This document summarizes a Swaraj Yellow Belt project to address issues with a tractor clutch. The project identified four root causes for the clutch not working: a loose M8 bolt, improper feeding from the stores, an unseated cover assembly, and finger clamping load variation. Solutions implemented included torquing identification, implementing a trolley feeding system from stores, changing dimensions per an R&D reference, and getting a vendor commitment to mark release loads. Benefits included annual recurring savings of Rs. 15,360 from reduced rework and a one-time saving of Rs. 480 per tractor. The project improved teamwork, involvement, and prevented reputational harm to the company.

Uploaded by

Arashdeep Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

SYB Final Project Submission Format (TQM-30)

This document summarizes a Swaraj Yellow Belt project to address issues with a tractor clutch. The project identified four root causes for the clutch not working: a loose M8 bolt, improper feeding from the stores, an unseated cover assembly, and finger clamping load variation. Solutions implemented included torquing identification, implementing a trolley feeding system from stores, changing dimensions per an R&D reference, and getting a vendor commitment to mark release loads. Benefits included annual recurring savings of Rs. 15,360 from reduced rework and a one-time saving of Rs. 480 per tractor. The project improved teamwork, involvement, and prevented reputational harm to the company.

Uploaded by

Arashdeep Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Swaraj Yellow Belt (SYB) Project Submission Form (TQM-30)

Division:

SCD (PLANT2)

Date:

PU:

15 -06-09

Project Completion No.:

Problem Title & Definition (Include status before & after): Clutch not working

Project Implemented

Root Causes Identified

Date of
Implementation

Solutions Implemented

M8 bolt loose

Torquing identification systwm with yellow paint

Jan`09

Feeding not Ok

Feeding done by trolley from stores

Feb`09

Cover Assy. not seated

Dimensions changed by R&D ref. no. sc-20/0903/68

April`09

Finger clamping load variation

Commitment by vendor to write release load on each side

April`09

Benefits of the Project: Tangible - Quantitative (Reduction in rejection, Cost, R/1000, Rework etc.
Improvement in Productivity, Schedule Adherence, Delivery, CSI, ESS)

1. Saving of Rs. 480 per tractor


2. Recurring savi g of Rs. 15360 per a

rework (two woworkers for thr hree hours)


annum (3 cases per month*12*480 = 15360)

Benefits of the Project: Intangible - Qualitative

1.Teamwork
2.Sense of involvement and achievement
3.Prevention of bad name to the company

Annual Savings:

One Time

Recurring

Champion:
(PU / PG Leader)
Team Leader:

Token No.

Contact No. (Cell No.)

Mr. Malkiat Singh

Name

3894

Assembly line

Team Members:

Mr. S.P Tyagi

1649

Rework

(Supplier, Customer,
Support functions,

Mr. Arun Sharma

2551

Assly & paint shop

Mr. Manoj

2444

Stores

customers etc.)

Mr. Mandeep sehgal

3070

Quality

Mr. Vishal Mahajan

4017

Function

Impact on:

Cost

Quality

Revenue

CSI / SSI

Delivery

Safety

Quality Engg.

Morale (ESI)

(pl. highlight the relevant Box - Refer original TQM 25 form of registration of this project)

Approval
SYB Candidate:

Sign

Quality Approval:

Name & Sign

Savings validated by Finance:

Name & Sign

PUL / PGL PQ PU
Approved by:

Approved by:

Accepted by:

Champion - PUL / PGL

SVP - Mfg.

Sr. V P (BE) / PGL (Kaizen - SYB)


Format No. TQM-30
(Revision No. 00 ; Date: 31/03/2007)