Date Name Departme NT Project Title Faculty Name: Weekly Progress Report

Prithu Raj's weekly progress report summarizes his work for the week of June 27th, 2015 as a civil engineering student. During the week, he learned construction methodologies and studied pre-cast pipes and concrete masonry units. He assisted with casting retaining wall footings and walls. Prithu also studied plumbing procedures, a sewage treatment plant feasibility report, and preliminary plumbing and firefighting design reports. His plan for the next week is to further study plumbing and firefighting services design and test plumbing pipes for leaks. The report was authorized by his faculty members Mr. Anil Bhagwat and Mr. Sanjay Kr. Ravi.

Uploaded by

Prithu Raj
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Date Name Departme NT Project Title Faculty Name: Weekly Progress Report

Prithu Raj's weekly progress report summarizes his work for the week of June 27th, 2015 as a civil engineering student. During the week, he learned construction methodologies and studied pre-cast pipes and concrete masonry units. He assisted with casting retaining wall footings and walls. Prithu also studied plumbing procedures, a sewage treatment plant feasibility report, and preliminary plumbing and firefighting design reports. His plan for the next week is to further study plumbing and firefighting services design and test plumbing pipes for leaks. The report was authorized by his faculty members Mr. Anil Bhagwat and Mr. Sanjay Kr. Ravi.

Uploaded by

Prithu Raj
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

WEEKLY PROGRESS REPORT

Date
Name
Departme
nt
Project
Title
Faculty
Name

June 27th,2015
PRITHU RAJ
CIVIL ENGINEERING
SITE SAFETY MEASURES
Mr. Anil Bhagwat/Mr. Sanjay Kr. Ravi

Progress Report : Practical Training


Target
Assign

Achievem
ent
Plan for
Next Week

Learning different construction methodology and


machineries
Layout of Storm Water pipes
(NP2/NP3) and study of pre-cast
pipes.
Learnt about specifications and
construction of concrete masonry
units.
Casting of Retaining wall footings and
wall.
Learnt about the plumbing procedure
in a bathroom with all the technical
details.
Studied the feasibility report of
Sewage Treatment Plant.
Study of preliminary design report of
Plumbing and Firefighting services.
Testing the plumbing pipes for
leakage in kitchen and toilet.

Progress Report : Project

Progress during the week

Plan for Next Week

Layout of Storm Water


pipes (NP2/NP3) and
study of pre-cast pipes.
Learnt about
specifications and
construction of concrete
masonry units.
Casting of Retaining wall
footings and wall.
Learnt about the
plumbing procedure in a
bathroom with all the
technical details.
Studied the feasibility
report of Sewage
Treatment Plant.
Study of preliminary
design report of Plumbing
and Firefighting services.
Testing the plumbing
pipes for leakage in
kitchen and toilet.