Item WP 1-PR-02-A 1-PR-02 1-PR-02-B 1-PR-02
Item WP 1-PR-02-A 1-PR-02 1-PR-02-B 1-PR-02
1-PR-02-A
1-PR-02-B
WP
1-PR-02
1-PR-02
Step
CV1020A
CV1020B
CV1020C
CV1020D
CV1020E
CV1020F
CV1020G
Step_Description
Excavation
Lean Concrete
Formwork
Re-bar & anchor bolts
Concreting
Protection
QC Certificate
Task_Code
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
U_M
M3
M3
M3
M3
M3
M3
M3
Weight
5%
10%
15%
20%
20%
25%
5%
Job_Card_ID
Check
C150CV1020A1-PR-021-PR
C150CV1020B1-PR-021-PR
C150CV1020C1-PR-021-PR
C150CV1020D1-PR-021-PR
C150CV1020E1-PR-021-PR
C150CV1020F1-PR-021-PR
C150CV1020G1-PR-021-PR
C150CV1020A1-PR-021-PR
C150CV1020B1-PR-021-PR
C150CV1020C1-PR-021-PR
C150CV1020D1-PR-021-PR
C150CV1020E1-PR-021-PR
C150CV1020F1-PR-021-PR
C150CV1020G1-PR-021-PR
SCOPE_IDArea
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
1 C150CV10
C150
Activity_Code
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
CV1020
Steps
CV1020A
CV1020B
CV1020C
CV1020D
CV1020E
CV1020F
CV1020G
CV1020A
CV1020B
CV1020C
CV1020D
CV1020E
CV1020F
CV1020G
Steps_Definition
Excavation
Lean Concrete
Formwork
Re-bar & anchor bolts
Concreting
Protection
QC Certificate
Excavation
Lean Concrete
Formwork
Re-bar & anchor bolts
Concreting
Protection
QC Certificate
Weight WP
0.05 1-PR-02
0.1 1-PR-02
0.15 1-PR-02
0.2 1-PR-02
0.2 1-PR-02
0.25 1-PR-02
0.05 1-PR-02
0.05 1-PR-02
0.1 1-PR-02
0.15 1-PR-02
0.2 1-PR-02
0.2 1-PR-02
0.25 1-PR-02
0.05 1-PR-02
item
1-PR-02-A
1-PR-02-A
1-PR-02-A
1-PR-02-A
1-PR-02-A
1-PR-02-A
1-PR-02-A
1-PR-02-B
1-PR-02-B
1-PR-02-B
1-PR-02-B
1-PR-02-B
1-PR-02-B
1-PR-02-B
U_M
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Quantity E_Quantity
120
120
120
120
120
120
120
50
50
50
50
50
50
50
Installed_Quantity
66
12 6
18 0
24 0
24 0
30 0
60
2.5 1.25
50
7.5 0
10 0
10 0
12.5 0
2.5 0
PCT
100.00%
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6-Jan-12 13-Jan-12
100.00%
50.00%
50.00%
20-Jan-12 27-Jan-12
3-Feb-12
10-Feb-12
17-Feb-12
24-Feb-12
2-Mar-12
9-Mar-12
16-Mar-12
23-Mar-12 30-Mar-12
4-May-12
###
###
###
1-Jun-12
29-Jun-12
5-Oct-12 12-Oct-12
1-Feb-13
SCOPE_ID
C150CV10201-PR-02
Area
C150
WP
1-PR-02
Activity_Code U_M
CV1020
M3
Sum - E_Quantity
170
Activity_Code
CV1020
(empty)
Area
C150
WP
1-PR-02
item
1-PR-02-A
1-PR-02-B
Steps_Definition
Excavation
Lean Concrete
Formwork
Concreting
Protection
QC Certificate