Sea Structure
Sea Structure
1.
Overview
2.
Moblization
3.
4.
5.
6.
7.
St.Regis Langkawi
Hotel
Sequence of work
Casting of Capital
St.Regis Langkawi
Hotel
Moblization
The nature of offshore walkway work required a lot of vessels such as anchor boat, crane barge and material barge.
List of Plant & Machinery used at offshore & land area.
<Tug boat>
<Barge>
St.Regis Langkawi
Hotel
Access Route
Low tide
Place in Steel plate at the access route of c/crane.
High Tide
Use a barge, The c/crane will be loaded in barge.
St.Regis Langkawi
Hotel
Casting of Capital
P.C
Beam
R.C Casting
Capital
Finalize in cast-in-situ
Fanal casting
bracket
Water level
6m
Water level
6m
scaffolding
Water level
6m
Pile
St.Regis Langkawi
Hotel
Cast-in-situ
Plywood
Timber
Hollow
Section
Bracket
Final Cast-insitu
St.Regis Langkawi
Hotel
Site Organization
Admin.
Site
supervisor
Engineer
PROJECT
Safety
Lifting
MANAGER
supervisor
Re-bar
forman
Form
supervisor
supervisor
Conc.
forman