0% found this document useful (0 votes)
61 views

Cement Excess: Admin Comments

Cement volumes are usually applied in excess of calculated theoretical volumes for open hole and casing annulus spaces. Care must be taken to ensure cement does not reach the subsea wellhead or mudline. Volumes pumped may be adjusted to plan the top of cement 500 feet below the seabed.

Uploaded by

zapspaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views

Cement Excess: Admin Comments

Cement volumes are usually applied in excess of calculated theoretical volumes for open hole and casing annulus spaces. Care must be taken to ensure cement does not reach the subsea wellhead or mudline. Volumes pumped may be adjusted to plan the top of cement 500 feet below the seabed.

Uploaded by

zapspaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CEMENT EXCESS

admin | November 27, 2009 | Comments (0)


CEMENT EXCESS
The following excess cement volumes are usually applied to the calculated
theoretical open hole and casing annulus volumes.

* Note: Care should be taken to ensure cement does not reach the subsea wellhead or mudline.Volumes pumped
may be adjusted to plan the top of cement at 500 ft below seabed