SAP Process Flow For RM-PM
SAP Process Flow For RM-PM
BANGLADESH
SAP PROCESS FLOW FOR RAW & PACKAGING MATERIALS
Status
Material
Receiving,
Quality
Inspection
Release
Process
Goods
Received:
Input Purchase
order, Vendor
Batch No.,
Quantity,
Container no.,
Storage
Location,
availability of
COA or not
Issue
QUARANTINED
label
Selection of
task list/
specification
(with provision
of long term
where
applicable) &
sample quantity
calculation,
Vendor COA
Confirmation
Sampling
Issue
SAMPLED label
Testing, Input
test Result in
SAP, Valuate,
Save
Usage Decision
Issue PASSED
label
COA
Preparation
Prepared By:
Transaction Code
Responsibility
Material
Type &
Location
System Status
MIGO
CRTD PASG
SPRQ
WH
ZMM_QUARANTINED
RM, PM
(2003/2004/
2005/2006)
QA32, QC55
QPR2
QC
ZMM_SAMPLED
INSP RREC SPRQ
QLCH
QA32
QA32
ZMM_PASSED
UD ICCO SPCO
CROK STUP
ZMM_COA
Approved By: