Route Card: Material Summary
Route Card: Material Summary
Material Grade:
RM Rec. Date :
Supplier :
Supply
Condition
CUTTING
Issued
Recd By
by
As Forged
Normalizing
Heat No. :
Issue Qty
(No of Bars):
Material Summary
IBH
O.H.F.
Material section:
Cut Wt :
Qty. (MT):
Grinding Shotblast
Pre-machining
MPI Testing
Ni-Spot Testing
Forwarded Date:
Actual End
wastage (%):
Cutting Date
End
Wastage
(Kgs):
End
Wastage
Reused (kg)
Chip
Loss
(Kgs):
Total
FORGING
Issued
Recd By
by
Forwarded Date:
Forging Date
Forged qty
(pcs)
OK Qty (Pcs)
Rework qty
(Pcs):
Total
NORMALISING / ISO TH. ANNEAL. / HARD. & TEMP.
Issued
Recd By
by
Receiving Date
Forwarded Date:
Processed
qty (pcs)
OK Qty (Pcs)
Rework qty
(Pcs):
Total
GRINDING / SHOT
BLASTING
Issued
Recd By
by
Forwarded Date:
Processed
qty (pcs)
OK Qty (Pcs)
Rework qty
(Pcs):
Page 1QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016
Spa
Route Card
Total
Pre-machining
Issued
Recd By
by
Forwarded Date:
Machin'ng
Date
Machined
qty (pcs)
OK Qty (Pcs)
Rework qty
(Pcs):
Total
Testing
Issued by
Recd By
Forwarded Date:
Inspection
Date
Inspected
qty (pcs)
OK Qty (Pcs)
Rework qty
(Pcs):
Hardness
Testing
MPI
Testing
Ni-Spot
Testing
Spark Testing
U. Testing
Other :
Total
PDI
Issued
Recd By
by
Forwarded Date:
Inspection
Date
Inspected
qty (pcs)
OK Qty (Pcs)
Rework qty
(Pcs):
Total
CONCLUSION
Dispatch
qty
Invoice
Difference
(Issue - Dispatch) kgs
Difference
(Issue Dispatch) %
Gr wt
achieved
(Cut wt +
Diff%)
Settled Gr wt
Page 2QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016
Route Card
Page 3QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016
Date :
Gross wt :
Target Qty(Pcs) :
Invoice No. :
Dispatch Qty
(Pcs) :
Ni-Spot Testing
Rejected
(Pcs) :
Spark Testing
Rejection
(%) :
Ultra.S. Testing
Date:
Bal (Kgs)
Supervisor
Name
Sign
Date:
Rejection (Pcs)
Supervisor
Name
Sign
Date:
Rejection (Pcs)
Supervisor
Name
Sign
Date:
Rejection (Pcs)
Supervisor
Name
Sign
Page 4QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016
Date :
Date:
Rejection (Pcs)
Supervisor
Name
Sign
Date:
Rejection (Pcs)
Supervisor
Name
Sign
Date:
Rejection (Pcs)
Diff of Gr wt
(Settled - Gr wt
achieved)
Supervisor
Name
Total diff
(kgs) : Diff
Gr wt *
Dispatch
qty)
Sign
Profit/Loss
in value
( RM +
Conversion
- Scrap)
Page 5QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016
Date :
Page 6QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016
Supplier
Heat Nr:
Raw Material
VCI lot nr: Grade
Section
Weight