Internship Log: Day No. Work Done Chainage Date Signature 1 2 3 4 5 6 7 8 9 10 11 12 13

Bhupendra Kumar completed an internship with URS Scott and Wilson & Rodic Consultant (JV) from June 3rd to July 3rd. Over the course of 22 days, he conducted various field tests related to soil, concrete, and pavement quality including compressive strength tests, density tests, CBR tests, and Marshall stability tests. He also studied bridge reinforcement details such as soffit, pre-cast I girders, box girders, and deck slabs. Other activities included observing grouting of pre-tensioned girders, post-tensioning details, laying of pavement materials, and casting of bridge elements.

Uploaded by

BhupenderKumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

Internship Log: Day No. Work Done Chainage Date Signature 1 2 3 4 5 6 7 8 9 10 11 12 13

Bhupendra Kumar completed an internship with URS Scott and Wilson & Rodic Consultant (JV) from June 3rd to July 3rd. Over the course of 22 days, he conducted various field tests related to soil, concrete, and pavement quality including compressive strength tests, density tests, CBR tests, and Marshall stability tests. He also studied bridge reinforcement details such as soffit, pre-cast I girders, box girders, and deck slabs. Other activities included observing grouting of pre-tensioned girders, post-tensioning details, laying of pavement materials, and casting of bridge elements.

Uploaded by

BhupenderKumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Internship Log

Name -Bhupendra Kumar


Program- B.Tech - Civil
URS Scott and Wilson & Rodic Consultant (JV)
Day
no.
1

Work done

Chainage

Date

54+00

03-06-15

71+250

04-06-15

21+550

05-06-15

QA/QC lab : Comressive strength of


cube
Field dry density test of WMM 1 of
service road (LHS)
Field Dry Density test of GSB top of
service road (RHS)
Vertical pile load test of pile

22+850

08-06-15

Study of reinforcement of Soffit

25+650

09-06-15

Study of reinforcement of pre-cast I


girder
Grouting of pre-tensioned i gider

54+00

10-06-15

54+00

11-06-15

Study of reinforcement of future pretensioning of box girder


QA/QC lab:Liquid limit And Plstic
limit test of soil from chappra quary
QA/QC lab:Silt content of soil from
chappra quary

25+650

12-06-15

54+00

15-06-15

54+00

16-06-15

11

Post tensioning details of box girder

25+650

17-06-15

12

Box girder :soffit reinforcement

26+950

18-06-15

13

Checking of profiling of pvc pipes


and reinforcement of soffit , CBR test
of soil from chappra quarry
QA/QC lab:MDD of soil from
chappra quarry

25+650 - 54+00

19-06-15

54+00

22-06-15

15

Reinforcement of Deck Slab

26+950

23-06-15

16

Reinforcement of pier cap

29+500

24-06-15

17

48+00

25-06-15

18

Pavement Design report, cement


batching plant and WMM batching
plant.
Laying of WMM 1 of MCW

28+00

26-06-15

19

Casting of pier cap

29+500

27-06-15

2
3

7
8
9
10

14

Signature

20

Surface regularity checking, casting

82+00

29-06-15

21

Laying of BC of MCW (LHS)

82+00

30-06-15

22

casting of moulds for marshall


stability test, visit to batching plant of
bitumen
Marshall stability Test of BC,
Casting of deckslab
Bump Indicator test of elevated
highway of NH-2

48+00

01-07-15

48+00 -31+00

02-07-15

16+100 - 20+500

03-07-15

23