The dilapidation report summarizes damage found along KM 9.3 of a highway. Several units inspected the area and reported damaged items. The Construction and Surveying Unit inspected on February 12th and found 5 broken guardrail beams, 10 damaged posts, 14 broken packers, and 4 broken delineator signs. They commented that the damaged guardrail and other items needed immediate repair for safety and image reasons. The report was prepared by Muhamad Salman Farisi of the Construction and Surveying Unit and approved by the Chief Operating Officer, Teoh Jui Min.

Uploaded by

Salman Farisi
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views

Dilapidation Report

The dilapidation report summarizes damage found along KM 9.3 of a highway. Several units inspected the area and reported damaged items. The Construction and Surveying Unit inspected on February 12th and found 5 broken guardrail beams, 10 damaged posts, 14 broken packers, and 4 broken delineator signs. They commented that the damaged guardrail and other items needed immediate repair for safety and image reasons. The report was prepared by Muhamad Salman Farisi of the Construction and Surveying Unit and approved by the Chief Operating Officer, Teoh Jui Min.

Uploaded by

Salman Farisi
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

DILAPIDATION REPORT

Section

Ref No. : SKVE/O&M/DAMAGED/016

: Section 1b

Location / KM : KM 9.3 - Shoulder ( WB) & Ramp to 16 Sierra (RH)


Report from Traffic Safety Unit
Date of Inspection :

Damaged Items

Report from M&E Unit


Date of Inspection :

Damaged Items

Report from C&S Unit


Date of Inspection : 12-2-2014

Damaged Items

1)

1)

2)

9' Buffer end= 1 (including sticker)

3)

Rectification Works

Guardrails : Beam= 5, Post= 10, Packer=14, DS=4

2)

Rectification Works
1)

Obstruction & double arrow Sign and post=1

Rectification Works
1)

immediately repair all damaged item

2)
3)

Comments by Traffic Safety Unit

Comments by M&E Unit

Comments by C&S Unit

: Damaged on guardrail and others damaged item need to rectify immediately due to Safety & SKVE's image.

Issued by Traffic Safety Unit:


Signed By

Name

Designation

Remarks

Remarks

Remarks

Remarks

Remarks

Issued by Traffic M&E Unit:


Signed By

Name

Designation

Issued & Prepared by C&S Unit:


Signed By

Name

: Muhamad Salman Farisi

Designation

: C&S Asst. Engineer

Verified by:
Signed By

Name

: Zainal Alam Kamaruzzaman

Designation

: GM - O&M Division

Approved by:

MT 07/FM

Signed By

Name

: Teoh Jui Min

Designation

: Chief Operating Officer