0% found this document useful (0 votes)
25 views

Ground Floor First Floor Second Floor Third Floor Partapartbparta Part B Part A Partbpartapartb

The document outlines the tasks and items required for the REMRAAM Housing Project at Dubai Land Phase 2A. It details the work to be done on each floor and part of two housing clusters, including builders work, installation of duct supports and copper pipe supports, and duct installation. It also includes a table listing the number of floor cooling units (FCUs) needed on each floor and part of building A5-A5. The client is Mizin LLC and Dubai Properties LLC, and the consultant is Khatib & Alami Consolidated Engineering LLC.

Uploaded by

Mohammed Azhar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Ground Floor First Floor Second Floor Third Floor Partapartbparta Part B Part A Partbpartapartb

The document outlines the tasks and items required for the REMRAAM Housing Project at Dubai Land Phase 2A. It details the work to be done on each floor and part of two housing clusters, including builders work, installation of duct supports and copper pipe supports, and duct installation. It also includes a table listing the number of floor cooling units (FCUs) needed on each floor and part of building A5-A5. The client is Mizin LLC and Dubai Properties LLC, and the consultant is Khatib & Alami Consolidated Engineering LLC.

Uploaded by

Mohammed Azhar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Project: REMRAAM Housing Project at Dubai Land Phase 2A

Client:
Mizin LLC/ Dubai Properties LLC
Consultant: Khatib & Alami Consolidated Engineering LLC
Cluster 3
Task

Ground Floor
First Floor
Part A Part B Part A Part B

Second Floor
Third Floor
Part A Part B Part A Part B

Ground Floor
First Floor
Part A Part B Part A Part B

Second Floor
Third Floor
Part A Part B Part A Part B

Builders work
Installation of Duct
Supports
Installation of Copper pipe
supports
Installation of Duct

Cluster 7
Task
Builders work
Installation of Duct
Supports
Installation of Copper pipe
supports
Installation of Duct

Fourth Floor
Fifth floor
Sixth floor
Part A Part B Part A Part B Part A Part B

Fourth Floor
Fifth floor
Sixth floor
Part A Part B Part A Part B Part A Part B

Project: REMRAAM Housing Project at Dubai Land Phase 2A


Client:
Consultant: Khatib & Alami Consolidated Engineering LLC
A5-A5
Item
FCU

Ground Floor
First Floor
Part A
Part B Part A
Part B
19
22
20

Second Floor
Third Floor
Part A
Part B
Part A
20
17
17
13

Third Floor
Part B

Fourth Floor
Part A
Part B
13
13

Fifth floor
Part A
Part B
13
13

Sixth floor
Part A
Part B
13

Roof
Part A
3

Roof
Part B
3