Chapt 05 PDF
Chapt 05 PDF
CHAPTER V
BAGASSE VOLUME
Still about the operation of one unit of mill, lets back to equation (1):
Or
Wim = Wej + Wb
Wej = Wim - Wb
Wej = Wim (1 -
Because
and
then
Also because:
and
then
:
:
or
therefore
Bagasse Volume
Vb
= -------- (db - dej)
Vim
db - dej
Vim = ------------- Vb ......................................... (6)
dim - dej
V-1
or
Wim = Wij + W f
Wij = Wim - Wf
:
:
then
Also because:
and
then
:
:
or
= Wim (1 -
Wf
Wim
and
Vf
dim - d ij = --------- (df - dij)
Vim
df - dij
Vim = --------------- Vf .................................. (9)
dim dij
Bagasse Volume
V-2
When we look the Brix table5), e.g. for cane juice of 15,9Brix, the density is 1,06077 kg/dm3
compare to juice of mill#1, say = 17,4Brix, the density is 1,06721 kg/dm3, which means there is
only a different of 0,60%. This value is very small if compared to the different in degrees of
Brix, which is about 8,62% (the condition was made by the calculation for mill mass balance,
where assumption is made for the Brix degree of juice in the incoming material have the same
value of Brix degree with the juice extracted by the respective mill).
Based upon the relatively small different of the densities, the writer has the reason why
assumption is made for the above equation, that the density of juice in the incoming material
(dij) is equals to the density of juice extracted by the respective mill (dej).
Thus
dij dej
df - dej
Vb ------------- Vf ................................... (10)
db dej
5)
Bagasse Volume
V-3