1. The document outlines the mobilization, zoning plan, construction methods, and schedule for installing overwater walkways and villas at the St. Regis Langkawi Hotel. 2. Mobilization will require various vessels such as anchor boats, crane barges, and material barges to access the offshore work areas. 3. The zoning plan divides the work area into accessible and inaccessible areas based on tide levels, requiring the use of steel plates or barges.

Uploaded by

Muhammad Uwais
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Sea Structure

1. The document outlines the mobilization, zoning plan, construction methods, and schedule for installing overwater walkways and villas at the St. Regis Langkawi Hotel. 2. Mobilization will require various vessels such as anchor boats, crane barges, and material barges to access the offshore work areas. 3. The zoning plan divides the work area into accessible and inaccessible areas based on tide levels, requiring the use of steel plates or barges.

Uploaded by

Muhammad Uwais
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Contents

1.

Overview

2.

Moblization

3.
4.
5.
6.
7.

Zoning Plan(Based on Access Route)


Basic Method of Walkway Installation
Capital Casting method
Site Organization
Schedule for walkway & water villas

Overwater Villa & Walkway

St.Regis Langkawi
Hotel

Overall Work Sequence

Sequence of work

Temporary access road


Work

Casting of Capital

P.C Beam Installation

Half P.C Installation

Final Casting Concrete

Overwater Villa & Walkway

St.Regis Langkawi
Hotel

Moblization
The nature of offshore walkway work required a lot of vessels such as anchor boat, crane barge and material barge.
List of Plant & Machinery used at offshore & land area.

1 Units of Steel dumb barge


1 Unit of Tug boat & pontoon
2 Unit of 50 ton cw/crane
1 Units of small boat
1 Unit of bobcat
1 Unit of forklift

<Tug boat>

<Barge>

Overwater Villa & Walkway

St.Regis Langkawi
Hotel

Zoning Plan(Based on Access Route)

Access Route

Low tide
Place in Steel plate at the access route of c/crane.

High Tide
Use a barge, The c/crane will be loaded in barge.

Overwater Villa & Walkway

St.Regis Langkawi
Hotel

Basic Method of Walkway Installation


1.
2.
3.
4.
5.

Temporary Access (scaffolding / bracket used)


Casting in situ of Capital
Precast Concrete Beam will be installed in the middle of capital
Half Precast Concrete Slab will be added on top of P.C beam
Finalize the Walkway in cast-in-situ

P.C Beam Installation


Half P.C Installation

Casting of Capital

P.C
Beam

R.C Casting
Capital

Finalize in cast-in-situ

Half P.C Slab

Fanal casting

bracket
Water level

6m

Water level

6m
scaffolding

Water level

6m
Pile

Overwater Villa & Walkway

St.Regis Langkawi
Hotel

Capital Casting method

Cast-in-situ
Plywood

Timber

Hollow
Section

Bracket
Final Cast-insitu

Half P.C Slab


P.C Beam

Overwater Villa & Walkway

St.Regis Langkawi
Hotel

Site Organization

Admin.

Site

supervisor

Engineer

PROJECT

Safety

Lifting

MANAGER

supervisor

Re-bar
forman

Form
supervisor

supervisor

Conc.

forman