blacklist of any
government agency.
2.
Technical Requirements. Post-qualification under this criterion means that the BAC
would have to verify, validate and ascertain the veracity of the documents submitted
by a consultant to prove compliance of the consulting services it offers with the
requirements of the contract and bidding documents. These documents include:
a.
Documents proving the bidders stated competence and experience, and the
competence and experience of the bidders key personnel to be assigned to
the project, such as:
i.
Page 67 of 108
ii.
3.
b.
c.
The Bid Security, specifically on its sufficiency as to type, amount, form and
wording, and validity period.
Financial Requirements. Post-qualification under this criterion means that the BAC
would have to verify, validate and ascertain the audited financial statements and the
financial proposal.
The BAC;
2.
3.
4.
The BAC/TWG verifies, validates, and ascertains the genuineness, validity and
accuracy of the legal, technical and financial documents submitted by the consultant
with the HRB, using the non-discretionary criteria described above.
In verifying the information contained in such documents, the TWG may make
inquiries with appropriate government agencies and examine the original documents
kept in the bidders place of business. The use of other means for verification and
validation of such documents may be resorted to by the TWG, such as the Internet
and other research methods that yield the same results.
2.
The BAC/TWG inquires about the consultants performance in relation with other
contracts/transactions as indicated in its eligibility statement (statement of on-going,
completed or awarded contracts).
3.
4.
5.
The BAC determines whether the consultant with the HRB passes all the criteria for
post-qualification.
Manual of Procedures for the Procurement of Consulting Services
Page 68 of 108
6.
If the HRB passes the post-qualification, the BAC declares it as the HRRB.
7.
After the BAC has determined the HRRB, the Secretariat, with the assistance of the
TWG, if necessary, prepares the BAC Resolution declaring the HRRB and the
corresponding Notice to the said bidder informing it of its post-qualification.
What happens if a bidder or its employees is related within the third civil
degree of consanguinity to the Head of the Procuring Entity or any of
officials of employees of the Procuring Entity with direct access to
information that my substantially affect the results of the bidding?
Such a bidder will be disqualified by the BAC. (IRR-A Section 47)
Page 69 of 108
Page 70 of 108
Step 10
Legal Reference
IRR-A Section 37 specifies the rules and guidelines for the awarding of contract.
2.
The BAC;
3.
4.
5.
6.
The Observers.
Page 71 of 108
The BAC Secretariat consolidates all the documents and/or records of the proceedings
of the BAC with regard to the procurement at hand.
2.
3.
The BAC approves and signs the Resolution Recommending Award, and transmits the
same to the Head of the Procuring Entity or his or her duly authorized representative.
4.
The Head of the Procuring Entity, or his/her duly authorized representative, acts on
the recommendation for award within fifteen (15) calendar days from the date of
determination and declaration by the BAC of the HRRB/SRRB. In the case of GOCCs
and GFIs, the governing Board shall have thirty (30) calendar days within which to
approve the recommendation for award.
5.
In case of approval of the recommendation, the Head of the Procuring Entity, through
the procurement unit/office, issues the Notice of Award to the bidder with the
HRRB/SRRB while the BAC accordingly notifies the losing bidders. In case of a
disapproval of the recommendation of award, the Head of the Procuring Entity shall
state the reason(s) for disapproval and instruct the BAC on the subsequent steps to
be adopted.
6.
What happens if the bidder being considered for award does not accept the
award?
If the bidder refuses to accept the award within the bid validity period, the BAC shall
forfeit the bid security of the bidder and shall initiate the blacklisting proceedings in
accordance with the Uniform Guidelines for Blacklisting (GPPB Resolution No. 092004). It then initiates and completes the post-qualification of the bidder with the second
highest rated bid. If found qualified, the said bidder shall be awarded the contract. This
procedure is repeated until the HRRB is determined. Should all eligible bidders fail postqualification, the BAC must declare the bidding a failure.
Refusal to accept an award, without just cause or for the purpose of forcing the Procuring
Entity to award the contract to another bidder, if proven, is meted with a penalty of
imprisonment of not less than six (6) years and one (1) day by not more than fifteen (15)
years. (IRR-A Section 65.3.4) Additional penalties of suspension for one (1) year from
participation in government procurement for the first offense, and suspension for two (2)
years for the second offense shall also be imposed on the bidder. (IRR-A Section 69.1)
Page 72 of 108
Step 11
Legal Reference
IRR-A Section 37 specifies the rules regarding contract signing and approval.
When must the winning bidder and the Procuring Entity enter into a
contract?
The winning bidder and the Procuring Entity must enter into a contract immediately after the
former has submitted the performance security and all other documentary requirements
within the period specified in the IRR-A. The parties must sign the contract within ten (10)
calendar days from receipt by the winning bidder of the Notice of Award. (IRR-A Section
37.3)
The Chief Accountant or the Chief Budget Officer may sign the contract as an instrumental
witness thereto.
The Procuring Entity signatory is encouraged to sign within the same day as the signing of the
bidder as there are penalties against delaying, without justifiable cause, the award of the
contract. (IRR-A Section 65.1) Moreover, it would be best for the winning bidder and the
Head of the Procuring Entity, or its appropriate signing authority, to sign/execute the contract
together provided that all contract documents and requirements are complete so that both
may personally appear before a Notary Public.
Page 73 of 108
Who are the Parties involved in Contract Signing and Approval and Issuance
of the NTP?
The following Parties are involved in the signing and approval of the contract, and in the
issuance of the NTP:
1.
2.
The Head of the Procuring Entity and/or higher contract approving authority; and
3.
2.
Conditions of Contract;
3.
Terms of Reference;
4.
Drawings/Plans, if applicable;
5.
Specifications, if applicable;
6.
IAEB;
7.
Bidding Documents;
8.
9.
Bid form including all the documents/statements contained in the winning bidders two
bidding envelopes, as annexes;
10.
11.
Performance Security;
12.
13.
Other contract documents that may be required by existing laws and / or the
Procuring Entity concerned.
The winning bidder submits all the documentary requirements, including the
performance security, and signs the contract.
2.
The procurement unit/office transmits the contract and its attachments to the Budget
Office (for issuance of OS) and the Chief Accountant (for issuance of the CAF).
3.
The OS;
b.
The CAF;
c.
Page 74 of 108
d.
e.
f.
Other pertinent documents that may be required by existing laws and/or the
Procuring Entity concerned.
4.
5.
6.
7.
What are the rules governing the review and approval of government
contracts?
Executive Order 423, s. 2005, prescribes the rules and regulations on the review and approval
of government contracts.
Essentially, E.O. 423 provides that, except for government
contracts required by law to be acted upon and/or approved by the President, the Head of the
Procuring Entity shall have full authority to give final approval and/or enter into all
government contracts of his respective government agency, awarded through public bidding,
regardless of amount. Provided, that the Head of the Procuring Entity certifies under oath
that the contract has been entered into in faithful compliance with all applicable laws and
regulations. The head of a Procuring Entity may also delegate in writing this full authority to
give final approval and/or enter into government contracts awarded through public bidding as
Manual of Procedures for the Procurement of Consulting Services
Page 75 of 108
An opinion from the GPPB that said Government contract falls within the exceptions
from public bidding; and
2.
Except for Government contracts required by law to be acted upon and/or approved by the
President, the Head of the Procuring Entity, after obtaining the foregoing requirements, shall
have full contracts of their his respective agency, entered into through alternative methods of
procurement allowed by law. Provided, that the head of the procurement entity certifies under
oath that the contract has been entered into in faithful compliance with all applicable laws and
regulations.
2.
3.
Upon conviction, it will suffer the penalty of imprisonment of not less than six (6) and
one (1) day and not more than fifteen (15) years; and
4.
For its part, the BAC must initiate and complete the post-qualification of the bidder with the
second HRB. This procedure must be repeated until the HRRB is determined for award. If no
bidder passes post-qualification, the BAC declares the bidding a failure and conducts a rebidding with re-posting and re-advertisement. Should there be another failure of bidding
after the conduct of the re-bidding, the Procuring Entity may enter into a negotiated
procurement. (IRR-A Section 40.2)
If, on the other hand, the bidder that fails to post the performance security and sign the
contract happens to be one with the SRRB, the BAC must declare the bidding a failure. It
then conducts a re-bidding with re-posting and re-advertisement. Should there be another
failure of bidding after the conduct of the re-bidding, the Procuring Entity may enter into a
negotiated procurement (IRR-A Section 40.3)
Page 76 of 108
What happens if the failure of the bidder with the HRRB/SRRB to sign the
contract within the prescribed period is not its own doing?
If the failure of the bidder with the HRRB or SRRB to sign the contract within the prescribed
period is not due to its fault, the sanctions mentioned above shall not be imposed. (IRR-A
Section 40.1)
Page 77 of 108
Reservation Clause
Legal Reference
IRR-A Section 41 provides the rules governing the Reservation Clause.
When may the Procuring Entity exercise its right to reject bids, declare a
failure of bidding, or not award the contract?
The Procuring Entity reserves the right to reject any and all bids, declare a failure of bidding,
or not award the contract in any of the following situations:
1.
2.
3.
For
any
justifiable
and
reasonable ground where the
award of the contract will
not
redound
to
the
benefit
of
the
Government as follows:
not
a.
b.
If the project is no
longer necessary as determined by the Head of the Procuring Entity; and
c.
If the source of funds for the project has been cancelled, withheld or reduced
through no fault of the Procuring Entity.
However, abuse by the Head of the Procuring Entity of his power to reject any and all bids as
provided by the Reservation Clause, with manifest preference to any bidder who is closely
related to him in accordance with IRR-A Section 47 shall be meted with penalties provided in
IRR-A Section 65. (IRR-A Section 65.1.5)
SECTION 3
PROCUREMENT
ALTERNATIVE
METHODS
OF
Page 81 of 108
There is prior approval of the Head of the Procuring Entity on the use of alternative
methods of procurement, as recommended by the BAC; and
2.
The conditions required by law for the use of alternative methods are present.
One of the reasons for the use of alternative methods of procurement is for administrative
convenience. This means that the Procuring Entity is given the opportunity to procure
consulting services at advantageous terms without having to undergo the entire public bidding
process which could be time-consuming. Or, there could be changes in circumstances that
preclude the use of public bidding as originally proposed in the APP, like in those cases where
the BAC has twice declared a failure of bidding.
In resorting to any of the alternative methods of procurement, the Procuring Entity must
ensure that the method chosen promotes economy and efficiency, and that the most
advantageous price for the government is obtained.
While the law allows the use of alternative methods or procurement, it emphasizes that
splitting of government contracts is not allowed. (IRR-A Section 54.1) There is splitting of
government contracts when, for the purpose of evading or circumventing the requirements of
law and the IRR-A, especially the necessity of public bidding and the requirements for the
alternative methods of procurement, the Procuring Entity:
1.
2.
Thus, the amount indicated in the ABM/SARO (or the equivalent documents in GOCCs/LGUs)
shall not be divided into several projects for bidding.
For the procurement of consulting services, negotiated procurement and limited source
bidding are the only alternative methods of procurement that may be used.
Page 82 of 108
2.
The BAC;
3.
The TWG;
4.
5.
6.
The Observers.
Page 83 of 108
The end-user secures the list of pre-selected consultants from the GPPB or from the
relevant government authority that has expertise in the type of procurement at hand.
2.
3.
The BAC recommends to the Head of the Procuring Entity the use of limited source
bidding method for the particular procurement through a Resolution to be approved
by the Head of the Procuring Entity.
4.
The Head of the Procuring Entity decides whether or not to approve the same.
5.
If the Head of the Procuring Entity disapproves of the recommendation, he shall state
the reason(s) for disapproval and instruct the BAC on the subsequent steps to be
adopted. If the recommendation is approved, the BAC, through the TWG and the BAC
Secretariat, finalizes the bidding documents, including the IAEB (indicating therein the
method of procurement to be used) and the TOR, in accordance with the procedures
laid down in the IRR-A, this Manual and the PBDs. It also informs the pre-selected
consultants that they are being considered for the project.
6.
The BAC, through the Secretariat, posts for information purposes the IAEB in:
a.
The PhilGEPS;
b.
The website of the Procuring Entity and its electronic procurement service
provider, if any; and
c.
Continuously for a period of seven (7) calendar days prior to the opening of the bids.
7.
The BAC Secretariat sends the IAEB to the pre-selected consultants. The IAEB is sent
to ALL consultants in the list.
8.
The pre-selected consultants are expected to inform the BAC if they are interested in
participating in the project or not. If interested, a pre-selected consultant will have to
submit its LOI.
9.
The BAC issues an RFP to the consultants that have submitted the LOI. This RFP must
already contain the relevant information that would enable the consultants to prepare
their bids.
10.
The BAC conducts a pre-bid conference (if deemed warranted under the
circumstances), and require the simultaneous submission of the prospective bidders
eligibility/qualification statements, and technical and financial bids on or before the
deadline indicated in the bidding documents. The BAC then proceeds with the
eligibility check, bid evaluation, negotiation, post-qualification, contract award, signing
and approval, following the procedures for Competitive Bidding.
Are bid and performance securities also required for this method of
procurement?
Yes, these are required.
Page 84 of 108
There has been a second failure of public bidding as provided in IRR-A Section 35, in
which case, the negotiation must be made with a consultant in good standing and
with proven track record with the Procuring Entity or other government agencies;
2.
There exists imminent danger to life or property during a state of calamity, or when
time is of the essence arising from actual or man-made calamities or other causes
where immediate action is necessary to prevent damage to or loss of life or property,
or to restore vital public services, infrastructure facilities and other public utilities.
3.
The
subject
contract
to
be
negotiated has a
scope of work that
is similar or related
to
that
of
the
original contract;
c.
d.
The
amount
involved does not
exceed the amount
of
the
ongoing
project; and
e.
original
is
the
of
a
competitive
bidding;
The
contract
result
In such instances, negotiations for the procurement must be commenced before the
expiry of the original contract. (IRR-A Section 53 [d]) This negotiated contract can
only be undertaken once for a particular ongoing project.
Page 85 of 108
5.
6.
b.
Where the procurement does not fall under Shopping in Section 52(a) of the IRR-A
and amounts to Fifty Thousand Pesos (P50,000) and below, provided that the
procurement does not result in splitting of contracts.
With whom can a Procuring Entity negotiate for projects located in areas
where a state of calamity exists?
For projects in areas where a state of calamity exists, the Procuring Entity can negotiate with
a previous consultant of good standing with it, or with a consultant of good standing situated
within the vicinity where the calamity or emergency occurred. (IRR-A Section 54.2 [d])
2.
The BAC;
3.
The TWG;
4.
5.
6.
7.
The Observers
Page 86 of 108
1.
2.
The BAC recommends to the Head of the Procuring Entity the use of the negotiated
procurement method through a Resolution to be approved by the Head of the
Procuring Entity.
3.
The Head of the Procuring Entity decides whether or not to approve the
recommendation.
4.
If the Head of the Procuring Entity disapproves of the recommendation, he shall state
the reason(s) of this disapproval and instruct the BAC on the subsequent steps to be
adopted. If its recommendation is approved, the BAC, through the TWG and the BAC
Secretariat, finalizes the TOR and other action documents, including draft contracts, in
accordance with the procedures laid down in this Manual and in the IRR-A.
5.
The Head of the Procuring Entity approves the action documents, and the BAC informs
the consultant that it is being considered for the project.
6.
The BAC, through the Secretariat, posts for information purposes the IAEB in:
a.
The PhilGEPS;
b.
The website of the Procuring Entity and its electronic procurement service
provider, if any; and
c.
The posting shall be done for a maximum period of fourteen (14) calendar days prior
to bid opening. The Procuring Entity, however, may waive the period for posting in
cases when:
a.
b.
c.
(IRR-A
b.
c.
d.
The BAC issues an RFP to the identified and qualified consultant, with the RFP already
containing the relevant information required for the consultant to prepare its proposal.
The procedures for the conduct of public bidding should be observed. However, the
minimum period for each bidding procedure may be reduced. The consultant informs
the BAC whether or not it is interested to provide the required services for the project.
If the consultant is not interested, the BAC shall invite another qualified consultant.
Page 87 of 108
All Procuring Entities must maintain a registry of contractors as basis for drawing up
the short list and/or selecting the contractors. (IRR-A 54.2 [c])
In cases b, c and d above, the negotiation shall be made with a previous consultant of
good standing of the Procuring Entity concerned, or a consultant of good standing
situated within the vicinity where the calamity or emergency occurred. (IRR-A
Section 54.2 [d])
If the procurement is being negotiated as a result of a terminated or rescinded
contract being taken over because immediate action is necessary to prevent damage
to, or loss of, life or property, or to restore vital public services, infrastructure facilities
and other public utilities (IRR-A Section 53 [c]), then the contract may be
negotiated starting with the second highest rated bidder for the project under
consideration. The negotiation ought to be based on the unit prices of the original
contract, and in no case be higher than the bid price of the consultant with whom
negotiation is being conducted. If negotiation fails, then negotiation must be done
with the third highest rated bidder. If negotiation fails again, the Procuring Entity
must negotiate with a consultant in good standing and with proven track record
therewith or with other government agencies. Authority to negotiate contracts for
projects under these exceptional cases shall be subject to prior approval by the heads
of the Procuring Entities concerned, within their respective limits of approving
authority. (IRR-A Section 54.2 [e])
7.
performance
securities
still
required
for
negotiated
As a general rule, both bid security and performance security must be posted when a
Procuring Entity resorts to negotiated procurement. However, in the case of negotiated
procurement through the hiring of individual consultants or due to imminent danger to life or
property or when time is of the essence or to restore vital public services or infrastructure
facilities, the posting of a bid security shall not be required.
Page 88 of 108
SECTION 4
Guidelines on Contract
Implementation for the
Procurement of Consulting
Services
Page 90 of 108
Can the Procuring Entity make an advance payment for mobilization to the
consultant?
Yes, it can. The Procuring Entity may make an advance payment to the consultant in an
amount that shall not exceed fifteen percent (15%) of the contract amount to cover the cost
of mobilization. The advance payment shall be made only upon the submission of a written
request by the consultant together with an irrevocable standby letter of credit issued by an
entity acceptable to the Procuring Entity and of an amount equal to the advance payment.
(IRR-A Annex F)
How can the Procuring Entity recover the advance payment it made to a
consultant?
The Procuring Entity must recover the advance payment by deducting from the progress
payments to the consultant such sum as agreed during contract negotiations until the
advance payment shall have been fully liquidated within the duration of the contract. (IRR-A
Annex F)
The consultant, for its part, may reduce his standby letter of credit or guarantee instrument
by the amounts refunded in the advance payment.
Page 91 of 108
Page 92 of 108
11
For FAPs, to adjust the remuneration for foreign and/or local inflation, a price adjustment provision should be included
in the contract if its duration is expected to exceed eighteen (18) months. Contracts of shorter duration may include a
provision for price adjustment when local or foreign inflation is expected to be high and unpredictable.
12
For FAPs, RFPs should clearly state that firms may express the price for their services, in any fully convertible
currency. If the consultants wish to express the price as a sum of amounts in different foreign currencies, they may do
so, provided the proposal includes no more than three (3) foreign currencies. The Procuring Entity may require
consultants to state the portion of the price representing costs in the currency of the Procuring Entitys country.
Payment under the contract should be made in the currency or currencies in which the price is expressed in the proposal.
Page 93 of 108
2.
Time-Based Contract
This type of contract is appropriate when it is difficult to define the scope and the
length of the services, either because the services are related to activities by others
for which the completion period may vary, or because the input of the consultants
required to attain the objectives of the assignment is difficult to assess. This type of
contract is widely used for complex studies, supervision of construction, advisory
services, and most training assignments. Payments are based on agreed hourly,
daily, weekly or monthly rates for staff (who are normally named in the contract) and
on reimbursable items using actual expenses and/or agreed unit prices. The rates for
staff include salary, social costs, overhead, fee (or profit), and, where appropriate,
special allowances. This type of contract should include a maximum amount of total
payments to be made to the consultants. This ceiling amount should include a
contingency allowance for unforeseen work and duration, and provision for price
adjustments, where appropriate. Time-based contracts need to be closely monitored
and administered by the client to ensure that the assignment is progressing
satisfactorily and that payments claimed by the consultants are appropriate.
3.
4.
Percentage Contract
These contracts are commonly used for architectural services. They may be also used
for procurement and inspection agents. Percentage contracts directly relate the fees
paid to the consultant to the estimated or actual project construction cost, or the cost
of the goods procured or inspected. The contracts are negotiated on the basis of
market norms for the services and/or estimated staff-month costs for the services, or
competitively bid. It should be borne in mind that in the case of architectural or
engineering services, percentage contracts implicitly lack incentive for economic
design and are hence discouraged. Therefore, the use of such a contract for
architectural services is recommended only if it is based on a fixed target cost and
covers precisely defined services (for example, not works supervision).
5.
Page 94 of 108
Liquidated Damages
Page 95 of 108
Incentive Bonus
Can a Procuring Entity give incentive bonuses to consultants?
No incentive bonus, in whatever form or for whatever purpose, shall be allowed.13 (IRR-A
Section 42.4)
13
For FAPs, any allowable incentive bonus would be provided in the standard bidding documents for the project.
However, an incentive bonus is generally allowed only when it would be of benefit to the Procuring Entity. The option to
grant incentive bonus is given by the IFIs to the Procuring Entity.
Page 96 of 108
Subcontracting
Page 97 of 108
Suspension of Work
2.
Shall request the consultant to remedy such failure within a period not exceeding
thirty (30) days after receipt by the consultant of such notice of suspension.
2.
The Head of the Procuring Entity or his/her duly authorized representative; and
3.
The consultant.
The PMO or end-user unit determines the existence of any of the grounds for
suspension enumerated above.
2.
The PMO or end-user unit drafts the suspension order for the approval of the Head of
the Procuring Entity.
3.
The suspension order is issued to the consultant, stating the grounds therefor.
4.
Prior to the expiration of the suspension order, the PMO or end-user unit shall
determine whether or not the grounds for suspension still exist.
a.
b.
If, however, the grounds for suspension no longer exist, and continuation of
the work is practicable, the PMO, with the approval of the Head of the
Procuring Entity or his/her duly authorized representative, shall lift the
suspension order and notify the consultant to proceed with the work/delivery
of items in accordance with the amended contract.
Page 98 of 108
2.
Peace and order conditions that make it extremely dangerous, if not impossible, to
work, provided that the consultant secures a written certification from the Philippine
National Police station that has responsibility over the affected area, as confirmed by
the Department of the Interior and Local Government Regional Director, that such
conditions exist; or
3.
Delay in the payment of consultants claim for progress billing beyond forty five (45)
calendar days from the time the consultants claim has been certified by the Procuring
Entity as being supported by complete documentation and a notice from the
consultant has been received by the Procuring Entity that such payment is overdue,
unless there are justifiable reasons which shall be communicated in writing to the
consultants.
Page 99 of 108
Legal Reference:
Guidelines on Termination of Contracts, approved by the GPPB through Resolution 018-2004,
dated December 22, 2004.
Outside of force majeure, the consultant fails to deliver or perform the outputs and
deliverables within the period/s specified in the contract, or within any extension
thereof granted by the Procuring Entity pursuant to a request made by the consultant
prior to the delay;
2.
3.
The consultant fails to perform any other obligation under the contract.
The rescission of the contract shall be accompanied by the confiscation by the Procuring Entity
of the consultants performance security. The consultant will also be recommended for
blacklisting. The consultant shall be paid on a quantum meruit basis.
2.
3.
4.
Under what conditions and how may a consultant terminate its contract
with a Procuring Entity?
The consultant may terminate its agreement with the Procuring Entity if the latter is in
material breach of its obligations pursuant to the contract and has not remedied the same
within sixty (60) calendar days following its receipt of the consultants notice specifying such
breach.
The consultant must serve a written notice to Procuring Entity of its intention to terminate the
contract at least thirty (30) calendar days before its intended termination.
In cases of termination, the Procuring Entity shall return to the consultant its performance
security and unpaid claims.
May termination be allowed for reasons other than those attributable to the
consultant?
The Procuring Entity, by written notice sent to the consultant, may terminate the contract, in
whole or in part, at any time for its convenience. The notice of termination shall specify that
the termination is for the Procuring Entitys convenience, the extent to which performance of
the contractor under the contract is terminated, and the date upon which such termination
becomes effective.
2.
The Head of the Procuring Entity has determined the existence of conditions that
make project implementation impractical and/or unnecessary, such as, but not limited
to, fortuitous event/s, changes in laws and government policies;
3.
Funding for the project has been withheld or reduced by higher authorities through no
fault of the Procuring Entity; or
4.
Also see the Guidelines on Termination of Contracts approved by the GPPB in Resolution 0182004, dated December 22, 2004.
Warranty
ANNEX
Frequently Asked Questions
Q1:
A1:
These services, and other general services, are not covered under procurement of
consulting services but under procurement of goods. (IRR-A Section 5 [k])
Q2:
A2:
If the services required for the project are within the expertise and capability of
Filipino consultants, then Filipino consultants shall be hired.
In case Filipino
consultants do not have sufficient expertise and capability to render the required
services, as determined by the head of Procuring Entity, then foreign consultants may
be hired. (IRR-A Section 24.5.2)
Q3:
A3:
For contracts with ABC of P1,000,000 or less, or those whose duration is four months
or less, advertisement in the newspapers may be dispensed with. However, the
Invitation to Apply for Eligibility and to Bid still has to be posted in the agency
website, the PhilGEPS, and in conspicuous places in the agency premises. (IRR-A
Section 21.2.3)
Q4:
A4:
The objective of short listing is to determine the most qualified consultancy firms to
undertake the project. Using the eligibility documents submitted by the eligible
bidders as basis, eligible bidders may be included in the short list taking the following
into consideration: extensive experience in similar projects; qualifications of top
officials of the firms or the experts proposed to be engaged for the project; and job
capacity. (IRR-A Section 24.15.3) Short listing is undertaken primarily due to the
substantial cost incurred by a bidder in preparing a proposal. If all eligible bidders are
invited to submit proposals, the chance of a firm getting the award diminishes greatly.
This discourages a firm from participating because the effort in terms of time and
money is not commensurate to the probability of getting the award. A short list of,
say, five (5) greatly increases the chance of a firm and is thus encouraged to put in
more time and effort in preparing a good proposal.
Q5:
Can the BAC declare a failure of bidding if the number of firms short listed is less than
the number agreed upon during the pre-procurement conference?
A5:
Should less than the required number apply for eligibility and short listing, pass the
eligibility check, and/or pass the minimum score required in the short list, the BAC
shall proceed with the bidding process. (IRR-A Section 24.15.2) Even if only one
firm passes short listing, the firm shall be requested to submit a bid and it shall be
considered for award if the bid is responsive to the bidding requirements. (IRR-A
Section 36)
Q6:
A6:
Q7:
A7:
The Head of the Procuring Entity shall have the option as to the evaluation procedure
to be adopted for the selection of consultants. (IRR-A Section 33.3.1)
Q8:
What is the formula for computing the points for the financial proposal under the
quality-cost based evaluation procedure?
A8:
The IRR does not provide a formula but the most widely adopted scoring method is
that the financial proposal with the lowest cost automatically gets 100 points,
assuming it is within the ABC. The scores of the other financial proposals are
determined by pro-rating their costs with that of the lowest financial proposal.
Q9:
Is the replacement of key staff to be assigned to the project allowed before awarding
of contract?
A9:
Q10:
What happens when, at the stage of negotiation, the consultant and the Procuring
Entity have irreconcilable positions on certain terms and conditions of the draft
contract?
A10:
If the consultant and the Procuring Entity fail to come to an agreement, then
negotiations shall be deemed unsuccessful and negotiations with the next-in-rank
consultant shall be undertaken.
Q11:
Why is the posting of bid security and performance security now required?
A11:
Prior to RA 9184 and its IRR-A, posting of bid and performance securities was not
required. However, due to the number of incidents wherein consultancy firms being
considered for award have refused to accept the award or have simply abandoned
their consultancy assignments, the posting of such securities have not been required
to serve as additional protection for the government and help prevent such incidents
from recurring.
Q12:
A12:
No, the privilege granted to provincial bidders will not apply to procurement of
consulting services, even if the selection of consultant adopted the quality-cost based
evaluation procedure. (IRR-A Section 45.1)
Q13:
Are there alternative methods of procurement that a Procuring Entity may adopt?
A13:
Subject to prior approval by the Head of the Procuring Entity, alternative methods
may be resorted to, that is, limited source bidding and negotiated procurement.
(IRR-A Sections 48.1)
Q14:
How long is the entire process of public bidding for consulting services?
A14: