Average Load Maximum Load: Problem 01

1) The maximum demand for electricity is 100MW. The plant capacity is 125MW to allow for a 25% reserve capacity. The average load is 37.5MW, resulting in an annual energy consumption of 3.285 billion kWh. 2) The total cost of supplying electricity from a combined steam and hydroelectric plant is Rs. 713.13 million. The unit cost is Rs. 1.66/kWh. 3) Electrifying an isolated village with a small hydro plant would have a unit cost of Rs. 4.21/kWh, while connecting it to the grid would result in a higher unit cost of Rs. 12.96/kWh due to transmission costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

Average Load Maximum Load: Problem 01

1) The maximum demand for electricity is 100MW. The plant capacity is 125MW to allow for a 25% reserve capacity. The average load is 37.5MW, resulting in an annual energy consumption of 3.285 billion kWh. 2) The total cost of supplying electricity from a combined steam and hydroelectric plant is Rs. 713.13 million. The unit cost is Rs. 1.66/kWh. 3) Electrifying an isolated village with a small hydro plant would have a unit cost of Rs. 4.21/kWh, while connecting it to the grid would result in a higher unit cost of Rs. 12.96/kWh due to transmission costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROBLEM 01

Maximum Demand = 100MW


Capacity of the plant = Maximum demand + Reserve Capacity (25%)
=

100+

10025
100

= 125 MW
Load factor =

Average Load
=0.3
Maximum Load

Average Load = 0.3125=37.5 MW

3
a). Annual Energy Consumption = 37.510 kW24365
8

= 3.28510 kWh

b). Total cost = Fixed cost + Semi fixed cost + Running cost
i.

For Combined Steam Power Plant,


Given that this station is in conjunction with a hydroelectric station,
For Hydro Station,
Average output = load factor * Maximum output
= 0.3 * 40
= 12MW
3
3
8
= ( 50004010 ) + ( 50004010 0.15 ) + [ 110 (0.090.4 )]

Cost Hydro

= Rs. 279000000.00
For Steam Station,
Cost steam

3
3
8
= ( 250012510 ) + ( 250012510 0.2 ) +(3.28510 0.18)

= Rs. 434130000.00
Total Cost =

Cost Hydro +Cost steam

= Rs. 279000000.00 + Rs. 434130000.00


= Rs. 713130000.00
Total Units Produced =

( 3.285108 ) + ( 110 8 )

8
= 4.28510 kWh

Unit cost =

Rs .713130000 .00
4.285108

= Rs. 1.66 per kWh

ii.

For Steam Power Plant,


3
3
8
Total cost = ( 250012510 ) + ( 250012510 0.2 ) +(3.28510 0.18)

= Rs. 434130000.00
Unit cost =

Rs .434130000 .00
8
3.28510

= Rs. 1.32 per kWh


iii.

For Hydro Power Plant,


3
3
8
Total cost = ( 500012510 ) + ( 500012510 0.15 ) + [ 3.28510 (0.09+0.4) ]

= Rs. 879715000.00
Unit cost =

Rs .8789715000 .00
3.28510 8

= Rs. 2.68 per kWh


iv.

For Coal Power Plant,


3
3
8
Total cost = ( 300012510 ) + ( 300012510 0.22 ) + [ 3.28510 (0.12+ 0.4) ]

= Rs. 628320000.00
Unit cost =

Rs .628320000 .00
3.28510 8

= Rs. 1.91 per kWh

PROBLEM 02
In this problem, total cost should be covered in 20 years in both cases.

Electrification with a small hydro power unit.


Let P be the amount to be earned per year,
Using sinking fund method,
P
1
1
=1800000 where r=15 n=20 years
r
( 1+r )n

P=

18000000.15
=Rs .287570 .65
1
1
1.1520

Annual energy production per house = 0.15

5365100
80

= 342.1875kWh

(since Efficiency = 80%)


Annual energy production for the village = 342.1875 * 200 = 68437.5 kWh
Unit cost =

Rs .287570 .65
68437.5

= Rs. 4.21 per kWh

Supply of Grid Electricity for isolated village


Total Cost = ( 60000010 )+ ( 4000002 )+500000=Rs .7300000.00
Let Q be the amount to be earned per year,

Q
1
1
=7300000 where r=15 n=20 years
r
( 1+r )n
P=

73000000.15
=Rs .1166258 .75
1
1
1.1520

Annual energy production for the village = 50*12*150 = 90000kWh

Unit cost =

Rs .1166258 .75
90000

= Rs. 12.96 per kWh