The document calculates the overall equipment effectiveness (OEE) of a production line over an 8 hour shift. It provides data on shift length, breaks, downtime, production rates, pieces produced, rejected pieces. Availability was 88.81% as operating time was 373 minutes of the planned 420 minutes. Performance was 86.11% as the actual production rate was slightly below the ideal rate. Quality was 97.80% as reject pieces were only 2.2% of total pieces. The overall OEE was calculated to be 74.79%.
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
25 views
Calculating OEE
The document calculates the overall equipment effectiveness (OEE) of a production line over an 8 hour shift. It provides data on shift length, breaks, downtime, production rates, pieces produced, rejected pieces. Availability was 88.81% as operating time was 373 minutes of the planned 420 minutes. Performance was 86.11% as the actual production rate was slightly below the ideal rate. Quality was 97.80% as reject pieces were only 2.2% of total pieces. The overall OEE was calculated to be 74.79%.