100% found this document useful (1 vote)
6K views

Route Card: Material Summary

1. The route card provides information on the production process for a part from receipt of raw materials through various production steps to final dispatch. 2. It tracks key details at each stage including quantities and weights received and processed, rejection quantities, responsible personnel, and dates. 3. The conclusion section summarizes total dispatch quantities and weights, calculates differences from initial issue quantities, and notes gross weight achieved and settled gross weight.

Uploaded by

Balram Ji
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
6K views

Route Card: Material Summary

1. The route card provides information on the production process for a part from receipt of raw materials through various production steps to final dispatch. 2. It tracks key details at each stage including quantities and weights received and processed, rejection quantities, responsible personnel, and dates. 3. The conclusion section summarizes total dispatch quantities and weights, calculates differences from initial issue quantities, and notes gross weight achieved and settled gross weight.

Uploaded by

Balram Ji
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 7

Route Card

Route Card No.:

Part Name / No. :

Material Grade:

RM Rec. Date :

Supplier :

Supply
Condition

CUTTING
Issued
Recd By
by

As Forged

Normalizing

VCI Lot Code:

Heat No. :

Issue Qty
(No of Bars):

Issue Qty (Kgs):

Material Summary
IBH
O.H.F.

Material section:

ISO Th. Annealing

Hard & Temp.

Cut Wt :

Qty. (MT):

Actual cut qty


(pcs) :

Grinding Shotblast

Pre-machining

Received Qty (Kgs)

MPI Testing

Ni-Spot Testing

Forwarded Date:

Route Card Received Date:


Receiving Date

Actual End
wastage (%):

Cutting Date

Cut qty (pcs)

Cut Qty (Kgs)

End
Wastage
(Kgs):

End
Wastage
Reused (kg)

Chip
Loss
(Kgs):

Total
FORGING
Issued
Recd By
by

Forwarded Date:

Route Card Received Date:


Receiving Date

Received Qty (Pcs)

Forging Date

Forged qty
(pcs)

OK Qty (Pcs)

Rework qty
(Pcs):

Total
NORMALISING / ISO TH. ANNEAL. / HARD. & TEMP.

Issued
Recd By
by

Receiving Date

Forwarded Date:

Route Card Received Date:

Received Qty (Pcs) Process Date

Processed
qty (pcs)

OK Qty (Pcs)

Rework qty
(Pcs):

Total
GRINDING / SHOT
BLASTING

Issued
Recd By
by

Forwarded Date:

Route Card Received Date:


Receiving Date

Received Qty (Pcs) Process Date

Processed
qty (pcs)

OK Qty (Pcs)

Rework qty
(Pcs):

Page 1QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016

Spa

Route Card

Route Card No.:

Total
Pre-machining

Issued
Recd By
by

Forwarded Date:

Route Card Received Date:


Receiving Date

Received Qty (Pcs)

Machin'ng
Date

Machined
qty (pcs)

OK Qty (Pcs)

Rework qty
(Pcs):

Total
Testing
Issued by

Recd By

Forwarded Date:

Route Card Received Date:


Receiving Date

Received Qty (Pcs)

Inspection
Date

Inspected
qty (pcs)

OK Qty (Pcs)

Rework qty
(Pcs):

Hardness
Testing
MPI
Testing
Ni-Spot
Testing
Spark Testing

U. Testing
Other :

Total
PDI
Issued
Recd By
by

Forwarded Date:

Route Card Received Date:


Receiving Date

Received Qty (Pcs)

Inspection
Date

Inspected
qty (pcs)

OK Qty (Pcs)

Rework qty
(Pcs):

Total

CONCLUSION
Dispatch
qty

Invoice

Total dispatch (pcs)

Total dispatch (cut


wt * qty dispatch)
(kgs)

Difference
(Issue - Dispatch) kgs

Difference
(Issue Dispatch) %

Gr wt
achieved
(Cut wt +
Diff%)

Settled Gr wt

Page 2QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016

Route Card No.:

Route Card

Page 3QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016

Date :
Gross wt :

Target Qty(Pcs) :

Invoice No. :

Dispatch Qty
(Pcs) :

Ni-Spot Testing

Rejected
(Pcs) :

Spark Testing

Rejection
(%) :

Ultra.S. Testing

Date:
Bal (Kgs)

Supervisor
Name

Sign

Date:
Rejection (Pcs)

Supervisor
Name

Sign

Date:
Rejection (Pcs)

Supervisor
Name

Sign

Date:
Rejection (Pcs)

Supervisor
Name

Sign

Page 4QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016

Date :

Date:
Rejection (Pcs)

Supervisor
Name

Sign

Date:
Rejection (Pcs)

Supervisor
Name

Sign

Date:
Rejection (Pcs)

Diff of Gr wt
(Settled - Gr wt
achieved)

Supervisor
Name

Total diff
(kgs) : Diff
Gr wt *
Dispatch
qty)

Sign

Profit/Loss
in value
( RM +
Conversion
- Scrap)

Page 5QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016

Date :

Page 6QFM-PROD-18
of 7
Rev. No. 01 w.e.f. 25.10.2016

Supplier

Heat Nr:

Raw Material
VCI lot nr: Grade

Section

Weight

You might also like