Wbs of A Formula One Car

The document discusses the work breakdown structure (WBS) of building a Formula One car. It defines a WBS as a hierarchical decomposition of work required to complete a project's objectives and deliverables. The WBS for a Formula One car would break down the large project into smaller elements such as designing the chassis, engine, electronics, and other components before integrating them into the final car. A WBS provides a way to visualize the project structure, assign work, and distribute time and costs across each element of building a Formula One car.

Uploaded by

Saqib Iqbal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
369 views

Wbs of A Formula One Car

The document discusses the work breakdown structure (WBS) of building a Formula One car. It defines a WBS as a hierarchical decomposition of work required to complete a project's objectives and deliverables. The WBS for a Formula One car would break down the large project into smaller elements such as designing the chassis, engine, electronics, and other components before integrating them into the final car. A WBS provides a way to visualize the project structure, assign work, and distribute time and costs across each element of building a Formula One car.

Uploaded by

Saqib Iqbal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

WBS of a Formula

One Car
Engineering Economics
and Management

Name:
Roll No.:

Saqib Iqbal
D-14-CS-07

Submitted to: Engr. Maria Bashir

What is a WBS?
The Work Breakdown Structure (WBS) is defined by A Guide to the Project
Management Body of Knowledge 3rd Edition (PMBOK Guide) as:
"A deliverable-oriented hierarchical decomposition of the work to be
executed by the project team to accomplish the project objectives
and create the required deliverables."
A work breakdown structure is not a list of tasks, a schedule or an
organization chart. Rather it provides the basis on which a task list and a
schedule can be constructed.
A work breakdown structure can show you at a glance:

What the various elements of the project are


How the necessary work is distributed between the elements of the
project
How the cost or budget is distributed between the elements of the
project
How the larger elements of the project are subdivided into smaller
ones.

WBS of a FORMULA ONE CAR

Step 1:
Step 2:

Step 3:

Step 4 / Last Step:

TABULAR FORM: