0% found this document useful (0 votes)
4 views

Creating The Planning Object Structure Use: Transaction Code Sap SCM Menu

The document provides instructions for creating a planning object structure in SAP Advanced Planning and Optimization. The planning object structure defines the characteristics that form the basis for demand planning and allows a demand planning cycle to be executed. The steps are: 1. Access the administration activity and select Planning Object Structures 2. Create a new planning object structure, enter an ID such as YDP_POS and description 3. Transfer characteristics such as Product, Product Line, Location from the list of available characteristics to the planning object structure 4. Activate and save the new master planning object structure

Uploaded by

ddukem
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Creating The Planning Object Structure Use: Transaction Code Sap SCM Menu

The document provides instructions for creating a planning object structure in SAP Advanced Planning and Optimization. The planning object structure defines the characteristics that form the basis for demand planning and allows a demand planning cycle to be executed. The steps are: 1. Access the administration activity and select Planning Object Structures 2. Create a new planning object structure, enter an ID such as YDP_POS and description 3. Transfer characteristics such as Product, Product Line, Location from the list of available characteristics to the planning object structure 4. Activate and save the new master planning object structure

Uploaded by

ddukem
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Creating the Planning Object Structure

Use
The planning object structure is the structure to be used for the planning area which forms the basis on
which a demand planning cycle can be executed according to the characteristics which have been
created earlier.

Procedure
1

2
3

Access the activity, use one of the following navigation options:


Transaction Code

/SAPAPO/MSDP_ADMIN

SAP SCM Menu

Advanced Planning and Optimization Demand


Planning Environment
/SAPAPO/MSDP_ADMIN - Administration of
Demand Planning and Supply Network Planning

Choose Planning Area and select Planning Object Structures.


Right-click the Plng Object Structures folder and choose Create Planning Object Structures.
Enter the ID of your master planning object structure: for example, YDP_POS. then choose
Enter.
On the S&DP Administration - Configure Planning Object Structure screen, enter the
description in the text field. SNP-possible, SNP scheduling, Char.-based forecasting and DP
BOMs relevant are not used.
Transfer the following Characteristic from the right part (Copy Fr.) to the left part (Planning
Obj. Struct.) of the screen:
Characteristic

Description

ZY93_BC01

Product

ZY93_BC02

Product Line

ZY93_BC03

Location

ZY93_BC04

Customer

ZY93_BC05

Region

ZY93_BC06

Sales Organization

By selecting the info objects the navigation attribute is chose automatically


Choose Activate, then choose Save. The master planning object structure is created.

If you get the error message Error during SID assignment for characteristic
0REQUID (current value 2), follow the instruction in the SAP Notes 615389.

You might also like